Queue movers: the TEC Register, edition by edition

What changed between consecutive editions of NESO's Transmission Entry Capacity (TEC) Register, as printed. Supported by National Energy SO Open Data.

File dated 11 Sep 2026compared withFile dated 20 Oct 2026How the files are matchedThe file dated 11 Sep 2026 is an archived copy (Internet Archive), not a file N84 collected from NESO.

N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; each change below happened at some point in that time, not necessarily this week. Wide comparisons

Changes between the two files

423 changesacross 356 projects. Net change −1.62 GW (new, left the register and capacity changes), plus 13.09 GW back on the register after being absent from the archived copies dated 8 Sep 2026 and 11 Sep 2026 (Internet Archive).
Rows matched on Project Number. "Back on the register": absent from the previous file N84 holds, printed again in this one. Net change calculated by N84 from Cumulative Total Capacity as printed. NESO TEC Register, files dated 11 Sep 2026 and 20 Oct 2026. Supported by National Energy SO Open Data.
Table view
Changes by type
TypeChanges
Status, stage or gate changed242
Connection date later74
Connection date earlier58
Back on the register27
New on the register10
Left the register7
Capacity changed3
Connection date added or removed2

Capacity in and out

TEC file dated 20 Oct 2026 against 11 Sep 2026 (archived copy)

New: +1.9 GW+1.9 GWNewCapacity up: 0 MW0 MWCapacity upCapacity down: −699 MW−699 MWCapacity downRemoved: −2.8 GW−2.8 GWRemovedNet: 1.6 GW1.6 GWNet
New: +1.9 GW+1.9 GWNewCapacity up: 0 MW0 MWCapacityupCapacity down: −699 MW−699 MWCapacitydownRemoved: −2.8 GW−2.8 GWRemovedNet: 1.6 GW1.6 GWNet

Not in the chart: 13.09 GW across 27 projects back on the register, absent from the archived copies dated 8 Sep 2026 and 11 Sep 2026 (Internet Archive) and printed again in the file dated 20 Oct 2026. See them

NESO TEC Register, files dated 11 Sep 2026 and 20 Oct 2026. Supported by National Energy SO Open Data. Capacity is Cumulative Total Capacity as printed.
Table view
Capacity in and out
StepMW
New+1,921.7
Capacity up0
Capacity down−699.4
Removed−2,845.9
Net1,623.6
Back on the register (not in the net)13,089.5

Biggest date moves

Ninfield1,000 MW, energy storage system;pv array (photo voltaic/solar)
31 Oct 203031 Oct 2037
Sussex and Romney Connection Node A 400kV Substation+2,557 days
Beinn Dearg290 MW, energy storage system;pv array (photo voltaic/solar);wind onshore
31 Oct 203131 Oct 2037
NEW TAYNUILT 132 KV SUBSTATION+2,192 days
Ewerby500 MW, demand;energy storage system;pv array (photo voltaic/solar)
30 Oct 202930 Oct 2035
Navenby 400kV Substation+2,191 days

The days are calculated by N84 from the two printed dates. The register does not say why a date moved.

Data centres in the pipeline

30 sites

Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.

