File dated 11 Sep 2026compared withFile dated 20 Oct 2026How the files are matchedThe file dated 11 Sep 2026 is an archived copy (Internet Archive), not a file N84 collected from NESO.
N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; each change below happened at some point in that time, not necessarily this week. Wide comparisons
Changes between the two files
423 changesacross 356 projects. Net change −1.62 GW (new, left the register and capacity changes), plus 13.09 GW back on the register after being absent from the archived copies dated 8 Sep 2026 and 11 Sep 2026 (Internet Archive).- Status, stage or gate changed242
- Connection date later74
- Connection date earlier58
- Back on the register27
- New on the register10
- Left the register7
- Capacity changed3
- Connection date added or removed2
Table view
| Type | Changes |
|---|---|
| Status, stage or gate changed | 242 |
| Connection date later | 74 |
| Connection date earlier | 58 |
| Back on the register | 27 |
| New on the register | 10 |
| Left the register | 7 |
| Capacity changed | 3 |
| Connection date added or removed | 2 |
Capacity in and out
TEC file dated 20 Oct 2026 against 11 Sep 2026 (archived copy)
Not in the chart: 13.09 GW across 27 projects back on the register, absent from the archived copies dated 8 Sep 2026 and 11 Sep 2026 (Internet Archive) and printed again in the file dated 20 Oct 2026. See them
Table view
| Step | MW |
|---|---|
| New | +1,921.7 |
| Capacity up | 0 |
| Capacity down | −699.4 |
| Removed | −2,845.9 |
| Net | 1,623.6 |
| Back on the register (not in the net) | 13,089.5 |
Biggest date moves
The days are calculated by N84 from the two printed dates. The register does not say why a date moved.
Data centres in the pipeline
Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.
Get Queue movers by email
Free. One email when a new NESO TEC Register edition prints a change for a project or connection site you name.
Every change, in full
| Project | Connection site | What the files print |
|---|---|---|
| New on the register 10 | ||
| Vanguard PRO-000459-1, NORFOLK VANGUARD WEST LIMITED | Necton 400kV Substation Wind Offshore | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Oct 2026 |
| Vanguard PRO-000459-2, NORFOLK VANGUARD WEST LIMITED | Necton 400kV Substation Wind Offshore | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 1,320 MW in the file dated 20 Oct 2026 |
| PeakGen BEGA - Didcot PRO-006058, PEAK GEN POWER LIMITED | Didcot GSP Oil & AGT (Advanced Gas Turbine) | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 4 MW in the file dated 20 Oct 2026 |
| PeakGen BEGA - Hatfield PRO-006066, PEAK GEN TOP CO LIMITED | Hatfield GSP Oil & AGT (Advanced Gas Turbine) | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 6 MW in the file dated 20 Oct 2026 |
| PeakGen BEGA - Haydock PRO-006067, PEAK GEN POWER LIMITED | Haydock GSP Oil & AGT (Advanced Gas Turbine) | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 6 MW in the file dated 20 Oct 2026 |
| PeakGen BEGA - Coventry PRO-006068, PEAK GEN TOP CO LIMITED | Coventry GSP Oil & AGT (Advanced Gas Turbine) | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 6 MW in the file dated 20 Oct 2026 |
| Care Brentwood BEGA PRO-006780, CARE POWER (BRENTWOOD) LIMITED | Warley GSP Energy Storage System | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Oct 2026 |
| Care Power Berkeley BEGA PRO-006810, Care Power (Berkeley) Limited | Severn Connection Node A 132kV Substation Energy Storage System | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Oct 2026 |
| Care Wolverhampton BEGA PRO-006837, CARE POWER (WOLVERHAMPTON) LIMITED | Penn GSP Energy Storage System | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Oct 2026 |
| Care North Tawton BEGA PRO-006838, CARE POWER (NORTH TAWTON) LIMITED | Alverdiscott GSP Energy Storage System | Not in the file dated 11 Sep 2026 or any earlier file N84 holds; printed with 30 MW in the file dated 20 Oct 2026 |
| Back on the register 27 | ||
| Immingham PRO-000053-1, VPI IMMINGHAM LLP | Humber Refinery 400kV Substation Energy Storage System;Gas Reciprocating | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 1,268 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 22 Jul 2025 |
| Immingham PRO-000053-2, VPI IMMINGHAM LLP | Humber Refinery 400kV Substation Energy Storage System;Gas Reciprocating | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 1,318 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 22 Jul 2025 |
| Strathy Wood Wind Farm PRO-000154, RWE Renewables UK Onshore Wind Limited | Strathy Wood 132/33kV Substation Wind Onshore | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 63.5 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 31 May 2024 |
| Elmya Dunbar BESS PRO-002290, ELMYA ENERGY UK 1 LIMITED | Thorntonloch 400kV Substation Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 400 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Bulls Lodge Farm PRO-002676, 548 UK INVESTMENT HOLDINGS LIMITED | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Patford Bridge Farm PRO-002680, 548 UK INVESTMENT HOLDINGS LIMITED | Patford Bridge 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Enderby Farm PRO-002682, 548 UK INVESTMENT HOLDINGS LIMITED | Earl Shilton 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Ryhall Farm PRO-002684, 548 UK INVESTMENT HOLDINGS LIMITED | Casewick 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Sundon Farm PRO-002685, 548 UK INVESTMENT HOLDINGS LIMITED | Dunstable 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Yaxley Farm PRO-002688, 548 UK INVESTMENT HOLDINGS LIMITED | Yaxley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Bulls Lodge Farm 2 PRO-002737, 548 UK INVESTMENT HOLDINGS LIMITED | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 350 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Marston Farm 2 PRO-002740, 548 UK INVESTMENT HOLDINGS LIMITED | Marston Vale 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 350 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Patford Bridge Farm 2 PRO-002741, 548 UK INVESTMENT HOLDINGS LIMITED | New Patford Bridge 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 350 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Enderby Farm 2 PRO-002743, 548 UK INVESTMENT HOLDINGS LIMITED | Earl Shilton 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 700 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Sundon Farm 2 PRO-002746, 548 UK INVESTMENT HOLDINGS LIMITED | Dunstable 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 700 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Hunterston PRO-003182, ELMYA RPC UK HUNTERSTON LIMITED | KEPPEN BURN 400KV SUBSTATION Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 400 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Blairgowrie BESS PRO-003482, WOODSIDE BESS LTD | Blairgowrie BESS 132kV Substation Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 200 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Dalry BESS & PV PRO-003735, ELMYA ENERGY UK 17 LIMITED | Dalry 400kV Substation Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 800 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Morningside BESS & PV PRO-004396, ELMYA RPC UK MORNINGSIDE LIMITED | Elmya Morningside 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 400 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Bearsden BESS PRO-004404-1, BEARSDEN BESS LTD | BEARSDEN BESS 275KV