Glen Lednock (Glen Lednock Wind Farm Limited)

Developer as published, connection site, reference: Glen Lednock Wind Farm Limited. Glen Lednock 132kV Substation (SHET). PRO-004520.

Sign in to watch this project
Capacity165 MWHybrid, Gate 1
Connection date30 Nov 2031Status as printed: Scoping
First date seen 31 Oct 2031, difference +30 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20312032File dated 2026-09-11: connection date 2031-10-31Oct 2031File dated 2026-10-20: connection date 2031-11-30Nov 203111 Sep202620 Oct2026
20312032File dated 2026-09-11: connection date 2031-10-31Oct 2031File dated 2026-10-20: connection date 2031-11-30Nov 203111 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 886Receipt: NESO TEC Register, file dated 11 Sep 2026, row 865
  2. 20 Oct 2026. MW Effective From printed as 30 Nov 2031 (previous file: 31 Oct 2031), 30 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +30 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 886Receipt: NESO TEC Register, file dated 11 Sep 2026, row 865