See every site

Every change, in full

Every change between the two files, grouped by type
ProjectConnection siteWhat the files print
New on the register 10
Vanguard
PRO-000459-1, NORFOLK VANGUARD WEST LIMITED
Necton 400kV Substation
Wind Offshore
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Oct 2026
Vanguard
PRO-000459-2, NORFOLK VANGUARD WEST LIMITED
Necton 400kV Substation
Wind Offshore
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 1,320 MW in the file dated 20 Oct 2026
PeakGen BEGA - Didcot
PRO-006058, PEAK GEN POWER LIMITED
Didcot GSP
Oil & AGT (Advanced Gas Turbine)
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 4 MW in the file dated 20 Oct 2026
PeakGen BEGA - Hatfield
PRO-006066, PEAK GEN TOP CO LIMITED
Hatfield GSP
Oil & AGT (Advanced Gas Turbine)
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 6 MW in the file dated 20 Oct 2026
PeakGen BEGA - Haydock
PRO-006067, PEAK GEN POWER LIMITED
Haydock GSP
Oil & AGT (Advanced Gas Turbine)
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 6 MW in the file dated 20 Oct 2026
PeakGen BEGA - Coventry
PRO-006068, PEAK GEN TOP CO LIMITED
Coventry GSP
Oil & AGT (Advanced Gas Turbine)
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 6 MW in the file dated 20 Oct 2026
Care Brentwood BEGA
PRO-006780, CARE POWER (BRENTWOOD) LIMITED
Warley GSP
Energy Storage System
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Oct 2026
Care Power Berkeley BEGA
PRO-006810, Care Power (Berkeley) Limited
Severn Connection Node A 132kV Substation
Energy Storage System
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Oct 2026
Care Wolverhampton BEGA
PRO-006837, CARE POWER (WOLVERHAMPTON) LIMITED
Penn GSP
Energy Storage System
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Oct 2026
Care North Tawton BEGA
PRO-006838, CARE POWER (NORTH TAWTON) LIMITED
Alverdiscott GSP
Energy Storage System
Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 30 MW in the file dated 20 Oct 2026
Back on the register 27
Immingham
PRO-000053-1, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 1,268 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 22 Jul 2025
Immingham
PRO-000053-2, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 1,318 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 22 Jul 2025
Strathy Wood Wind Farm
PRO-000154, RWE Renewables UK Onshore Wind Limited
Strathy Wood 132/33kV Substation
Wind Onshore
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 63.5 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 31 May 2024
Elmya Dunbar BESS
PRO-002290, ELMYA ENERGY UK 1 LIMITED
Thorntonloch 400kV Substation
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 400 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Bulls Lodge Farm
PRO-002676, 548 UK INVESTMENT HOLDINGS LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Patford Bridge Farm
PRO-002680, 548 UK INVESTMENT HOLDINGS LIMITED
Patford Bridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Enderby Farm
PRO-002682, 548 UK INVESTMENT HOLDINGS LIMITED
Earl Shilton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Ryhall Farm
PRO-002684, 548 UK INVESTMENT HOLDINGS LIMITED
Casewick 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Sundon Farm
PRO-002685, 548 UK INVESTMENT HOLDINGS LIMITED
Dunstable 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Yaxley Farm
PRO-002688, 548 UK INVESTMENT HOLDINGS LIMITED
Yaxley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Bulls Lodge Farm 2
PRO-002737, 548 UK INVESTMENT HOLDINGS LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 350 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Marston Farm 2
PRO-002740, 548 UK INVESTMENT HOLDINGS LIMITED
Marston Vale 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 350 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Patford Bridge Farm 2
PRO-002741, 548 UK INVESTMENT HOLDINGS LIMITED
New Patford Bridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 350 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Enderby Farm 2
PRO-002743, 548 UK INVESTMENT HOLDINGS LIMITED
Earl Shilton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 700 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Sundon Farm 2
PRO-002746, 548 UK INVESTMENT HOLDINGS LIMITED
Dunstable 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 700 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Hunterston
PRO-003182, ELMYA RPC UK HUNTERSTON LIMITED
KEPPEN BURN 400KV SUBSTATION
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 400 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Blairgowrie BESS
PRO-003482, WOODSIDE BESS LTD
Blairgowrie BESS 132kV Substation
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Dalry BESS & PV
PRO-003735, ELMYA ENERGY UK 17 LIMITED
Dalry 400kV Substation
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 800 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Morningside BESS & PV
PRO-004396, ELMYA RPC UK MORNINGSIDE LIMITED
Elmya Morningside 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 400 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Bearsden BESS
PRO-004404-1, BEARSDEN BESS LTD
BEARSDEN BESS 275KV SUBSTATION
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 100 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Bearsden BESS
PRO-004404-2, BEARSDEN BESS LTD
BEARSDEN BESS 275KV SUBSTATION
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 240 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Bathgate BESS
PRO-004416, RPC ELMYA CARNATION BATHGATE LIMITED
Armadale 400kv Substation
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 300 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Gissing BESS & PV
PRO-004657, RPC ELMYA CARNATION GISSING LIMITED
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 900 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Kilworth BESS & PV
PRO-004739, RPC ELMYA CARNATION KILWORTH LIMITED
Derbyshire Connection Node H 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 850 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Towcester BESS
PRO-004809, RPC ELMYA CARNATION TOWCESTER LIMITED
Derbyshire Connection Node I 400kV Substation
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 550 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Ryston BESS & PV
PRO-004923, ELMYA ENERGY UK 13 LIMITED
North Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 850 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Elmya Foxdale BESS
PRO-004934, RPC ELMYA CARNATION FOXDALE LIMITED
Trent Valley South Connection Node C 400kV Substation
Energy Storage System
Absent from the file dated 11 Sep 2026 (archived copy); printed again with 800 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026
Removed from the register 7
Immingham
PRO-000053, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Printed with 1,318 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Hinkley Point B
PRO-000141, EDF Energy Nuclear Generation Limited
Hinkley Point 400kV Substation
Nuclear
Printed with 0 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Strathy Wood Wind Farm
PRO-000154-1, RWE Renewables UK Onshore Wind Limited
Strathy Wood 132/33kV Substation
Wind Onshore
Printed with 54.4 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Strathy Wood Wind Farm
PRO-000154-2, RWE Renewables UK Onshore Wind Limited
Strathy Wood 132/33kV Substation
Wind Onshore
Printed with 63.5 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Vanguard
PRO-000459, NORFOLK VANGUARD WEST LIMITED
Necton 400kV Substation
Wind Offshore
Printed with 1,320 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Willington Green Energy Centre
PRO-001797-3, WILLINGTON NG LIMITED
Willington 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 0 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Melksham Grid Park ESS & PV
PRO-004164, JEPIPHANY LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 90 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026
Connection date later 74
NatPower Llanteg Green Energy Park
PRO-004806, NP SPV 30 LIMITED
South Wales West Connection Node C 400kV
Energy Storage System
MW Effective From moved from 31 Oct 2028 to 31 Dec 2037 (+3,348 days)
Ninfield
PRO-003408, Ninfield 10 Renewables Limited
Sussex and Romney Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2030 to 31 Oct 2037 (+2,557 days)
Beinn Dearg
PRO-005936, GALILEO 19 LIMITED
NEW TAYNUILT 132 KV SUBSTATION
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From moved from 31 Oct 2031 to 31 Oct 2037 (+2,192 days)
Ewerby
PRO-002017, Leoda Solar Farm Limited
Navenby 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2029 to 30 Oct 2035 (+2,191 days)
Botley West - Cote Solar Power Station
PRO-001587, SOLARFIVE LTD
Farmoor 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2026 to 31 Oct 2031 (+1,827 days)
L48 BESS Glen App
PRO-003058, S4 UK DEV LTD
L48 BESS GLEN APP 275/132KV SUBSTATION
Energy Storage System
MW Effective From moved from 31 Oct 2028 to 31 Oct 2033 (+1,826 days)
Aitkenhead Farm BESS
PRO-002585, Aitkenhead Storage Facility Limited
Clydesmill 275/33kV
Demand;Energy Storage System
MW Effective From moved from 31 Oct 2028 to 30 Apr 2033 (+1,642 days)
Chalmerston Windfarm
PRO-004057, BROCKWELL ENERGY LIMITED
CHALMERSTON WINDFARM 132kV SUBSTATION
Wind Onshore
MW Effective From moved from 31 Oct 2033 to 31 Oct 2037 (+1,461 days)
Bradford Solar Farm
PRO-003511, SolarFour Ltd
Staffordshire Connection Node A 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days)
Daventry High Impact Green Energy Hub (HIGEH) 1
PRO-003686, TELIS ENERGY UK LIMITED
Derbyshire Connection Node A 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days)
Feckenham PV & BESS Station
PRO-003233, IB VOGT UK LTD
Feckenham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days)
Noventum -Long Stratton
PRO-004405, Noventum Power Solar 8 Limited
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 30 Oct 2038 (+1,460 days)
Willington BESS Station
PRO-003727, IBV WILLINGTON ENERGY PARK LIMITED
Derbyshire Connection Node D 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days)
SAGE
PRO-002119, SAGE NORTH SEA LIMITED
St Fergus Mobil 132/11kV Substation
Demand;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Jun 2025 to 30 Apr 2029 (+1,400 days)
Ashbrook Lane BESS
PRO-003534, Downing Renewable Developments LLP
WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION
Energy Storage System
MW Effective From moved from 31 Oct 2031 to 31 Oct 2034 (+1,096 days)
Astwood Solar Farm GEC
PRO-004799, ASTWOOD GREEN ENERGY LTD
West Anglia Connection Node G 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 31 Oct 2037 (+1,096 days)