SUBSTATION Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 100 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Bearsden BESS PRO-004404-2, BEARSDEN BESS LTD | BEARSDEN BESS 275KV SUBSTATION Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 240 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Bathgate BESS PRO-004416, RPC ELMYA CARNATION BATHGATE LIMITED | Armadale 400kv Substation Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 300 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Gissing BESS & PV PRO-004657, RPC ELMYA CARNATION GISSING LIMITED | North Anglia Connection Node A 400kV Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 900 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Kilworth BESS & PV PRO-004739, RPC ELMYA CARNATION KILWORTH LIMITED | Derbyshire Connection Node H 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 850 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Towcester BESS PRO-004809, RPC ELMYA CARNATION TOWCESTER LIMITED | Derbyshire Connection Node I 400kV Substation Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 550 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Ryston BESS & PV PRO-004923, ELMYA ENERGY UK 13 LIMITED | North Anglia Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 850 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Elmya Foxdale BESS PRO-004934, RPC ELMYA CARNATION FOXDALE LIMITED | Trent Valley South Connection Node C 400kV Substation Energy Storage System | Absent from the file dated 11 Sep 2026 (archived copy); printed again with 800 MW in the file dated 20 Oct 2026. Last printed before that in the file dated 17 Apr 2026 |
| Removed from the register 7 | ||
| Immingham PRO-000053, VPI IMMINGHAM LLP | Humber Refinery 400kV Substation Energy Storage System;Gas Reciprocating | Printed with 1,318 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Hinkley Point B PRO-000141, EDF Energy Nuclear Generation Limited | Hinkley Point 400kV Substation Nuclear | Printed with 0 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Strathy Wood Wind Farm PRO-000154-1, RWE Renewables UK Onshore Wind Limited | Strathy Wood 132/33kV Substation Wind Onshore | Printed with 54.4 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Strathy Wood Wind Farm PRO-000154-2, RWE Renewables UK Onshore Wind Limited | Strathy Wood 132/33kV Substation Wind Onshore | Printed with 63.5 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Vanguard PRO-000459, NORFOLK VANGUARD WEST LIMITED | Necton 400kV Substation Wind Offshore | Printed with 1,320 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Willington Green Energy Centre PRO-001797-3, WILLINGTON NG LIMITED | Willington 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 0 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Melksham Grid Park ESS & PV PRO-004164, JEPIPHANY LIMITED | Melksham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 90 MW in the file dated 11 Sep 2026; not in the file dated 20 Oct 2026 |
| Connection date later 74 | ||
| NatPower Llanteg Green Energy Park PRO-004806, NP SPV 30 LIMITED | South Wales West Connection Node C 400kV Energy Storage System | MW Effective From moved from 31 Oct 2028 to 31 Dec 2037 (+3,348 days) |
| Ninfield PRO-003408, Ninfield 10 Renewables Limited | Sussex and Romney Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2030 to 31 Oct 2037 (+2,557 days) |
| Beinn Dearg PRO-005936, GALILEO 19 LIMITED | NEW TAYNUILT 132 KV SUBSTATION Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | MW Effective From moved from 31 Oct 2031 to 31 Oct 2037 (+2,192 days) |
| Ewerby PRO-002017, Leoda Solar Farm Limited | Navenby 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2029 to 30 Oct 2035 (+2,191 days) |
| Botley West - Cote Solar Power Station PRO-001587, SOLARFIVE LTD | Farmoor 400kV Substation PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2026 to 31 Oct 2031 (+1,827 days) |
| L48 BESS Glen App PRO-003058, S4 UK DEV LTD | L48 BESS GLEN APP 275/132KV SUBSTATION Energy Storage System | MW Effective From moved from 31 Oct 2028 to 31 Oct 2033 (+1,826 days) |
| Aitkenhead Farm BESS PRO-002585, Aitkenhead Storage Facility Limited | Clydesmill 275/33kV Demand;Energy Storage System | MW Effective From moved from 31 Oct 2028 to 30 Apr 2033 (+1,642 days) |
| Chalmerston Windfarm PRO-004057, BROCKWELL ENERGY LIMITED | CHALMERSTON WINDFARM 132kV SUBSTATION Wind Onshore | MW Effective From moved from 31 Oct 2033 to 31 Oct 2037 (+1,461 days) |
| Bradford Solar Farm PRO-003511, SolarFour Ltd | Staffordshire Connection Node A 400kV Substation PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days) |
| Daventry High Impact Green Energy Hub (HIGEH) 1 PRO-003686, TELIS ENERGY UK LIMITED | Derbyshire Connection Node A 400kV Substation Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days) |
| Feckenham PV & BESS Station PRO-003233, IB VOGT UK LTD | Feckenham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days) |
| Noventum -Long Stratton PRO-004405, Noventum Power Solar 8 Limited | North Anglia Connection Node A 400kV Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 30 Oct 2038 (+1,460 days) |
| Willington BESS Station PRO-003727, IBV WILLINGTON ENERGY PARK LIMITED | Derbyshire Connection Node D 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days) |
| SAGE PRO-002119, SAGE NORTH SEA LIMITED | St Fergus Mobil 132/11kV Substation Demand;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Jun 2025 to 30 Apr 2029 (+1,400 days) |
| Ashbrook Lane BESS PRO-003534, Downing Renewable Developments LLP | WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION Energy Storage System | MW Effective From moved from 31 Oct 2031 to 31 Oct 2034 (+1,096 days) |
| Astwood Solar Farm GEC PRO-004799, ASTWOOD GREEN ENERGY LTD | West Anglia Connection Node G 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 31 Oct 2037 (+1,096 days) |
| Ratcliffe on Soar PRO-003224, Starlight Energy SPV 4 Limited | Derbyshire Connection Node F 132KV Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 31 Oct 2037 (+1,096 days) |
| Solomons Farm BESS PRO-003181, Solomons BESS Ltd | North Kent Connection Node B 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2030 to 31 Oct 2033 (+1,096 days) |
| Merlin Offshore Wind Farm PRO-001728, OFFSHORE WIND LIMITED | Alverdiscott 400kV Substation Wind Offshore | MW Effective From moved from 1 Nov 2028 to 30 Oct 2031 (+1,093 days) |
| Upper Beoch Windfarm PRO-004068, BROCKWELL ENERGY LIMITED | New Cumnock North 132kV Substation Wind Onshore | MW Effective From moved from 31 Oct 2033 to 31 Jul 2036 (+1,004 days) |
| Fleet (Tertiary) PRO-001087, CSE23 LIMITED | Fleet 400kV Substation PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2026 to 30 Jul 2029 (+1,003 days) |
| Braintree PRO-001042-1, PIVOTED POWER LLP | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2024 to 30 May 2027 (+942 days) |
| Middleton BESS PRO-002305, Middleton Energy Storage Limited | Middleton 400KV Substation Energy Storage System | MW Effective From moved from 30 Nov 2026 to 31 May 2029 (+913 days) |
| EcoKincardine PRO-003557, Econergy International Limited | Kincardine North 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Jul 2028 to 31 Oct 2030 (+822 days) |
| Whitehouse BESS station PRO-002237, IGP INTERNATIONAL PROSPECTING LIMITED | Whitehouse 275kV Substation Demand;Energy Storage System | MW Effective From moved from 31 Jul 2032 to 31 Oct 2034 (+822 days) |