Ratcliffe on Soar
PRO-003224, Starlight Energy SPV 4 Limited
Derbyshire Connection Node F 132KV
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 31 Oct 2037 (+1,096 days)
Solomons Farm BESS
PRO-003181, Solomons BESS Ltd
North Kent Connection Node B 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2030 to 31 Oct 2033 (+1,096 days)
Merlin Offshore Wind Farm
PRO-001728, OFFSHORE WIND LIMITED
Alverdiscott 400kV Substation
Wind Offshore
MW Effective From moved from 1 Nov 2028 to 30 Oct 2031 (+1,093 days)
Upper Beoch Windfarm
PRO-004068, BROCKWELL ENERGY LIMITED
New Cumnock North 132kV Substation
Wind Onshore
MW Effective From moved from 31 Oct 2033 to 31 Jul 2036 (+1,004 days)
Fleet (Tertiary)
PRO-001087, CSE23 LIMITED
Fleet 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2026 to 30 Jul 2029 (+1,003 days)
Braintree
PRO-001042-1, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2024 to 30 May 2027 (+942 days)
Middleton BESS
PRO-002305, Middleton Energy Storage Limited
Middleton 400KV Substation
Energy Storage System
MW Effective From moved from 30 Nov 2026 to 31 May 2029 (+913 days)
EcoKincardine
PRO-003557, Econergy International Limited
Kincardine North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Jul 2028 to 31 Oct 2030 (+822 days)
Whitehouse BESS station
PRO-002237, IGP INTERNATIONAL PROSPECTING LIMITED
Whitehouse 275kV Substation
Demand;Energy Storage System
MW Effective From moved from 31 Jul 2032 to 31 Oct 2034 (+822 days)
East Claydon High Impact Green Energy Hub (HIGEH) 1
PRO-002652, EAST CLAYDON STORAGE LIMITED
East Claydon 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
MW Effective From moved from 31 Oct 2034 to 6 Dec 2036 (+767 days)
Frome Valley Energy Park
PRO-006617, BIOSOUTH ENERGY LIMITED
Chickerell-Mannington 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 31 Oct 2039 (+730 days)
Orchard BESS
PRO-003762, RE Projects Development Limited
Staffordshire Connection Node B 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2035 to 30 Oct 2037 (+730 days)
Stoke Bardolph 400
PRO-002191-3, ENSO GREEN HOLDINGS LIMITED
Stoke Bardolph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2032 to 31 Oct 2034 (+730 days)
GF Thornton Energy BESS
PRO-003449, THORNTON ENERGY LTD
North Humber Connection Node A 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
Hawthorn BESS
PRO-003492, REWE 8 LIMITED
Wearside Connection Node B 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
West Melton PV & BESS Station
PRO-004061, IBV WEST MELTON SOLAR PARK LIMITED
Leeds North Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
Alverdiscott
PRO-001136-1, PIVOTED POWER LLP
Alverdiscott 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2029 to 31 Aug 2031 (+669 days)
Sundon
PRO-001132, SUNDON BATTERY STORAGE LIMITED
Sundon 400kV Substation
Energy Storage System
MW Effective From moved from 5 Sep 2025 to 30 Apr 2027 (+602 days)
Rowancraig Wind Farm
PRO-002455, Koehler Renewable Energy UK Limited
ROWANCRAIG WIND FARM 33KV SUBSTATION
Wind Onshore
MW Effective From moved from 30 Oct 2028 to 31 May 2030 (+578 days)
Wymondley
PRO-001245, Priory Generation Limited
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2025 to 30 May 2027 (+576 days)
Wymondley Solar Farm
PRO-001105, AGR SOLAR 4 LIMITED
Wymondley 400/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2025 to 30 May 2027 (+576 days)
Alcemi Score 2 Battery Energy Storage Facility
PRO-001790, ALCEMI STORAGE DEVELOPMENTS 5 LIMITED
Alcemi Score Battery 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2029 to 31 Mar 2031 (+516 days)
Alcemi Score Battery Energy Storage Facility
PRO-001575, ALCEMI STORAGE DEVELOPMENTS 5 LIMITED
ALCEMI SCORE BATTERY ENERGY STORAGE FACILITY 400KV SUBSTATION
Energy Storage System
MW Effective From moved from 31 Oct 2029 to 31 Mar 2031 (+516 days)
Medway 3 Power Station
PRO-002578, MEDWAY POWER LIMITED
Kingsnorth 400kV Substation
Demand;LAES (Liquid Air Energy Storage)
MW Effective From moved from 31 Dec 2030 to 30 Apr 2032 (+486 days)
New Deer BESS Station
PRO-001856, ABBOTSHAUGH ENERGY STORAGE LIMITED
New Deer 2 400kV Substation
Energy Storage System
MW Effective From moved from 30 Jul 2032 to 31 Oct 2033 (+458 days)
Stella Battery Energy Storage
PRO-005112, CAPELLA BESS LTD
Stella South GSP
Energy Storage System
MW Effective From moved from 27 Sep 2025 to 30 Nov 2026 (+429 days)
Warley
PRO-001113, WARLEY BATTERY STORAGE LIMITED
Warley 275kV Substation
Energy Storage System
MW Effective From moved from 31 Aug 2027 to 30 Oct 2028 (+426 days)
Cellarhead 400kV Energy Storage
PRO-001685, C & S ENERGY LIMITED
Cellarhead 400kV Substation
Energy Storage System
MW Effective From moved from 16 Jul 2027 to 13 Sep 2028 (+425 days)
Bicker Fen 1 Solar
PRO-001034-1, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 26 Sep 2025 to 31 Oct 2026 (+400 days)
Enderby Tertiary
PRO-000430, CLUMP FARM SOLAR LIMITED
Enderby 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From moved from 1 Aug 2027 to 31 Aug 2028 (+396 days)
Lightsource Ferryside PV
PRO-003761, Lightsource Renewable UK Development Limited
South Wales West Connection Node C 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2037 to 31 Oct 2038 (+366 days)
Tealing Solar & Storage
PRO-001501, SIRIUS ECODEV (TEALING) LTD
Tealing IDNO 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2027 to 31 Oct 2028 (+366 days)
Cilfynydd Green Energy Centre
PRO-001663-1, CILFYNYDD NG LIMITED
Cilfynydd 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From moved from 30 Oct 2028 to 30 Oct 2029 (+365 days)
Denton Estate Solar PV and BESS
PRO-004417, ELGIN ENERGY ES CO LIMITED
Navenby 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2033 to 30 Oct 2034 (+365 days)
Intwood Farm BESS
PRO-003180, Intwood BESS Ltd
North Anglia Connection Node A 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days)
Stoke Bardolph 400
PRO-002191-1, ENSO GREEN HOLDINGS LIMITED
Stoke Bardolph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2030 to 31 Oct 2031 (+365 days)
Zenobe Spennymoor BESS
PRO-003692, ZENOBE ENERGY LIMITED
Wearside Connection Node D 400kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2034 to 30 Oct 2035 (+365 days)
Kirkton Wind Farm
PRO-001811, Kirkton Wind Farm Limited
Connagill 275kV Substation
Wind Onshore
MW Effective From moved from 31 Oct 2028 to 29 Oct 2029 (+363 days)
West Weybridge
PRO-004324, EL (WEST WEYBRIDGE) LIMITED
West Weybridge 275kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2027 to 30 Sep 2028 (+335 days)
Smeaton BESS
PRO-002635, KONA ASSET 3 LIMITED
Smeaton 400kV
Energy Storage System
MW Effective From moved from 30 Sep 2027 to 31 Jul 2028 (+305 days)
Elstree Energy Storage
PRO-003205, ELSTREE BATTERY STORAGE LIMITED
Letchmore Heath 132kV Substation
Energy Storage System
MW Effective From moved from 1 Oct 2029 to 31 Jul 2030 (+303 days)
Willington Energy Park
PRO-001964, BROCKWELL STORAGE & SOLAR LIMITED
Willington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Mar 2028 to 31 Oct 2028 (+215 days)
Mosedale Energy
PRO-002319, MOSEDALE ENERGY LIMITED
High Marnham 400kV Substation
Energy Storage System
MW Effective From moved from 31 Mar 2033 to 31 Oct 2033 (+214 days)
Braintree
PRO-001042-2, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2026 to 30 May 2027 (+212 days)
Red Moss Farm
PRO-002613, QAIR RENEWABLES UK LIMITED
Red Moss Farm 132kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2030 to 30 May 2031 (+212 days)
Keithick 16 Solar & BESS
PRO-001890, SIRIUS ECODEV (KEITHICK) LTD
Coupar Angus 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Jun 2026 to 31 Dec 2026 (+184 days)
Pentland Floating Offshore Wind Farm
PRO-001472, HIGHLAND WIND LIMITED
Pentland Floating Offshore Wind Farm 132/66kV substation
Wind Offshore
MW Effective From moved from 31 Oct 2027 to 3 Apr 2028 (+155 days)
Aberthaw PV & BESS Generation
PRO-001815, REWE 12 Limited
Aberthaw 275kV Substation
Energy Storage System
MW Effective From moved from 30 Jun 2029 to 31 Oct 2029 (+123 days)
Scottish Water Bonnybridge STW 60MW BESS
PRO-002410, Bluestone Energy Ltd
Bonnybridge 132/33kV
Energy Storage System
MW Effective From moved from 31 Jul 2030 to 31 Oct 2030 (+92 days)
Caegarw Farm
PRO-002605, Downing Renewable Developments LLP
Margam B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 10 Mar 2037 to 10 May 2037 (+61 days)
Glen Lednock
PRO-004520, Glen Lednock Wind Farm Limited
Glen Lednock 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From moved from 31 Oct 2031 to 30 Nov 2031 (+30 days)
Windburn Wind Farm
PRO-006075, WINDBURN WIND FARM LIMITED
Devonside 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From moved from 1 Oct 2034 to 31 Oct 2034 (+30 days)
Weaver BESS
PRO-002571, Frodsham Devco Limited
Frodsham 400kV Substation
Energy Storage System
MW Effective From moved from 1 Nov 2037 to 11 Nov 2037 (+10 days)
Didcot Battery
PRO-001468, DIDCOT BATTERY LIMITED
DIDCOT 400/132KV SUBSTATION
Demand;Energy Storage System
MW Effective From moved from 30 Mar 2027 to 31 Mar 2027 (+1 days)
EcoWymondley
PRO-002529, Econergy International Limited
Wymondley 2 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2033 to 31 Oct 2033 (+1 days)
Rat Hall Mod App
PRO-003824-1, Kingsway Solar Farm Limited
South Anglia Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2032 to 31 Oct 2032 (+1 days)
Thainstone Energy Park
PRO-001493, AGILE ENERGY RECOVERY (INVERURIE) LIMITED
Kintore GSP
Waste
MW Effective From moved from 30 Oct 2029 to 31 Oct 2029 (+1 days)
Worksop BESS
PRO-003657, ARM Cedar Limited
Trent Valley South Connection Node B 400kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2034 to 31 Oct 2034 (+1 days)
Connection date earlier 58
Milligansbush Battery Storage
PRO-003430, Milligansbush Battery Storage Ltd
Milligansbush Battery Storage 132kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2036 to 25 Mar 2031 (−2,046 days)
Walham 700MW BESS
PRO-002551, GPC 1154 Ltd
Walham 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2038 to 17 Nov 2033 (−1,809 days)
Rothienorman Battery
PRO-001971, BLACKFORD RENEWABLES LTD
Rothienorman 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 30 Jul 2029 (−1,554 days)
Moelfre Energy Park
PRO-001500, MOELFRE ENERGY PARK LIMITED
Bodelwyddan 400kV Substation
Energy Storage System
MW Effective From moved from 1 Oct 2033 to 31 Oct 2029 (−1,431 days)
Morton Manor PV & BESS Station
PRO-003827, IB VOGT UK LTD
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2034 (−1,097 days)
Petroc Offshore Wind Farm
PRO-001661, BLUEFLOAT ENERGY UK HOLDINGS LIMITED
Alverdiscott 400kV Substation
Wind Offshore
MW Effective From moved from 31 Mar 2029 to 31 Mar 2026 (−1,096 days)
Waltham Cross PV & BESS Sub
PRO-005801, EPPING ENERGY PARK LIMITED
Waltham Cross B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2032 to 31 Oct 2029 (−1,096 days)
Zenobe Butler's Wood BESS
PRO-004085, ZENOBE ENERGY LIMITED
Butlers Wood 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 31 Oct 2034 (−1,096 days)
Montreathmont Moor Forest
PRO-001849, Montreathmont Energy Centre Limited
Lunanhead GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 8 Oct 2029 to 31 Oct 2026 (−1,073 days)
Devol Moor Battery & Solar Project
PRO-004084, Sunshine Project 03 Limited
Devol Moor 400/132kV
Energy Storage System
MW Effective From moved from 17 Oct 2029 to 27 Sep 2027 (−751 days)
Epworth PV & BESS Station
PRO-003644, IBV KELFIELD SOLAR LTD
Trent Valley North Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days)
Hill Farm
PRO-003983, QAIR RENEWABLES UK LIMITED
Capenhurst GSP
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days)
Zenobe Hawthorn Pit BESS
PRO-004086, ZENOBE ENERGY LIMITED
Wearside Connection Node B 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days)
Drum Farm Energy Storage Facility
PRO-001726, Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
Energy Storage System
MW Effective From moved from 31 Oct 2028 to 31 Oct 2026 (−731 days)
Great Coates BESS
PRO-003960, BRUTON ONE BESS LIMITED
Grimsby West 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 31 Oct 2031 (−731 days)
Bicker Fen 1 Solar
PRO-001034-2, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 1 Apr 2035 to 1 Apr 2033 (−730 days)
Capenhurst Tertiary
PRO-002162, ENSO GREEN HOLDINGS Q LIMITED
Capenhurst 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2029 to 31 Oct 2027 (−730 days)
Kingsnorth BESS NP
PRO-002665, NORIKER POWER LTD
Kingsnorth 400kV Substation
Energy Storage System
MW Effective From moved from 29 Oct 2032 to 31 Dec 2030 (−668 days)
Bryn Tilti
PRO-001586, RHIWLAS ENERGY PARK LIMITED
Chirk GSP
Wind Onshore
MW Effective From moved from 19 Jul 2028 to 4 Feb 2027 (−531 days)
Bramford GEC (Ethos Green)
PRO-004027, BRAMFORD GREEN ENERGY CENTRE LTD
Bramford B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2033 to 1 Jun 2032 (−516 days)
Knocknagael BESS
PRO-003712, FIELD KNOCKNAGAEL LTD
Knocknagael 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2030 to 30 Jul 2029 (−458 days)
Dunan Hill
PRO-004433, PERIGUS ENERGY UK LIMITED
Dunan Hill 400kV substation
Energy Storage System;Wind Onshore
MW Effective From moved from 11 Nov 2036 to 31 Oct 2035 (−377 days)
Ceislein Wind Farm
PRO-003256, RWE Renewables UK Onshore Wind Limited
Ceislien Wind Farm
Wind Onshore
MW Effective From moved from 31 Oct 2031 to 31 Oct 2030 (−365 days)
Rugby High Impact Green Energy Hub (HIGEH) 1
PRO-003626, TELIS ENERGY UK LIMITED
Enderby 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From moved from 31 Oct 2034 to 31 Oct 2033 (−365 days)
Navenby Farm
PRO-004045, CODDINGTON 10 RENEWABLES LTD
Coddington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2034 to 30 May 2034 (−153 days)
Bilbo Farm
PRO-001301-1, LEL BILBO SOLAR LIMITED
Strichen 132/33kV GSP Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2024 to 30 Jun 2024 (−123 days)
NatPower Kinoulton Green Energy Park
PRO-004333, DALBY ENERGY LIMITED
West Anglia Connection Node C 400kV Substation
Energy Storage System
MW Effective From moved from 31 Dec 2034 to 31 Oct 2034 (−61 days)
Cowley Farm 2
PRO-002738, COWLEY 7 RENEWABLES LTD
Cowley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Nov 2038 to 1 Oct 2038 (−60 days)
Biggleswade BESS
PRO-002165, Central Bedfordshire Council
Biggleswade 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2029 to 28 Sep 2029 (−33 days)
Field Farm
PRO-001924, Net Zero One Ltd
Staythorpe 400kv
Energy Storage System
MW Effective From moved from 31 Oct 2030 to 30 Sep 2030 (−31 days)
Cilfynydd BESS
PRO-002756, Cilfynydd BESS Limited
Cilfynydd 400kV Substation
Energy Storage System
MW Effective From moved from 15 Oct 2037 to 15 Sep 2037 (−30 days)
Isle of Man Offshore Wind Farm
PRO-003698, Mooir Vannin Offshore Wind Farm Limited
IMW01 OFFSHORE 275/66KV OFFSHORE SUBSTATION
Wind Offshore
MW Effective From moved from 30 Oct 2037 to 30 Sep 2037 (−30 days)
Lethen Wind Farm
PRO-002307, FRED OLSEN RENEWABLES LIMITED
Lethen Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From moved from 31 Dec 2033 to 1 Dec 2033 (−30 days)
West Burton Solar Project
PRO-000561, WEST BURTON SOLAR PROJECT LIMITED
West Burton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Nov 2028 to 31 Oct 2028 (−30 days)
Tarenni
PRO-001641, TARENNI ENERGY PARK LIMITED
Rhigos 400kV Substation
Wind Onshore
MW Effective From moved from 31 Dec 2030 to 13 Dec 2030 (−18 days)
Capenhurst
PRO-000540, ENSO GREEN HOLDINGS Q LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Sep 2033 to 14 Sep 2033 (−16 days)
Beddington 1 BESS
PRO-003170, Bluestone Beddington 1 Ltd
London South Connection Node A 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Bicker Fen
PRO-004295, IB VOGT UK LTD
Trent Valley South Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days)
Bute Hydrogen Project 1
PRO-004124, HALDANE ENERGY PROJECT 1 LIMITED
Trent Valley South Connection Node D 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days)
Bute Hydrogen Project 2
PRO-004125, HALDANE ENERGY PROJECT 2 LIMITED
Creyke Beck 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days)
Bute Hydrogen Project 3
PRO-004126, HALDANE ENERGY PROJECT 3 LIMITED
Grimsby West 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days)
Bute Hydrogen Project 4
PRO-004127, HALDANE ENERGY PROJECT 4 LIMITED
Teeside Connection Node 2 C 132/400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days)
Bute Hydrogen Project 6
PRO-004129, Haldane Energy Project 6 Limited
Cheshire Connection Node A 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
CODDINGTON BESS
PRO-003666, SHAW-ENERGI LTD
Trent Valley South Connection Node A 400kV
Energy Storage System
MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days)
Cottam-Ryhall Solar & BESS
PRO-004100, CRH RENEWABLES LIMITED
Trent Valley South Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days)
Daines NP BESS
PRO-003194, Daines Flexpower Limited
Manchester South connection node A 400kv
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Havbredey
PRO-001628, HAVBREDEY LIMITED
New Dounreay 400kV substation
Wind Offshore
MW Effective From moved from 31 Oct 2033 to 30 Oct 2033 (−1 days)
Kenwick Solar
PRO-005989, ANESCO LIMITED
Shrewsbury 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Leadenham High Impact Green Energy Hub
PRO-003815, TELIS ENERGY UK LIMITED
Trent Valley South Connection Node A 400kV
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days)
Lightsource Enderby PV+BESS
PRO-003854, Lightsource Renewable UK Development Limited
Derbyshire Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Nant Helen
PRO-002766, SOLAR SECURITIES LIMITED
South Wales West Connection Node A 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
NatPower Penrith Green Energy Park
PRO-004278, LEITH ENERGY LIMITED
Lancashire Connection Node B 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
New Marton Solar Farm - PVDP
PRO-004139, SolarFour Ltd
Cheshire Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Pentir Green Energy Centre
PRO-002345, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Persley Croft BESS
PRO-002546, Persley Croft BESS Ltd
Persley 132/33kV GSP Substation
Energy Storage System
MW Effective From moved from 31 Jul 2026 to 30 Jul 2026 (−1 days)
Siddington BESS Station
PRO-003942, IBV BIRTLES HILL ENERGY PARK LTD
Manchester South connection node A 400kv
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Wacton Road Farm
PRO-004440, QAIR RENEWABLES UK LIMITED
North Anglia Connection Node A 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days)
Whitson BESS NP
PRO-003102, EQUINOR NEW ENERGY LIMITED
South Wales East Node A 275kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Connection date removed 2
Whitegate Tertiary Connection
PRO-000512, HD144WHI LTD
Whitegate 275kV Substation
Energy Storage System
MW Effective From was 30 Jun 2024; blank in the file dated 20 Oct 2026
Almondell Lodge BESS & Solar Development
PRO-001667, BROXBURN ENERGY STORAGE LIMITED
Broxburn 132/33kV
Energy Storage System
MW Effective From was 30 Apr 2024; blank in the file dated 20 Oct 2026
Capacity down 3
Willington Green Energy Centre
PRO-001797-1, WILLINGTON NG LIMITED
Willington 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 1,025 MW to 400 MW (−625 MW)
Dersalloch Wind Farm Extension
PRO-000412, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dersalloch 132/33kV
Energy Storage System
Cumulative Total Capacity changed from 85 MW to 11 MW (−74 MW)
Lyndhurst Camperdown BESS
PRO-002658, Geocore Ltd
Charleston GSP 132/33kV
Energy Storage System
Cumulative Total Capacity changed from 49.9 MW to 49.5 MW (−0.4 MW)
Project status changed 139
Clashindarroch 2
PRO-000041, VATTENFALL WIND POWER LTD
Cairnford GSP
Wind Onshore
Project Status changed from Scoping to Under Construction/Commissioning
Cruachan U3&4 Replacement
PRO-000113-2, DRAX PUMPED STORAGE LIMITED
Cruachan 275kV Substation
Pump Storage
Project Status changed from Scoping to Consents Approved
Stranoch Wind Farm
PRO-000127, STRANOCH WINDFARM LIMITED
Stranoch Wind 132/33kV Substation
Wind Onshore
Project Status changed from Consents Approved to Under Construction/Commissioning
Lorg Wind Farm
PRO-000153, RWE Renewables UK Onshore Wind Limited
Lorg Wind Farm 132/32kV
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Strathy South Wind
PRO-000183, SSE GENERATION LIMITED
Strathy South 132/33kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Glenmuckloch Wind Farm
PRO-000300, GLENMUCKLOCH RENEWABLE ENERGY LIMITED
Glenmuckloch 132/33kV
Wind Onshore
Project Status changed from Awaiting Consents to Consents Approved
Loganhead Windfarm
PRO-000306, LOGANHEAD WF LIMITED
Hopsrig Collector Substation
Wind Onshore
Project Status changed from Awaiting Consents to Consents Approved
Pencloe Windfarm
PRO-000323-2, PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
Energy Storage System;Wind Onshore
Project Status changed from Awaiting Consents to Scoping
Scoop Hill Wind Farm
PRO-000327, Community Windpower Limited
Scoop Hill Wind Farm 132kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Pembroke BESS
PRO-000337-1, RWE Generation UK Plc
Pembroke 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Pembroke BESS
PRO-000337-2, RWE Generation UK Plc