| East Claydon High Impact Green Energy Hub (HIGEH) 1 PRO-002652, EAST CLAYDON STORAGE LIMITED | East Claydon 400kV Substation Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore | MW Effective From moved from 31 Oct 2034 to 6 Dec 2036 (+767 days) |
| Frome Valley Energy Park PRO-006617, BIOSOUTH ENERGY LIMITED | Chickerell-Mannington 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 31 Oct 2039 (+730 days) |
| Orchard BESS PRO-003762, RE Projects Development Limited | Staffordshire Connection Node B 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2035 to 30 Oct 2037 (+730 days) |
| Stoke Bardolph 400 PRO-002191-3, ENSO GREEN HOLDINGS LIMITED | Stoke Bardolph 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2032 to 31 Oct 2034 (+730 days) |
| GF Thornton Energy BESS PRO-003449, THORNTON ENERGY LTD | North Humber Connection Node A 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| Hawthorn BESS PRO-003492, REWE 8 LIMITED | Wearside Connection Node B 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| West Melton PV & BESS Station PRO-004061, IBV WEST MELTON SOLAR PARK LIMITED | Leeds North Connection Node C 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| Alverdiscott PRO-001136-1, PIVOTED POWER LLP | Alverdiscott 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2029 to 31 Aug 2031 (+669 days) |
| Sundon PRO-001132, SUNDON BATTERY STORAGE LIMITED | Sundon 400kV Substation Energy Storage System | MW Effective From moved from 5 Sep 2025 to 30 Apr 2027 (+602 days) |
| Rowancraig Wind Farm PRO-002455, Koehler Renewable Energy UK Limited | ROWANCRAIG WIND FARM 33KV SUBSTATION Wind Onshore | MW Effective From moved from 30 Oct 2028 to 31 May 2030 (+578 days) |
| Wymondley PRO-001245, Priory Generation Limited | Wymondley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2025 to 30 May 2027 (+576 days) |
| Wymondley Solar Farm PRO-001105, AGR SOLAR 4 LIMITED | Wymondley 400/33kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2025 to 30 May 2027 (+576 days) |
| Alcemi Score 2 Battery Energy Storage Facility PRO-001790, ALCEMI STORAGE DEVELOPMENTS 5 LIMITED | Alcemi Score Battery 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2029 to 31 Mar 2031 (+516 days) |
| Alcemi Score Battery Energy Storage Facility PRO-001575, ALCEMI STORAGE DEVELOPMENTS 5 LIMITED | ALCEMI SCORE BATTERY ENERGY STORAGE FACILITY 400KV SUBSTATION Energy Storage System | MW Effective From moved from 31 Oct 2029 to 31 Mar 2031 (+516 days) |
| Medway 3 Power Station PRO-002578, MEDWAY POWER LIMITED | Kingsnorth 400kV Substation Demand;LAES (Liquid Air Energy Storage) | MW Effective From moved from 31 Dec 2030 to 30 Apr 2032 (+486 days) |
| New Deer BESS Station PRO-001856, ABBOTSHAUGH ENERGY STORAGE LIMITED | New Deer 2 400kV Substation Energy Storage System | MW Effective From moved from 30 Jul 2032 to 31 Oct 2033 (+458 days) |
| Stella Battery Energy Storage PRO-005112, CAPELLA BESS LTD | Stella South GSP Energy Storage System | MW Effective From moved from 27 Sep 2025 to 30 Nov 2026 (+429 days) |
| Warley PRO-001113, WARLEY BATTERY STORAGE LIMITED | Warley 275kV Substation Energy Storage System | MW Effective From moved from 31 Aug 2027 to 30 Oct 2028 (+426 days) |
| Cellarhead 400kV Energy Storage PRO-001685, C & S ENERGY LIMITED | Cellarhead 400kV Substation Energy Storage System | MW Effective From moved from 16 Jul 2027 to 13 Sep 2028 (+425 days) |
| Bicker Fen 1 Solar PRO-001034-1, AGR SOLAR 2 LIMITED | Bicker Fen 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 26 Sep 2025 to 31 Oct 2026 (+400 days) |
| Enderby Tertiary PRO-000430, CLUMP FARM SOLAR LIMITED | Enderby 400kV Substation PV Array (Photo Voltaic/solar) | MW Effective From moved from 1 Aug 2027 to 31 Aug 2028 (+396 days) |
| Lightsource Ferryside PV PRO-003761, Lightsource Renewable UK Development Limited | South Wales West Connection Node C 400kV Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2037 to 31 Oct 2038 (+366 days) |
| Tealing Solar & Storage PRO-001501, SIRIUS ECODEV (TEALING) LTD | Tealing IDNO 132/33kV GSP Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2027 to 31 Oct 2028 (+366 days) |
| Cilfynydd Green Energy Centre PRO-001663-1, CILFYNYDD NG LIMITED | Cilfynydd 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | MW Effective From moved from 30 Oct 2028 to 30 Oct 2029 (+365 days) |
| Denton Estate Solar PV and BESS PRO-004417, ELGIN ENERGY ES CO LIMITED | Navenby 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2033 to 30 Oct 2034 (+365 days) |
| Intwood Farm BESS PRO-003180, Intwood BESS Ltd | North Anglia Connection Node A 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days) |
| Stoke Bardolph 400 PRO-002191-1, ENSO GREEN HOLDINGS LIMITED | Stoke Bardolph 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2030 to 31 Oct 2031 (+365 days) |
| Zenobe Spennymoor BESS PRO-003692, ZENOBE ENERGY LIMITED | Wearside Connection Node D 400kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2034 to 30 Oct 2035 (+365 days) |
| Kirkton Wind Farm PRO-001811, Kirkton Wind Farm Limited | Connagill 275kV Substation Wind Onshore | MW Effective From moved from 31 Oct 2028 to 29 Oct 2029 (+363 days) |
| West Weybridge PRO-004324, EL (WEST WEYBRIDGE) LIMITED | West Weybridge 275kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2027 to 30 Sep 2028 (+335 days) |
| Smeaton BESS PRO-002635, KONA ASSET 3 LIMITED | Smeaton 400kV Energy Storage System | MW Effective From moved from 30 Sep 2027 to 31 Jul 2028 (+305 days) |
| Elstree Energy Storage PRO-003205, ELSTREE BATTERY STORAGE LIMITED | Letchmore Heath 132kV Substation Energy Storage System | MW Effective From moved from 1 Oct 2029 to 31 Jul 2030 (+303 days) |
| Willington Energy Park PRO-001964, BROCKWELL STORAGE & SOLAR LIMITED | Willington 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Mar 2028 to 31 Oct 2028 (+215 days) |
| Mosedale Energy PRO-002319, MOSEDALE ENERGY LIMITED | High Marnham 400kV Substation Energy Storage System | MW Effective From moved from 31 Mar 2033 to 31 Oct 2033 (+214 days) |
| Braintree PRO-001042-2, PIVOTED POWER LLP | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2026 to 30 May 2027 (+212 days) |
| Red Moss Farm PRO-002613, QAIR RENEWABLES UK LIMITED | Red Moss Farm 132kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2030 to 30 May 2031 (+212 days) |
| Keithick 16 Solar & BESS PRO-001890, SIRIUS ECODEV (KEITHICK) LTD | Coupar Angus 132/33kV GSP Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Jun 2026 to 31 Dec 2026 (+184 days) |
| Pentland Floating Offshore Wind Farm PRO-001472, HIGHLAND WIND LIMITED | Pentland Floating Offshore Wind Farm 132/66kV substation Wind Offshore | MW Effective From moved from 31 Oct 2027 to 3 Apr 2028 (+155 days) |
| Aberthaw PV & BESS Generation PRO-001815, REWE 12 Limited | Aberthaw 275kV Substation Energy Storage System | MW Effective From moved from 30 Jun 2029 to 31 Oct 2029 (+123 days) |
| Scottish Water Bonnybridge STW 60MW BESS PRO-002410, Bluestone Energy Ltd | Bonnybridge 132/33kV Energy Storage System | MW Effective From moved from 31 Jul 2030 to 31 Oct 2030 (+92 days) |
| Caegarw Farm PRO-002605, Downing Renewable Developments LLP | Margam B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 10 Mar 2037 to 10 May 2037 (+61 days) |
| Glen Lednock PRO-004520, Glen Lednock Wind Farm Limited | Glen Lednock 132kV Substation Energy Storage System;Wind Onshore | MW Effective From moved from 31 Oct 2031 to 30 Nov 2031 (+30 days) |