Pembroke 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Whitelaw Brae Windfarm
PRO-000341, WHITELAW BRAE WINDFARM LIMITED
Whitelaw Brae 'A' and 'B' 33kV Substations
Wind Onshore
Project Status changed from Scoping to Under Construction/Commissioning
Inch Cape Offshore Wind Farm Platform 1
PRO-000348, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
Project Status changed from Consents Approved to Under Construction/Commissioning
Inch Cape Offshore Wind Farm Platform 2
PRO-000349, INCH CAPE OFFSHORE LIMITED
Cockenzie 275kV substation
Wind Offshore
Project Status changed from Consents Approved to Under Construction/Commissioning
Windy Standard III Wind Farm
PRO-000359-1, Windy Standard III Limited
Dun Hill 132/33kV
Wind Onshore
Project Status changed from Awaiting Consents to Consents Approved
Windy Standard III Wind Farm
PRO-000359-2, Windy Standard III Limited
Dun Hill 132/33kV
Wind Onshore
Project Status changed from Awaiting Consents to Consents Approved
Bramley (tertiary)
PRO-000396, BRAMLEY SOLAR LIMITED
Bramley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Under Construction/Commissioning
Dersalloch Wind Farm Extension
PRO-000412, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dersalloch 132/33kV
Energy Storage System
Project Status changed from Consents Approved to Scoping
High Constellation Windfarm
PRO-000416, HIGH CONSTELLATION WINDFARM LIMITED
High Constellation 132/33kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Enderby Tertiary
PRO-000430, CLUMP FARM SOLAR LIMITED
Enderby 400kV Substation
PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Iron Acton
PRO-000491-2, IRON ACTON GREEN LIMITED
132kV bay at Iron Acton Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Under Construction/Commissioning to Consents Approved
Thurrock Power Station
PRO-000494-2, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
Project Status changed from Under Construction/Commissioning to Built
Whitegate Tertiary Connection
PRO-000512, HD144WHI LTD
Whitegate 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Limekiln
PRO-000515-2, Limekiln Extension Limited
Limekilns 132/33kV substation
Energy Storage System;Wind Onshore
Project Status changed from Consents Approved to Scoping
High Marnham (Tertiary)
PRO-000531, ENSO GREEN HOLDINGS K LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
West Burton Solar Project
PRO-000561, WEST BURTON SOLAR PROJECT LIMITED
West Burton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Daer Wind Farm
PRO-000565, RWE Renewables UK Onshore Wind Limited
Daer Wind Farm 132/33kV
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Kincardine Battery Storage Facility
PRO-000856, KINCARDINE GRID 1 LTD
Fife Grid Services Facility 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Cogle Moss Wind Farm
PRO-000973, COGLE MOSS RENEWABLES LLP
Mybster 2 132/33kV Substation
Wind Onshore
Project Status changed from Consents Approved to Scoping
Oaklands Farm Solar PV
PRO-001004, OAKLANDS FARM SOLAR LIMITED.
Drakelow 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Greenburn Mixed Technology
PRO-001006, REG GREENBURN LIMITED
Greenburn Mixed Technology 132kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Euchanhead Wind Farm
PRO-001011, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Euchanhead 132kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Carrick Wind Farm
PRO-001026, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Carrick Wind Farm Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Canterbury Tertiary
PRO-001029, ENSO GREEN HOLDINGS L LIMITED
Canterbury North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Bicker Fen 1 Solar
PRO-001034-1, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Braintree
PRO-001042-1, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Braintree
PRO-001042-2, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Worset PV & BESS Park
PRO-001055, Worcestershire Solar 1 Limited
Hartmoor 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Consents Approved to Under Construction/Commissioning
Deeside Power Station
PRO-001062, DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Consents Approved to Built
Pivot Power Harker Hybrid
PRO-001065, PIVOTED POWER LLP
Harker 400/132KV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Consents Approved to Scoping
Kirkby
PRO-001084-2, KIRKBY BATTERY STORAGE LTD
Kirkby 275/33kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Lister Battery (formerly Lister Drive)
PRO-001088, LISTER BATTERY LTD
Lister Drive 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Bramley BESS
PRO-001104-1, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
Project Status changed from Consents Approved to Under Construction/Commissioning
Bramley BESS
PRO-001104-2, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
Project Status changed from Consents Approved to Under Construction/Commissioning
Keith 132 Greener Grid Park
PRO-001129-2, KEITH STORAGE SOLUTIONS LIMITED
Keith 132kV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Consents Approved to Under Construction/Commissioning
Sundon
PRO-001132, SUNDON BATTERY STORAGE LIMITED
Sundon 400kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Hunterston Battery Storage Facility
PRO-001155, HUNTERSTON GRID 1 LTD
Hunterston East 400kV substation
Energy Storage System;Reactive Compensation
Project Status changed from Scoping to Consents Approved
Wymondley
PRO-001245, Priory Generation Limited
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Bilbo Farm
PRO-001301-1, LEL BILBO SOLAR LIMITED
Strichen 132/33kV GSP Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Under Construction/Commissioning
West Burton
PRO-001323, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Under Construction/Commissioning
Glen Ullinish Extension
PRO-001346, GLEN ULLINISH WF 2 LTD
Glen Ullinish Extension 132/33kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Drax
PRO-001355, ENSO GREEN HOLDINGS D LIMITED
Drax 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Uskmouth - New Connection
PRO-001357, AW1 ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Neilston 400kV Greener Grid Park
PRO-001419, Statkraft UK Ltd
Neilston 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Alcemi Devilla Battery Energy Storage Facility
PRO-001453, ALCEMI STORAGE DEVELOPMENTS 3 LIMITED
Devilla Battery Storage 275kV substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Eccles BESS
PRO-001470, Eccles Energy Centre Limited
Eccles 400kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Pentland Floating Offshore Wind Farm
PRO-001472, HIGHLAND WIND LIMITED
Pentland Floating Offshore Wind Farm 132/66kV substation
Wind Offshore
Project Status changed from Scoping to Consents Approved
Rawhills Battery Energy Storage Facility(Coalburn 2)
PRO-001503, ALCEMI STORAGE DEVELOPMENTS 6 LIMITED
Coalburn 400kV GIS Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
BOOM Power Llanbabo Generation
PRO-001540, Carrog Storage Facility Limited
Wylfa 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Achany Extension Wind Farm
PRO-001555, SSE GENERATION LIMITED
ACHANY EXTENSION WIND FARM 132/33KV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Botley West - Cote Solar Power Station
PRO-001587, SOLARFIVE LTD
Farmoor 400kV Substation
PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
One Earth Solar Farm
PRO-001599, ONE EARTH SOLAR FARM LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Melksham
PRO-001605, LIME DOWN SOLAR PARK LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Chleansaid Wind Farm
PRO-001608, ESB ASSET DEVELOPMENT UK LIMITED
Chleansaid Wind Farm 132kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Staythorpe (BESS and PV)
PRO-001615, SSE STAYTHORPE POWER LIMITED
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Thorpe Marsh Energy Park
PRO-001620, THORPE MARSH GREEN ENERGY HUB LIMITED
Thorpe Marsh 400kV Substation
Energy Storage System
Project Status changed from Consents Approved to Under Construction/Commissioning
Hunterston Energy Storage Facility
PRO-001644, HUNTERSTON GRID 1 LTD
Ayrshire Grid 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Kincardine Energy Storage Facility
PRO-001653, KINCARDINE GRID 1 LTD
Fife Grid Services Facility 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Dalmarnock Road BESS
PRO-001660, DALMARNOCK BESS LTD
DALMARNOCK 132/33KV SUBSTATION
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Exeter BESS
PRO-001666-1, Exeter Storage Limited
Exeter 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Muir Mhor Offshore Wind Farm
PRO-001698, MUIR MHÒR OFFSHORE WIND FARM LIMITED
Longside 400kV Substation
Wind Offshore
Project Status changed from Scoping to Awaiting Consents
Elvanfoot (9.8 MW) Energy Storage
PRO-001721, ELVANFOOT ENERGY STORAGE LIMITED
Elvanfoot 400/275/33kV
Energy Storage System
Project Status changed from Scoping to Consents Approved
Drum Farm Energy Storage Facility
PRO-001726, Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Keithick Estate
PRO-001732, SIRIUS ECODEV (STIRLING) LTD
Coupar Angus 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Consents Approved to Under Construction/Commissioning
Keith Battery Storage
PRO-001742, Field Keith Ltd
Keith 1 132/33kV GSP Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Cairn Duhie Wind Farm
PRO-001743, Cairn Duhie Energy Limited
Berryburn 275/33kV GSP Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762, LITTLETON PASTURES SOLAR LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Zenobe Eccles Battery Storage
PRO-001779, ZENOBE ECCLES LIMITED
Eccles 400kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Zenobe Coalburn Battery Storage
PRO-001780, Zenobe Coalburn Limited
Coalburn North 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Berkswell Energy Storage
PRO-001788, BERKSWELL BATTERY STORAGE LIMITED
Berkswell 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Under Construction/Commissioning
Greta III
PRO-001803, TAGENERGY DEVELOPMENT UK LIMITED
Drakelow 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Penwortham BESS
PRO-001804, PENWORTHAM (BES) LTD
Penwortham 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Rochdale BESS
PRO-001805, Rochdale (BES) Ltd
Rochdale 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Kilmarnock South Battery Storage
PRO-001809, Kilmarnock Energy Centre Limited
Kilmarnock South 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Kirkton Wind Farm
PRO-001811, Kirkton Wind Farm Limited
Connagill 275kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Teindland Wind Farm
PRO-001821, TEINDLAND WIND FARM LIMITED
Blackhillock substation