| Windburn Wind Farm PRO-006075, WINDBURN WIND FARM LIMITED | Devonside 132kV Substation Energy Storage System;Wind Onshore | MW Effective From moved from 1 Oct 2034 to 31 Oct 2034 (+30 days) |
| Weaver BESS PRO-002571, Frodsham Devco Limited | Frodsham 400kV Substation Energy Storage System | MW Effective From moved from 1 Nov 2037 to 11 Nov 2037 (+10 days) |
| Didcot Battery PRO-001468, DIDCOT BATTERY LIMITED | DIDCOT 400/132KV SUBSTATION Demand;Energy Storage System | MW Effective From moved from 30 Mar 2027 to 31 Mar 2027 (+1 days) |
| EcoWymondley PRO-002529, Econergy International Limited | Wymondley 2 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2033 to 31 Oct 2033 (+1 days) |
| Rat Hall Mod App PRO-003824-1, Kingsway Solar Farm Limited | South Anglia Connection Node C 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2032 to 31 Oct 2032 (+1 days) |
| Thainstone Energy Park PRO-001493, AGILE ENERGY RECOVERY (INVERURIE) LIMITED | Kintore GSP Waste | MW Effective From moved from 30 Oct 2029 to 31 Oct 2029 (+1 days) |
| Worksop BESS PRO-003657, ARM Cedar Limited | Trent Valley South Connection Node B 400kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2034 to 31 Oct 2034 (+1 days) |
| Connection date earlier 58 | ||
| Milligansbush Battery Storage PRO-003430, Milligansbush Battery Storage Ltd | Milligansbush Battery Storage 132kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2036 to 25 Mar 2031 (−2,046 days) |
| Walham 700MW BESS PRO-002551, GPC 1154 Ltd | Walham 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2038 to 17 Nov 2033 (−1,809 days) |
| Rothienorman Battery PRO-001971, BLACKFORD RENEWABLES LTD | Rothienorman 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 30 Jul 2029 (−1,554 days) |
| Moelfre Energy Park PRO-001500, MOELFRE ENERGY PARK LIMITED | Bodelwyddan 400kV Substation Energy Storage System | MW Effective From moved from 1 Oct 2033 to 31 Oct 2029 (−1,431 days) |
| Morton Manor PV & BESS Station PRO-003827, IB VOGT UK LTD | High Marnham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2034 (−1,097 days) |
| Petroc Offshore Wind Farm PRO-001661, BLUEFLOAT ENERGY UK HOLDINGS LIMITED | Alverdiscott 400kV Substation Wind Offshore | MW Effective From moved from 31 Mar 2029 to 31 Mar 2026 (−1,096 days) |
| Waltham Cross PV & BESS Sub PRO-005801, EPPING ENERGY PARK LIMITED | Waltham Cross B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2032 to 31 Oct 2029 (−1,096 days) |
| Zenobe Butler's Wood BESS PRO-004085, ZENOBE ENERGY LIMITED | Butlers Wood 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 31 Oct 2034 (−1,096 days) |
| Montreathmont Moor Forest PRO-001849, Montreathmont Energy Centre Limited | Lunanhead GSP Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 8 Oct 2029 to 31 Oct 2026 (−1,073 days) |
| Devol Moor Battery & Solar Project PRO-004084, Sunshine Project 03 Limited | Devol Moor 400/132kV Energy Storage System | MW Effective From moved from 17 Oct 2029 to 27 Sep 2027 (−751 days) |
| Epworth PV & BESS Station PRO-003644, IBV KELFIELD SOLAR LTD | Trent Valley North Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days) |
| Hill Farm PRO-003983, QAIR RENEWABLES UK LIMITED | Capenhurst GSP Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days) |
| Zenobe Hawthorn Pit BESS PRO-004086, ZENOBE ENERGY LIMITED | Wearside Connection Node B 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days) |
| Drum Farm Energy Storage Facility PRO-001726, Field Drum Farm Ltd | Keith 2 132/33kV GSP Substation Energy Storage System | MW Effective From moved from 31 Oct 2028 to 31 Oct 2026 (−731 days) |
| Great Coates BESS PRO-003960, BRUTON ONE BESS LIMITED | Grimsby West 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 31 Oct 2031 (−731 days) |
| Bicker Fen 1 Solar PRO-001034-2, AGR SOLAR 2 LIMITED | Bicker Fen 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 1 Apr 2035 to 1 Apr 2033 (−730 days) |
| Capenhurst Tertiary PRO-002162, ENSO GREEN HOLDINGS Q LIMITED | Capenhurst 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2029 to 31 Oct 2027 (−730 days) |
| Kingsnorth BESS NP PRO-002665, NORIKER POWER LTD | Kingsnorth 400kV Substation Energy Storage System | MW Effective From moved from 29 Oct 2032 to 31 Dec 2030 (−668 days) |
| Bryn Tilti PRO-001586, RHIWLAS ENERGY PARK LIMITED | Chirk GSP Wind Onshore | MW Effective From moved from 19 Jul 2028 to 4 Feb 2027 (−531 days) |
| Bramford GEC (Ethos Green) PRO-004027, BRAMFORD GREEN ENERGY CENTRE LTD | Bramford B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2033 to 1 Jun 2032 (−516 days) |
| Knocknagael BESS PRO-003712, FIELD KNOCKNAGAEL LTD | Knocknagael 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2030 to 30 Jul 2029 (−458 days) |
| Dunan Hill PRO-004433, PERIGUS ENERGY UK LIMITED | Dunan Hill 400kV substation Energy Storage System;Wind Onshore | MW Effective From moved from 11 Nov 2036 to 31 Oct 2035 (−377 days) |
| Ceislein Wind Farm PRO-003256, RWE Renewables UK Onshore Wind Limited | Ceislien Wind Farm Wind Onshore | MW Effective From moved from 31 Oct 2031 to 31 Oct 2030 (−365 days) |
| Rugby High Impact Green Energy Hub (HIGEH) 1 PRO-003626, TELIS ENERGY UK LIMITED | Enderby 400kV Substation Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | MW Effective From moved from 31 Oct 2034 to 31 Oct 2033 (−365 days) |
| Navenby Farm PRO-004045, CODDINGTON 10 RENEWABLES LTD | Coddington 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2034 to 30 May 2034 (−153 days) |
| Bilbo Farm PRO-001301-1, LEL BILBO SOLAR LIMITED | Strichen 132/33kV GSP Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2024 to 30 Jun 2024 (−123 days) |
| NatPower Kinoulton Green Energy Park PRO-004333, DALBY ENERGY LIMITED | West Anglia Connection Node C 400kV Substation Energy Storage System | MW Effective From moved from 31 Dec 2034 to 31 Oct 2034 (−61 days) |
| Cowley Farm 2 PRO-002738, COWLEY 7 RENEWABLES LTD | Cowley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Nov 2038 to 1 Oct 2038 (−60 days) |
| Biggleswade BESS PRO-002165, Central Bedfordshire Council | Biggleswade 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2029 to 28 Sep 2029 (−33 days) |
| Field Farm PRO-001924, Net Zero One Ltd | Staythorpe 400kv Energy Storage System | MW Effective From moved from 31 Oct 2030 to 30 Sep 2030 (−31 days) |
| Cilfynydd BESS PRO-002756, Cilfynydd BESS Limited | Cilfynydd 400kV Substation Energy Storage System | MW Effective From moved from 15 Oct 2037 to 15 Sep 2037 (−30 days) |
| Isle of Man Offshore Wind Farm PRO-003698, Mooir Vannin Offshore Wind Farm Limited | IMW01 OFFSHORE 275/66KV OFFSHORE SUBSTATION Wind Offshore | MW Effective From moved from 30 Oct 2037 to 30 Sep 2037 (−30 days) |
| Lethen Wind Farm PRO-002307, FRED OLSEN RENEWABLES LIMITED | Lethen Wind Farm 132/33kV Substation Wind Onshore | MW Effective From moved from 31 Dec 2033 to 1 Dec 2033 (−30 days) |
| West Burton Solar Project PRO-000561, WEST BURTON SOLAR PROJECT LIMITED | West Burton 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Nov 2028 to 31 Oct 2028 (−30 days) |
| Tarenni PRO-001641, TARENNI ENERGY PARK LIMITED | Rhigos 400kV Substation Wind Onshore | MW Effective From moved from 31 Dec 2030 to 13 Dec 2030 (−18 days) |
| Capenhurst PRO-000540, ENSO GREEN HOLDINGS Q LIMITED | Capenhurst 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Sep 2033 to 14 Sep 2033 (−16 days) |
| Beddington 1 BESS PRO-003170, Bluestone Beddington 1 Ltd | London South Connection Node A 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Bicker Fen PRO-004295, IB VOGT UK LTD | Trent Valley South Connection Node C 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days) |
| Bute Hydrogen Project 1 PRO-004124, HALDANE ENERGY PROJECT 1 LIMITED | Trent Valley South Connection Node D 400kV Substation CCGT (Combined Cycle Gas Turbine) | MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days) |
| Bute Hydrogen Project 2 PRO-004125, HALDANE ENERGY PROJECT 2 LIMITED | Creyke Beck 400kV Substation CCGT (Combined Cycle Gas Turbine) | MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days) |
| Bute Hydrogen Project 3 PRO-004126, HALDANE ENERGY PROJECT 3 LIMITED | Grimsby West 400kV Substation CCGT (Combined Cycle Gas Turbine) | MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days) |
| Bute Hydrogen Project 4 PRO-004127, HALDANE ENERGY PROJECT 4 LIMITED | Teeside Connection Node 2 C 132/400kV Substation CCGT (Combined Cycle Gas Turbine) | MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days) |
| Bute Hydrogen Project 6 PRO-004129, Haldane Energy Project 6 Limited | Cheshire Connection Node A 400kV Substation CCGT (Combined Cycle Gas Turbine) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| CODDINGTON BESS PRO-003666, SHAW-ENERGI LTD | Trent Valley South Connection Node A 400kV Energy Storage System | MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days) |
| Cottam-Ryhall Solar & BESS PRO-004100, CRH RENEWABLES LIMITED | Trent Valley South Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days) |
| Daines NP BESS PRO-003194, Daines Flexpower Limited | Manchester South connection node A 400kv Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Havbredey PRO-001628, HAVBREDEY LIMITED | New Dounreay 400kV substation Wind Offshore | MW Effective From moved from 31 Oct 2033 to 30 Oct 2033 (−1 days) |
| Kenwick Solar PRO-005989, ANESCO LIMITED | Shrewsbury 400kV Substation PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Leadenham High Impact Green Energy Hub PRO-003815, TELIS ENERGY UK LIMITED | Trent Valley South Connection Node A 400kV Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days) |
| Lightsource Enderby PV+BESS PRO-003854, Lightsource Renewable UK Development Limited | Derbyshire Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Nant Helen PRO-002766, SOLAR SECURITIES LIMITED | South Wales West Connection Node A 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| NatPower Penrith Green Energy Park PRO-004278, LEITH ENERGY LIMITED | Lancashire Connection Node B 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| New Marton Solar Farm - PVDP PRO-004139, SolarFour Ltd | Cheshire Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Pentir Green Energy Centre PRO-002345, INNOVA RENEWABLES LIMITED | Pentir 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Persley Croft BESS PRO-002546, Persley Croft BESS Ltd | Persley 132/33kV GSP Substation Energy Storage System | MW Effective From moved from 31 Jul 2026 to 30 Jul 2026 (−1 days) |
| Siddington BESS Station PRO-003942, IBV BIRTLES HILL ENERGY PARK LTD | Manchester South connection node A 400kv Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Wacton Road Farm PRO-004440, QAIR RENEWABLES UK LIMITED | North Anglia Connection Node A 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days) |
| Whitson BESS NP PRO-003102, EQUINOR NEW ENERGY LIMITED | South Wales East Node A 275kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Connection date removed 2 | ||
| Whitegate Tertiary Connection PRO-000512, HD144WHI LTD | Whitegate 275kV Substation Energy Storage System | MW Effective From was 30 Jun 2024; blank in the file dated 20 Oct 2026 |
| Almondell Lodge BESS & Solar Development PRO-001667, BROXBURN ENERGY STORAGE LIMITED | Broxburn 132/33kV Energy Storage System | MW Effective From was 30 Apr 2024; blank in the file dated 20 Oct 2026 |
| Capacity down 3 | ||
| Willington Green Energy Centre PRO-001797-1, WILLINGTON NG LIMITED | Willington 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | Cumulative Total Capacity changed from 1,025 MW to 400 MW (−625 MW) |
| Dersalloch Wind Farm Extension PRO-000412, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Dersalloch 132/33kV Energy Storage System | Cumulative Total Capacity changed from 85 MW to 11 MW (−74 MW) |
| Lyndhurst Camperdown BESS PRO-002658, Geocore Ltd | Charleston GSP 132/33kV Energy Storage System | Cumulative Total Capacity changed from 49.9 MW to 49.5 MW (−0.4 MW) |
| Project status changed 139 | ||
| Clashindarroch 2 PRO-000041, VATTENFALL WIND POWER LTD | Cairnford GSP Wind Onshore | Project Status changed from Scoping to Under Construction/Commissioning |
| Cruachan U3&4 Replacement PRO-000113-2, DRAX PUMPED STORAGE LIMITED | Cruachan 275kV Substation Pump Storage | Project Status changed from Scoping to Consents Approved |
| Stranoch Wind Farm PRO-000127, STRANOCH WINDFARM LIMITED | Stranoch Wind 132/33kV Substation Wind Onshore | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Lorg Wind Farm PRO-000153, RWE Renewables UK Onshore Wind Limited | Lorg Wind Farm 132/32kV Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Strathy South Wind PRO-000183, SSE GENERATION LIMITED | Strathy South 132/33kV Substation Wind Onshore | Project Status changed from Scoping to Consents Approved |
| Glenmuckloch Wind Farm PRO-000300, GLENMUCKLOCH RENEWABLE ENERGY LIMITED | Glenmuckloch 132/33kV Wind Onshore | Project Status changed from Awaiting Consents to Consents Approved |
| Loganhead Windfarm PRO-000306, LOGANHEAD WF LIMITED | Hopsrig Collector Substation Wind Onshore | Project Status changed from Awaiting Consents to Consents Approved |
| Pencloe Windfarm PRO-000323-2, PENCLOE WIND ENERGY LIMITED | Pencloe 132/33kV Substation Energy Storage System;Wind Onshore | Project Status changed from Awaiting Consents to Scoping |
| Scoop Hill Wind Farm PRO-000327, Community Windpower Limited | Scoop Hill Wind Farm 132kV Substation Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Pembroke BESS PRO-000337-1, RWE Generation UK Plc | Pembroke 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Pembroke BESS PRO-000337-2, RWE Generation UK Plc | Pembroke 400kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Whitelaw Brae Windfarm PRO-000341, WHITELAW BRAE WINDFARM LIMITED | Whitelaw Brae 'A' and 'B' 33kV Substations Wind Onshore | Project Status changed from Scoping to Under Construction/Commissioning |
| Inch Cape Offshore Wind Farm Platform 1 PRO-000348, INCH CAPE OFFSHORE LIMITED | Cockenzie 400/275kV Wind Offshore | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Inch Cape Offshore Wind Farm Platform 2 PRO-000349, INCH CAPE OFFSHORE LIMITED | Cockenzie 275kV substation Wind Offshore | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Windy Standard III Wind Farm PRO-000359-1, Windy Standard III Limited | Dun Hill 132/33kV Wind Onshore | Project Status changed from Awaiting Consents to Consents Approved |
| Windy Standard III Wind Farm PRO-000359-2, Windy Standard III Limited | Dun Hill 132/33kV Wind Onshore | Project Status changed from Awaiting Consents to Consents Approved |
| Bramley (tertiary) PRO-000396, BRAMLEY SOLAR LIMITED | Bramley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Under Construction/Commissioning |
| Dersalloch Wind Farm Extension PRO-000412, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Dersalloch 132/33kV Energy Storage System | Project Status changed from Consents Approved to Scoping |