Demand;Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Kilmarnock BESS
PRO-001836, Kilmarnock Flexpower Ltd
Boydston 400kV substation
Energy Storage System
Project Status changed from Consents Approved to Under Construction/Commissioning
Montreathmont Moor Forest
PRO-001849, Montreathmont Energy Centre Limited
Lunanhead GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Benthead Solar
PRO-001881, BENTHEAD SOLAR LIMITED
Kilwinning 132/33kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Perwinnes
PRO-001934, PERWINNES SOLAR AND BATTERY STORAGE LIMITED
Dyce 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Culham Storage
PRO-001946, CULHAM STORAGE LIMITED
Culham Jet 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Balvedavist 162 Battery Storage
PRO-002024, S4N SPITTAL LTD
Spittal 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Bowdun (ex Cluaran Deas Ear) Offshore Wind Farm
PRO-002091, BOWDUN OFFSHORE WIND FARM LIMITED
Hurlie 400kV substation
Wind Offshore
Project Status changed from Scoping to Awaiting Consents
Whitehill Battery Storage
PRO-002093, Whitehill Battery Storage Ltd
Easterhouse 275kV
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Ayre (ex Cluaran Ear - Thuath) Offshore Wind Farm
PRO-002100, AYRE OFFSHORE WIND FARM LIMITED
Banniskirk 400kV Substation
Wind Offshore
Project Status changed from Scoping to Awaiting Consents
Bankside BESS
PRO-002151, FALKIRK POWER LTD
Bainsford 132/33kV
Energy Storage System
Project Status changed from Consents Approved to Under Construction/Commissioning
Lanarkshire BESS
PRO-002183, CARLTON POWER LIMITED
Strathaven 400/275kV
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Gresham House Cockenzie BESS
PRO-002209, COCKENZIE STORAGE LIMITED
Meadowmill 400/132kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Well Street Paisley
PRO-002265, Gas Generation Property Limited
Elderslie 132/33kV
Energy Storage System
Project Status changed from Scoping to Consents Approved
Rothienorman 50MW BESS
PRO-002300, ROTHIENORMAN FLEXPOWER LTD
Rothienorman 400/33kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Middleton BESS
PRO-002305, Middleton Energy Storage Limited
Middleton 400KV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Corshellach Battery Energy Storage System
PRO-002328, Corshellach Energy Storage Limited
Berryburn 275/33kV GSP Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Holdsworth Road
PRO-002338, MAS 002 LIMITED
Bradford West 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Holmston Farm Battery Energy Storage System
PRO-002359, Field Holmston Ltd
Ayr 275/33kV
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Flemyland Battery Storage
PRO-002360, Flemyland Battery Storage Limited
Kilwinning 132/33kV
Energy Storage System
Project Status changed from Scoping to Consents Approved
Drumfad Battery Storage System
PRO-002419, EKU ENERGY FAUNE PROJECTS (UK) LIMITED
Helensburgh 132/33kV
Energy Storage System
Project Status changed from Scoping to Consents Approved
Dolphingstone Farm
PRO-002451, BSSL EAST LOTHIAN 1 LTD
Cockenzie 275/33kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Inchbean Energy Park
PRO-002453, BROCKWELL STORAGE & SOLAR LIMITED
Kilmarnock Town 275/33kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Newarthill Energy Park
PRO-002532, Dalzell (Newarthill) Ltd
Newarthill Energy Park 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Scoping
Persley Croft BESS
PRO-002546, Persley Croft BESS Ltd
Persley 132/33kV GSP Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Newlands Hill Wind Energy Hub
PRO-002549, NEWLANDS HILL WIND ENERGY HUB LIMITED
Newlands Hill 132/33kV
Energy Storage System;Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Loch Fearna Pumped Storage
PRO-002569, FEARNA PSH LIMITED
Loch Fearna Pumped Storage 400/18kV Substation
Pump Storage
Project Status changed from Scoping to Awaiting Consents
Smeaton BESS
PRO-002635, KONA ASSET 3 LIMITED
Smeaton 400kV
Energy Storage System
Project Status changed from Scoping to Consents Approved
Bowsheil Solar and Battery
PRO-002662, VOLTALIA UK LTD
Bowsheils 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
St Marys Isle Solar Farm
PRO-002789, GRUPOTEC SOLAR UK 5 LIMITED
Tongland 132/11kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Saltcoats NEP BESS Facility
PRO-002813, Rashley New Energy Limited
Saltcoats 132/33kV
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Lovat Estate BESS
PRO-003062, LG-B-50a Limited
Beauly 132/33 kV GSP Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Whitelaw Brae BESS
PRO-003247, BUK23 LIMITED
Whitelaw Brae BESS 33kV substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Market Harborough
PRO-003271, CONNECTID 1 LIMITED
West Anglia Connection Node F 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Project Status changed from Scoping to Awaiting Consents
Yaxley
PRO-003272, CONNECTID 2 LIMITED
North Anglia Connection Node E 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Project Status changed from Scoping to Awaiting Consents
Scarning
PRO-003275, CONNECTID 3 LIMITED
North Anglia Connection Node C 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Project Status changed from Scoping to Awaiting Consents
Lisa's Battery Storage
PRO-003280, POTENCIA ENERGY LIMITED
Mybster 3 132/33kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Kedrum Solar Farm
PRO-003444, Rosside Energy Limited
Blackhillock 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Wymondley BESS Limited
PRO-003496, AGR RENEWABLES LIMITED
Wymondley 400kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Lethans Wind Farm Extension
PRO-003553, LETHANS EAST WIND FARM LIMITED
Lethans Collector 132kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Glennifer Road BESS
PRO-003600, Drax BESS Neilston Limited
Glennifer Road BESS 132kV substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Lairdmannoch Energy Park
PRO-003781, LAIRDMANNOCH ENERGY PARK LIMITED
Lairdmannoch Energy Park 132kV substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Don Cossack
PRO-003875, Don Cossack Ltd
Tynemouth 275kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Fiddlers Ferry BESS
PRO-003897-1, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Fiddlers Ferry BESS
PRO-003897-2, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Demand;Energy Storage System
Project Status changed from Scoping to Consents Approved
Fiddlers Ferry BESS
PRO-003897-3, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Demand;Energy Storage System
Project Status changed from Scoping to Consents Approved
Salters Battery Storage
PRO-004150, BUCCLEUCH ESTATES, LTD. (THE)
Dalkeith 400kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Cockenzie BESS
PRO-004217, COCKENZIE STORAGE B LTD
Meadowmill 400/132kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Brunt Hill Wind Farm
PRO-004322, Brunt Hill Limited
Westfield 132/33kV
Energy Storage System;Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Fearna PSH 2
PRO-004391, FEARNA PSH LIMITED
Fearna Pump Storage Hydro 2 400/15kV Substation
Pump Storage
Project Status changed from Scoping to Awaiting Consents
Drakelow Power Station 3 BESS
PRO-004713, Bluestone Energy Ltd
ERBYSHIRE CONNECTION NODE E 132kV SUBSTATION
Energy Storage System
Project Status changed from Under Construction/Commissioning to Scoping
Royle Farm BESS
PRO-005050, ALUDRA BESS LTD
Drakelow 132kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Stella Battery Energy Storage
PRO-005112, CAPELLA BESS LTD
Stella South GSP
Energy Storage System
Project Status changed from Scoping to Consents Approved
Ditcher Law
PRO-006102, E Power Limited
Dunlaw Extension 132/33kV
Energy Storage System;Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Gate changed 103
Cruachan U3&4 Replacement
PRO-000113-2, DRAX PUMPED STORAGE LIMITED
Cruachan 275kV Substation
Pump Storage
Gate changed from blank to 2
Edinbane Windfarm
PRO-000135-1, VATTENFALL WIND POWER LTD
Edinbane 132/33kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Edinbane Windfarm
PRO-000135-2, VATTENFALL WIND POWER LTD
Edinbane 132/33kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Carrington
PRO-000276, CARRINGTON STORAGE LIMITED
Carrington 400KV Substation
Energy Storage System
Gate changed from blank to 2
Fleet Tertiary
PRO-000429, FLEET SOLAR LIMITED
Fleet 400kV Substation
Thermal
Gate changed from blank to 1
Enderby Tertiary
PRO-000430, CLUMP FARM SOLAR LIMITED
Enderby 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Loch Luichart Extension II
PRO-000487, BLUEBELL WIND FARM LIMITED
Loch Luichart Extension II Substation
Wind Onshore
Gate changed from blank to 1
Iron Acton
PRO-000491-2, IRON ACTON GREEN LIMITED
132kV bay at Iron Acton Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Thurrock Power Station
PRO-000494-2, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
Gate changed from blank to 2
Limekiln
PRO-000515-2, Limekiln Extension Limited
Limekilns 132/33kV substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
High Marnham (Tertiary)
PRO-000531, ENSO GREEN HOLDINGS K LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
West Burton Solar Project
PRO-000561, WEST BURTON SOLAR PROJECT LIMITED
West Burton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Oaklands Farm Solar PV
PRO-001004, OAKLANDS FARM SOLAR LIMITED.
Drakelow 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Bicker Fen 1 Solar
PRO-001034-1, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Braintree
PRO-001042-1, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Braintree
PRO-001042-2, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Deeside Power Station
PRO-001062, DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
Energy Storage System;Reactive Compensation
Gate changed from blank to 2
Kearsley
PRO-001064, PIVOTED POWER LLP
Kearsley 275kV Substation
Demand;Energy Storage System
Gate changed from blank to 1
Sheirdrim Wind Farm
PRO-001066, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Sheirdrim 132kV Substation
Wind Onshore
Gate changed from blank to 1
Kirkby
PRO-001084-1, KIRKBY BATTERY STORAGE LTD
Kirkby 275/33kV Substation
Energy Storage System
Gate changed from blank to 2
Fleet (Tertiary)
PRO-001087, CSE23 LIMITED
Fleet 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Lister Battery (formerly Lister Drive)
PRO-001088, LISTER BATTERY LTD
Lister Drive 275kV Substation
Energy Storage System
Gate changed from blank to 2
Bramley BESS
PRO-001104-2, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
Gate changed from 2 to blank
Wymondley Solar Farm
PRO-001105, AGR SOLAR 4 LIMITED
Wymondley 400/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Warley
PRO-001113, WARLEY BATTERY STORAGE LIMITED
Warley 275kV Substation
Energy Storage System
Gate changed from blank to 2
Sundon
PRO-001132, SUNDON BATTERY STORAGE LIMITED
Sundon 400kV Substation
Energy Storage System
Gate changed from blank to 2
Iver
PRO-001141, Juniper Energy Limited
Iver 275kV Substation
Energy Storage System
Gate changed from blank to 1
Wymondley
PRO-001245, Priory Generation Limited
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Uskmouth - New Connection
PRO-001357, AW1 ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
Gate changed from blank to 2
Indian Queens Energy Centre
PRO-001371, IQ ENERGY CENTRE LIMITED
Indian Queens 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Cottam Solar PV + BESS
PRO-001401, COTTAM SOLAR PROJECT LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Norton PV and BESS
PRO-001437, Darlington Solar 1 Limited
Norton 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Pentland Floating Offshore Wind Farm
PRO-001472, HIGHLAND WIND LIMITED
Pentland Floating Offshore Wind Farm 132/66kV substation
Wind Offshore
Gate changed from blank to 2
Tealing Solar & Storage
PRO-001501, SIRIUS ECODEV (TEALING) LTD
Tealing IDNO 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Botley West - Cote Solar Power Station
PRO-001587, SOLARFIVE LTD
Farmoor 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Tarenni
PRO-001641, TARENNI ENERGY PARK LIMITED
Rhigos 400kV Substation
Wind Onshore
Gate changed from blank to 1
Legacy Green Energy Centre
PRO-001662-2, LEGACY GREEN ENERGY LIMITED
Legacy 400kV Substation
Energy Storage System
Gate changed from blank to 1
Exeter BESS
PRO-001666-1, Exeter Storage Limited
Exeter 400kV Substation
Energy Storage System
Gate changed from blank to 2
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762, LITTLETON PASTURES SOLAR LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Gate changed from blank to 2
Kirkton Wind Farm
PRO-001811, Kirkton Wind Farm Limited
Connagill 275kV Substation
Wind Onshore
Gate changed from blank to 1
Aberthaw PV & BESS Generation
PRO-001815, REWE 12 Limited
Aberthaw 275kV Substation
Energy Storage System
Gate changed from blank to 1
High Marnham Solar Farm
PRO-001845, ANESCO LIMITED
High Marnham 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Montreathmont Moor Forest
PRO-001849, Montreathmont Energy Centre Limited
Lunanhead GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Benthead Solar
PRO-001881, BENTHEAD SOLAR LIMITED
Kilwinning 132/33kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Keithick 16 Solar & BESS
PRO-001890, SIRIUS ECODEV (KEITHICK) LTD
Coupar Angus 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 2
Maesnant Energy Park
PRO-001919, Maesnant Energy Park Limited
Chirk GSP
Wind Onshore
Gate changed from blank to 1
BlaenCothi Energy Park
PRO-001920, BLAENCOTHI ENERGY PARK LIMITED
Pont Abraham GSP
Wind Onshore
Gate changed from blank to 1
Culham Storage
PRO-001946, CULHAM STORAGE LIMITED
Culham Jet 400kV Substation
Energy Storage System
Gate changed from blank to 2
Callisterhall Wind Farm
PRO-001965, E Power Limited
Callisterhall 132kV
Wind Onshore
Gate changed from blank to 1
Breakish Windfarm
PRO-002170-1, Asuk Holdco 2 Limited
Breakish 132kV Substation
Wind Onshore
Gate changed from blank to 1
Breakish Windfarm
PRO-002170-2, Asuk Holdco 2 Limited
Breakish 132kV Substation
Wind Onshore
Gate changed from blank to 1
Feckenham
PRO-002189, ENSO GREEN HOLDINGS X LIMITED
Feckenham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Whitehouse BESS station
PRO-002237, IGP INTERNATIONAL PROSPECTING LIMITED
Whitehouse 275kV Substation
Demand;Energy Storage System
Gate changed from blank to 1
Halbeath
PRO-002266, HALBEATH SOLAR LTD
Halbeath 132kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Gate changed from blank to 1
Middleton BESS
PRO-002305, Middleton Energy Storage Limited
Middleton 400KV Substation
Energy Storage System
Gate changed from blank to 2
Thurcroft BESS
PRO-002313, HARMONY TC LIMITED
Thurcroft 275kV Substation
Energy Storage System
Gate changed from blank to 1
Llywelyn Extension Offshore Wind Farm
PRO-002406, Renantis UK Limited
LLYWELYN EXTENSION OFFSHORE WIND FARM 66/275KV OFFSHORE SUBSTATION
Wind Offshore
Gate changed from blank to 1
Dougliehill BESS
PRO-002411, Bluestone Energy Ltd
DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION
Energy Storage System
Gate changed from blank to 1
Elmya Melbourne BESS
PRO-002424-1, ELMYA RPC UK MELBOURNE LIMITED
Thornton 400kV Substation
Energy Storage System
Gate changed from blank to 1
Elmya Melbourne BESS
PRO-002424-2, ELMYA RPC UK MELBOURNE LIMITED
Thornton 400kV Substation
Energy Storage System
Gate changed from blank to 1
Grimsby BESS
PRO-002633, Shama BESS Limited
Grimsby West 400kV Substation
Energy Storage System
Gate changed from blank to 1
Smeaton BESS
PRO-002635, KONA ASSET 3 LIMITED
Smeaton 400kV
Energy Storage System
Gate changed from blank to 2
Pelham BESS
PRO-002645, PELHAM ENERGY PARK LIMITED
PELHAM 2 400KV SUBSTATION
Energy Storage System
Gate changed from blank to 1
Lyndhurst Camperdown BESS
PRO-002658, Geocore Ltd
Charleston GSP 132/33kV
Energy Storage System
Gate changed from blank to 1
Penn Battery Storage
PRO-002696, ANGLO ENERGY STORAGE LTD
Penn 275kV Substation
Energy Storage System
Gate changed from blank to 1
AGS Calderside Battery Energy Storage System
PRO-002752-2, Advance Grid Solutions Limited
AGS CALDERSIDE 275KV SUBSTATION
Energy Storage System
Gate changed from blank to 1
Merthyr Solar and Battery
PRO-002757-1, EEW RENEWABLES LTD
Cilfynydd 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Merthyr Solar and Battery
PRO-002757-2, EEW RENEWABLES LTD
Cilfynydd 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Gresham House Dalmarnock BESS
PRO-002809, ENERGYHUBDEVELOPMENTS LIMITED
Gresham House Dalmarnock Bess 132kv Substation
Energy Storage System
Gate changed from blank to 1
Craighead Wind Farm
PRO-002821, GALILEO 02 LIMITED
CRAIGHEAD WIND FARM 132kV SUBSTATION
Wind Onshore
Gate changed from blank to 1
Akku Tealing Battery Storage
PRO-003092, Akku Tealing Limited
Tealing 275/33kV Substation
Energy Storage System
Gate changed from blank to 1
Solomons Farm BESS
PRO-003181, Solomons BESS Ltd
North Kent Connection Node B 132kV Substation
Energy Storage System
Gate changed from blank to 1
Nether Pitforthie BESS
PRO-003226, Opdenergy UK 14 Limited
FIDDES 275/33KV GRID SUPPLY POINT SUBSTATION
Energy Storage System
Gate changed from blank to 1
Amersham Main
PRO-003404, Amersham 10 Renewables Limited
London North West Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Braintree
PRO-003406, Braintree 10 Renewables Limited
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Berwick Solar Wind and Battery Storage
PRO-003490, BERWICK RENEWABLES TX LIMITED
Berwick 132/33kV
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Ashbrook Lane BESS
PRO-003534, Downing Renewable Developments LLP
WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION
Energy Storage System
Gate changed from blank to 1
Gastard BESS
PRO-003552, SIRIUSECODEV (GASTARD) LTD
Melksham B 132KV Substation
Energy Storage System
Gate changed from blank to 1
EcoKincardine
PRO-003557, Econergy International Limited
Kincardine North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Market Harborough Green Energy Hub
PRO-003623, TELIS ENERGY UK LIMITED
West Anglia Connection Node F 400kV Substation
Energy Storage System;Hydro;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Daventry High Impact Green Energy Hub (HIGEH) 1
PRO-003686, TELIS ENERGY UK LIMITED
Derbyshire Connection Node A 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Kellwood Road BESS
PRO-003710, Geocore (Kellwood) Ltd
Dumfries 132/33kV
Energy Storage System
Gate changed from blank to 2
Beauly 02 BESS
PRO-003731, FIELD BEAULY LTD
BEAULY 02 BESS 132kV SUBSTATION
Energy Storage System
Gate changed from blank to 1
Morton Manor PV & BESS Station
PRO-003827, IB VOGT UK LTD
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lightsource Enderby PV+BESS
PRO-003854, Lightsource Renewable UK Development Limited
Derbyshire Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Wakeleys BESS
PRO-003921, EPL NEWCO6 LIMITED
Wakeleys 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Wymondley GEC (Ethos Green)
PRO-003934, WYMONDLEY GREEN ENERGY CENTRE LTD
Wymondley 2 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Equinor Celtic Sea 2
PRO-004038, EQUINOR NEW ENERGY LIMITED
EQUINOR 66KV OFFSHORE SUBSTATION
Wind Offshore
Gate changed from 1 to blank
Devol Moor Battery & Solar Project
PRO-004084, Sunshine Project 03 Limited
Devol Moor 400/132kV
Energy Storage System
Gate changed from blank to 1
AGS Nerston BESS
PRO-004216, Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
Energy Storage System
Gate changed from blank to 1
NatPower Penrith Green Energy Park
PRO-004278, LEITH ENERGY LIMITED
Lancashire Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
West Weybridge
PRO-004324, EL (WEST WEYBRIDGE) LIMITED
West Weybridge 275kV Substation
Energy Storage System
Gate changed from blank to 2
Hockliffe GEC (Ethos Green)
PRO-004342, HOCKLIFFE GREEN ENERGY CENTRE LTD
Dunstable 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lambeeth 240MW
PRO-004361, ECODEV GROUP LTD
Pembroke 400kV Substation
Energy Storage System
Gate changed from blank to 1
Dunan Hill
PRO-004433, PERIGUS ENERGY UK LIMITED
Dunan Hill 400kV substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Glen Lednock
PRO-004520, Glen Lednock Wind Farm Limited
Glen Lednock 132kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
AGS Coatbridge
PRO-004544, Advance Grid Solutions Limited
Coatbridge GSP
Energy Storage System
Gate changed from blank to 1
Church Road Farm
PRO-005074, QAIR RENEWABLES UK LIMITED
South Anglia Connection Node D 132kV Substation
Energy Storage System
Gate changed from blank to 1
Stella Battery Energy Storage
PRO-005112, CAPELLA BESS LTD
Stella South GSP
Energy Storage System
Gate changed from blank to 2
Leuchland Energy Centre A
PRO-005765, LEUCHLAND ENERGY CENTRE LIMITED
Leuchland Farm IDNO
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Melvich Wind Energy Hub (BEGA)
PRO-006005, Melvich Wind Energy Hub Limited
Dounreay 2 275/33kV GSP Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Galileo 14 Ltd
PRO-006019, GALILEO 14 LIMITED
Staffordshire Connection Node C 400Kv Substation
Energy Storage System
Gate changed from blank to 1
Crookedstone PV
PRO-006119, Enviromena Project Management UK Limited
Strathaven GSP 33kV
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1