| High Constellation Windfarm PRO-000416, HIGH CONSTELLATION WINDFARM LIMITED | High Constellation 132/33kV Substation Wind Onshore | Project Status changed from Scoping to Consents Approved |
| Enderby Tertiary PRO-000430, CLUMP FARM SOLAR LIMITED | Enderby 400kV Substation PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Iron Acton PRO-000491-2, IRON ACTON GREEN LIMITED | 132kV bay at Iron Acton Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Under Construction/Commissioning to Consents Approved |
| Thurrock Power Station PRO-000494-2, THURROCK FLEXIBLE GENERATION LIMITED | Tilbury 275kV Substation Energy Storage System;Gas Reciprocating | Project Status changed from Under Construction/Commissioning to Built |
| Whitegate Tertiary Connection PRO-000512, HD144WHI LTD | Whitegate 275kV Substation Energy Storage System | Project Status changed from Consents Approved to Built |
| Limekiln PRO-000515-2, Limekiln Extension Limited | Limekilns 132/33kV substation Energy Storage System;Wind Onshore | Project Status changed from Consents Approved to Scoping |
| High Marnham (Tertiary) PRO-000531, ENSO GREEN HOLDINGS K LIMITED | High Marnham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| West Burton Solar Project PRO-000561, WEST BURTON SOLAR PROJECT LIMITED | West Burton 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Daer Wind Farm PRO-000565, RWE Renewables UK Onshore Wind Limited | Daer Wind Farm 132/33kV Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Kincardine Battery Storage Facility PRO-000856, KINCARDINE GRID 1 LTD | Fife Grid Services Facility 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Cogle Moss Wind Farm PRO-000973, COGLE MOSS RENEWABLES LLP | Mybster 2 132/33kV Substation Wind Onshore | Project Status changed from Consents Approved to Scoping |
| Oaklands Farm Solar PV PRO-001004, OAKLANDS FARM SOLAR LIMITED. | Drakelow 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Greenburn Mixed Technology PRO-001006, REG GREENBURN LIMITED | Greenburn Mixed Technology 132kV Substation Wind Onshore | Project Status changed from Scoping to Consents Approved |
| Euchanhead Wind Farm PRO-001011, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Euchanhead 132kV Substation Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Carrick Wind Farm PRO-001026, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Carrick Wind Farm Substation Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Canterbury Tertiary PRO-001029, ENSO GREEN HOLDINGS L LIMITED | Canterbury North 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Bicker Fen 1 Solar PRO-001034-1, AGR SOLAR 2 LIMITED | Bicker Fen 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Awaiting Consents to Consents Approved |
| Braintree PRO-001042-1, PIVOTED POWER LLP | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Awaiting Consents to Consents Approved |
| Braintree PRO-001042-2, PIVOTED POWER LLP | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Worset PV & BESS Park PRO-001055, Worcestershire Solar 1 Limited | Hartmoor 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Deeside Power Station PRO-001062, DEESIDE POWER (UK) LIMITED | Connah's Quay 400kV Substation Energy Storage System;Reactive Compensation | Project Status changed from Consents Approved to Built |
| Pivot Power Harker Hybrid PRO-001065, PIVOTED POWER LLP | Harker 400/132KV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Consents Approved to Scoping |
| Kirkby PRO-001084-2, KIRKBY BATTERY STORAGE LTD | Kirkby 275/33kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Lister Battery (formerly Lister Drive) PRO-001088, LISTER BATTERY LTD | Lister Drive 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Bramley BESS PRO-001104-1, BRAMLEY BESS LIMITED | Bramley 400kV Substation Energy Storage System | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Bramley BESS PRO-001104-2, BRAMLEY BESS LIMITED | Bramley 400kV Substation Energy Storage System | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Keith 132 Greener Grid Park PRO-001129-2, KEITH STORAGE SOLUTIONS LIMITED | Keith 132kV Substation Energy Storage System;Reactive Compensation | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Sundon PRO-001132, SUNDON BATTERY STORAGE LIMITED | Sundon 400kV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Hunterston Battery Storage Facility PRO-001155, HUNTERSTON GRID 1 LTD | Hunterston East 400kV substation Energy Storage System;Reactive Compensation | Project Status changed from Scoping to Consents Approved |
| Wymondley PRO-001245, Priory Generation Limited | Wymondley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Awaiting Consents to Consents Approved |
| Bilbo Farm PRO-001301-1, LEL BILBO SOLAR LIMITED | Strichen 132/33kV GSP Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Under Construction/Commissioning |
| West Burton PRO-001323, ENSO GREEN HOLDINGS A LIMITED | West Burton 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Under Construction/Commissioning |
| Glen Ullinish Extension PRO-001346, GLEN ULLINISH WF 2 LTD | Glen Ullinish Extension 132/33kV Substation Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Drax PRO-001355, ENSO GREEN HOLDINGS D LIMITED | Drax 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Uskmouth - New Connection PRO-001357, AW1 ENERGY STORAGE LIMITED | Uskmouth 132kV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Neilston 400kV Greener Grid Park PRO-001419, Statkraft UK Ltd | Neilston 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Alcemi Devilla Battery Energy Storage Facility PRO-001453, ALCEMI STORAGE DEVELOPMENTS 3 LIMITED | Devilla Battery Storage 275kV substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Eccles BESS PRO-001470, Eccles Energy Centre Limited | Eccles 400kV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Pentland Floating Offshore Wind Farm PRO-001472, HIGHLAND WIND LIMITED | Pentland Floating Offshore Wind Farm 132/66kV substation Wind Offshore | Project Status changed from Scoping to Consents Approved |
| Rawhills Battery Energy Storage Facility(Coalburn 2) PRO-001503, ALCEMI STORAGE DEVELOPMENTS 6 LIMITED | Coalburn 400kV GIS Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| BOOM Power Llanbabo Generation PRO-001540, Carrog Storage Facility Limited | Wylfa 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Achany Extension Wind Farm PRO-001555, SSE GENERATION LIMITED | ACHANY EXTENSION WIND FARM 132/33KV Substation Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Botley West - Cote Solar Power Station PRO-001587, SOLARFIVE LTD | Farmoor 400kV Substation PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| One Earth Solar Farm PRO-001599, ONE EARTH SOLAR FARM LIMITED | High Marnham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Melksham PRO-001605, LIME DOWN SOLAR PARK LIMITED | Melksham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Chleansaid Wind Farm PRO-001608, ESB ASSET DEVELOPMENT UK LIMITED | Chleansaid Wind Farm 132kV Substation Wind Onshore | Project Status changed from Scoping to Consents Approved |
| Staythorpe (BESS and PV) PRO-001615, SSE STAYTHORPE POWER LIMITED | Staythorpe 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Awaiting Consents to Consents Approved |
| Thorpe Marsh Energy Park PRO-001620, THORPE MARSH GREEN ENERGY HUB LIMITED | Thorpe Marsh 400kV Substation Energy Storage System | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Hunterston Energy Storage Facility PRO-001644, HUNTERSTON GRID 1 LTD | Ayrshire Grid 400kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Kincardine Energy Storage Facility PRO-001653, KINCARDINE GRID 1 LTD | Fife Grid Services Facility 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Dalmarnock Road BESS PRO-001660, DALMARNOCK BESS LTD | DALMARNOCK 132/33KV SUBSTATION Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Exeter BESS PRO-001666-1, Exeter Storage Limited | Exeter 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Muir Mhor Offshore Wind Farm PRO-001698, MUIR MHÒR OFFSHORE WIND FARM LIMITED | Longside 400kV Substation Wind Offshore | Project Status changed from Scoping to Awaiting Consents |
| Elvanfoot (9.8 MW) Energy Storage PRO-001721, ELVANFOOT ENERGY STORAGE LIMITED | Elvanfoot 400/275/33kV Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Drum Farm Energy Storage Facility PRO-001726, Field Drum Farm Ltd | Keith 2 132/33kV GSP Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Keithick Estate PRO-001732, SIRIUS ECODEV (STIRLING) LTD | Coupar Angus 132/33kV GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Keith Battery Storage PRO-001742, Field Keith Ltd | Keith 1 132/33kV GSP Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Cairn Duhie Wind Farm PRO-001743, Cairn Duhie Energy Limited | Berryburn 275/33kV GSP Substation Wind Onshore | Project Status changed from Scoping to Consents Approved |
| SSE Fiddlers Ferry Battery Energy Storage PRO-001762, LITTLETON PASTURES SOLAR LIMITED | Fiddlers Ferry 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Zenobe Eccles Battery Storage PRO-001779, ZENOBE ECCLES LIMITED | Eccles 400kV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Zenobe Coalburn Battery Storage PRO-001780, Zenobe Coalburn Limited | Coalburn North 400kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Berkswell Energy Storage PRO-001788, BERKSWELL BATTERY STORAGE LIMITED | Berkswell 275kV Substation Energy Storage System | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Greta III PRO-001803, TAGENERGY DEVELOPMENT UK LIMITED | Drakelow 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Penwortham BESS PRO-001804, PENWORTHAM (BES) LTD | Penwortham 400kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Rochdale BESS PRO-001805, Rochdale (BES) Ltd | Rochdale 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Kilmarnock South Battery Storage PRO-001809, Kilmarnock Energy Centre Limited | Kilmarnock South 400kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Kirkton Wind Farm PRO-001811, Kirkton Wind Farm Limited | Connagill 275kV Substation Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Teindland Wind Farm PRO-001821, TEINDLAND WIND FARM LIMITED | Blackhillock substation Demand;Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Kilmarnock BESS PRO-001836, Kilmarnock Flexpower Ltd | Boydston 400kV substation Energy Storage System | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Montreathmont Moor Forest PRO-001849, Montreathmont Energy Centre Limited | Lunanhead GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Benthead Solar PRO-001881, BENTHEAD SOLAR LIMITED | Kilwinning 132/33kV Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Perwinnes PRO-001934, PERWINNES SOLAR AND BATTERY STORAGE LIMITED | Dyce 132/33kV GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Culham Storage PRO-001946, CULHAM STORAGE LIMITED | Culham Jet 400kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Balvedavist 162 Battery Storage PRO-002024, S4N SPITTAL LTD | Spittal 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Bowdun (ex Cluaran Deas Ear) Offshore Wind Farm PRO-002091, BOWDUN OFFSHORE WIND FARM LIMITED | Hurlie 400kV substation Wind Offshore | Project Status changed from Scoping to Awaiting Consents |
| Whitehill Battery Storage PRO-002093, Whitehill Battery Storage Ltd | Easterhouse 275kV Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Ayre (ex Cluaran Ear - Thuath) Offshore Wind Farm PRO-002100, AYRE OFFSHORE WIND FARM LIMITED | Banniskirk 400kV Substation Wind Offshore | Project Status changed from Scoping to Awaiting Consents |
| Bankside BESS PRO-002151, FALKIRK POWER LTD | Bainsford 132/33kV Energy Storage System | Project Status changed from Consents Approved to Under Construction/Commissioning |
| Lanarkshire BESS PRO-002183, CARLTON POWER LIMITED | Strathaven 400/275kV Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| Gresham House Cockenzie BESS PRO-002209, COCKENZIE STORAGE LIMITED | Meadowmill 400/132kV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Well Street Paisley PRO-002265, Gas Generation Property Limited | Elderslie 132/33kV Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Rothienorman 50MW BESS PRO-002300, ROTHIENORMAN FLEXPOWER LTD | Rothienorman 400/33kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Middleton BESS PRO-002305, Middleton Energy Storage Limited | Middleton 400KV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Corshellach Battery Energy Storage System PRO-002328, Corshellach Energy Storage Limited | Berryburn 275/33kV GSP Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Holdsworth Road PRO-002338, MAS 002 LIMITED | Bradford West 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Holmston Farm Battery Energy Storage System PRO-002359, Field Holmston Ltd | Ayr 275/33kV Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Flemyland Battery Storage PRO-002360, Flemyland Battery Storage Limited | Kilwinning 132/33kV Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Drumfad Battery Storage System PRO-002419, EKU ENERGY FAUNE PROJECTS (UK) LIMITED | Helensburgh 132/33kV Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Dolphingstone Farm PRO-002451, BSSL EAST LOTHIAN 1 LTD | Cockenzie 275/33kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Inchbean Energy Park PRO-002453, BROCKWELL STORAGE & SOLAR LIMITED | Kilmarnock Town 275/33kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Newarthill Energy Park PRO-002532, Dalzell (Newarthill) Ltd | Newarthill Energy Park 275kV Substation Energy Storage System | Project Status changed from Consents Approved to Scoping |
| Persley Croft BESS PRO-002546, Persley Croft BESS Ltd | Persley 132/33kV GSP Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Newlands Hill Wind Energy Hub PRO-002549, NEWLANDS HILL WIND ENERGY HUB LIMITED | Newlands Hill 132/33kV Energy Storage System;Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Loch Fearna Pumped Storage PRO-002569, FEARNA PSH LIMITED | Loch Fearna Pumped Storage 400/18kV Substation Pump Storage | Project Status changed from Scoping to Awaiting Consents |
| Smeaton BESS PRO-002635, KONA ASSET 3 LIMITED | Smeaton 400kV Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Bowsheil Solar and Battery PRO-002662, VOLTALIA UK LTD | Bowsheils 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| St Marys Isle Solar Farm PRO-002789, GRUPOTEC SOLAR UK 5 LIMITED | Tongland 132/11kV Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Saltcoats NEP BESS Facility PRO-002813, Rashley New Energy Limited | Saltcoats 132/33kV Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| Lovat Estate BESS PRO-003062, LG-B-50a Limited | Beauly 132/33 kV GSP Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Whitelaw Brae BESS PRO-003247, BUK23 LIMITED | Whitelaw Brae BESS 33kV substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Market Harborough PRO-003271, CONNECTID 1 LIMITED | West Anglia Connection Node F 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | Project Status changed from Scoping to Awaiting Consents |