By plant type

Plant typeProjects with a changeNewBack on the registerRemovedNet capacity change
Energy Storage System147490+105.3 MW
Energy Storage System;PV Array (Photo Voltaic/solar)820151−90 MW
Wind Onshore40012−117.9 MW
Wind Offshore15201+400 MW
Energy Storage System;Wind Onshore110000 MW
PV Array (Photo Voltaic/solar)90000 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)8001−625 MW
Demand;Energy Storage System60000 MW
CCGT (Combined Cycle Gas Turbine)50000 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation40000 MW
Energy Storage System;Gas Reciprocating4021−1,318 MW
Oil & AGT (Advanced Gas Turbine)4400+22 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore30000 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore30000 MW
Energy Storage System;Reactive Compensation30000 MW
Pump Storage30000 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore10000 MW
Demand;LAES (Liquid Air Energy Storage)10000 MW
Demand;PV Array (Photo Voltaic/solar)10000 MW
Demand;Wind Onshore10000 MW
Energy Storage System;Hydro;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore10000 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore10000 MW
Nuclear10010 MW
Thermal10000 MW
Waste10000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.

By connection site

Connection siteProjects with a changeNewBack on the registerRemovedNet capacity change
Braintree 400kV Substation50200 MW
High Marnham 400kV Substation50000 MW
Cilfynydd 400kV Substation40000 MW
Fiddlers Ferry 275kV Substation40000 MW
Alverdiscott 400kV Substation30000 MW
Bramley 400kV Substation30000 MW
Dunstable 400kV Substation30200 MW
Grimsby West 400kV Substation30000 MW
Humber Refinery 400kV Substation3021−1,318 MW
Necton 400kV Substation3201+400 MW
Pembroke 400kV Substation30000 MW
Strathy Wood 132/33kV Substation3012−117.9 MW
Willington 400kV Substation3001−625 MW
BEARSDEN BESS 275KV SUBSTATION20200 MW
Berryburn 275/33kV GSP Substation20000 MW
Bicker Fen 400kV Substation20000 MW
Breakish 132kV Substation20000 MW
Cheshire Connection Node A 400kV Substation20000 MW
Chirk GSP20000 MW
Coupar Angus 132/33kV GSP20000 MW
Drakelow 132kV Substation20000 MW
Dun Hill 132/33kV20000 MW
Earl Shilton 400kV Substation20200 MW
Eccles 400kV Substation20000 MW
Edinbane 132/33kV Substation20000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 290.

Earlier comparisons

Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.