| Yaxley PRO-003272, CONNECTID 2 LIMITED | North Anglia Connection Node E 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | Project Status changed from Scoping to Awaiting Consents |
| Scarning PRO-003275, CONNECTID 3 LIMITED | North Anglia Connection Node C 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | Project Status changed from Scoping to Awaiting Consents |
| Lisa's Battery Storage PRO-003280, POTENCIA ENERGY LIMITED | Mybster 3 132/33kV Substation Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| Kedrum Solar Farm PRO-003444, Rosside Energy Limited | Blackhillock 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Wymondley BESS Limited PRO-003496, AGR RENEWABLES LIMITED | Wymondley 400kV Substation Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| Lethans Wind Farm Extension PRO-003553, LETHANS EAST WIND FARM LIMITED | Lethans Collector 132kV Substation Wind Onshore | Project Status changed from Scoping to Consents Approved |
| Glennifer Road BESS PRO-003600, Drax BESS Neilston Limited | Glennifer Road BESS 132kV substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Lairdmannoch Energy Park PRO-003781, LAIRDMANNOCH ENERGY PARK LIMITED | Lairdmannoch Energy Park 132kV substation Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Don Cossack PRO-003875, Don Cossack Ltd | Tynemouth 275kV Substation Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| Fiddlers Ferry BESS PRO-003897-1, FIDDLERS FERRY LTD | Fiddlers Ferry 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Fiddlers Ferry BESS PRO-003897-2, FIDDLERS FERRY LTD | Fiddlers Ferry 275kV Substation Demand;Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Fiddlers Ferry BESS PRO-003897-3, FIDDLERS FERRY LTD | Fiddlers Ferry 275kV Substation Demand;Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Salters Battery Storage PRO-004150, BUCCLEUCH ESTATES, LTD. (THE) | Dalkeith 400kV Substation Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| Cockenzie BESS PRO-004217, COCKENZIE STORAGE B LTD | Meadowmill 400/132kV Substation Energy Storage System | Project Status changed from Scoping to Under Construction/Commissioning |
| Brunt Hill Wind Farm PRO-004322, Brunt Hill Limited | Westfield 132/33kV Energy Storage System;Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Fearna PSH 2 PRO-004391, FEARNA PSH LIMITED | Fearna Pump Storage Hydro 2 400/15kV Substation Pump Storage | Project Status changed from Scoping to Awaiting Consents |
| Drakelow Power Station 3 BESS PRO-004713, Bluestone Energy Ltd | ERBYSHIRE CONNECTION NODE E 132kV SUBSTATION Energy Storage System | Project Status changed from Under Construction/Commissioning to Scoping |
| Royle Farm BESS PRO-005050, ALUDRA BESS LTD | Drakelow 132kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Stella Battery Energy Storage PRO-005112, CAPELLA BESS LTD | Stella South GSP Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Ditcher Law PRO-006102, E Power Limited | Dunlaw Extension 132/33kV Energy Storage System;Wind Onshore | Project Status changed from Scoping to Awaiting Consents |
| Gate changed 103 | ||
| Cruachan U3&4 Replacement PRO-000113-2, DRAX PUMPED STORAGE LIMITED | Cruachan 275kV Substation Pump Storage | Gate changed from blank to 2 |
| Edinbane Windfarm PRO-000135-1, VATTENFALL WIND POWER LTD | Edinbane 132/33kV Substation Energy Storage System;Wind Onshore | Gate changed from blank to 1 |
| Edinbane Windfarm PRO-000135-2, VATTENFALL WIND POWER LTD | Edinbane 132/33kV Substation Energy Storage System;Wind Onshore | Gate changed from blank to 1 |
| Carrington PRO-000276, CARRINGTON STORAGE LIMITED | Carrington 400KV Substation Energy Storage System | Gate changed from blank to 2 |
| Fleet Tertiary PRO-000429, FLEET SOLAR LIMITED | Fleet 400kV Substation Thermal | Gate changed from blank to 1 |
| Enderby Tertiary PRO-000430, CLUMP FARM SOLAR LIMITED | Enderby 400kV Substation PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Loch Luichart Extension II PRO-000487, BLUEBELL WIND FARM LIMITED | Loch Luichart Extension II Substation Wind Onshore | Gate changed from blank to 1 |
| Iron Acton PRO-000491-2, IRON ACTON GREEN LIMITED | 132kV bay at Iron Acton Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Thurrock Power Station PRO-000494-2, THURROCK FLEXIBLE GENERATION LIMITED | Tilbury 275kV Substation Energy Storage System;Gas Reciprocating | Gate changed from blank to 2 |
| Limekiln PRO-000515-2, Limekiln Extension Limited | Limekilns 132/33kV substation Energy Storage System;Wind Onshore | Gate changed from blank to 1 |
| High Marnham (Tertiary) PRO-000531, ENSO GREEN HOLDINGS K LIMITED | High Marnham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| West Burton Solar Project PRO-000561, WEST BURTON SOLAR PROJECT LIMITED | West Burton 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Oaklands Farm Solar PV PRO-001004, OAKLANDS FARM SOLAR LIMITED. | Drakelow 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Bicker Fen 1 Solar PRO-001034-1, AGR SOLAR 2 LIMITED | Bicker Fen 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Braintree PRO-001042-1, PIVOTED POWER LLP | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Braintree PRO-001042-2, PIVOTED POWER LLP | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Deeside Power Station PRO-001062, DEESIDE POWER (UK) LIMITED | Connah's Quay 400kV Substation Energy Storage System;Reactive Compensation | Gate changed from blank to 2 |
| Kearsley PRO-001064, PIVOTED POWER LLP | Kearsley 275kV Substation Demand;Energy Storage System | Gate changed from blank to 1 |
| Sheirdrim Wind Farm PRO-001066, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Sheirdrim 132kV Substation Wind Onshore | Gate changed from blank to 1 |
| Kirkby PRO-001084-1, KIRKBY BATTERY STORAGE LTD | Kirkby 275/33kV Substation Energy Storage System | Gate changed from blank to 2 |
| Fleet (Tertiary) PRO-001087, CSE23 LIMITED | Fleet 400kV Substation PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Lister Battery (formerly Lister Drive) PRO-001088, LISTER BATTERY LTD | Lister Drive 275kV Substation Energy Storage System | Gate changed from blank to 2 |
| Bramley BESS PRO-001104-2, BRAMLEY BESS LIMITED | Bramley 400kV Substation Energy Storage System | Gate changed from 2 to blank |
| Wymondley Solar Farm PRO-001105, AGR SOLAR 4 LIMITED | Wymondley 400/33kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Warley PRO-001113, WARLEY BATTERY STORAGE LIMITED | Warley 275kV Substation Energy Storage System | Gate changed from blank to 2 |
| Sundon PRO-001132, SUNDON BATTERY STORAGE LIMITED | Sundon 400kV Substation Energy Storage System | Gate changed from blank to 2 |
| Iver PRO-001141, Juniper Energy Limited | Iver 275kV Substation Energy Storage System | Gate changed from blank to 1 |
| Wymondley PRO-001245, Priory Generation Limited | Wymondley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Uskmouth - New Connection PRO-001357, AW1 ENERGY STORAGE LIMITED | Uskmouth 132kV Substation Energy Storage System | Gate changed from blank to 2 |
| Indian Queens Energy Centre PRO-001371, IQ ENERGY CENTRE LIMITED | Indian Queens 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Cottam Solar PV + BESS PRO-001401, COTTAM SOLAR PROJECT LIMITED | Cottam 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Norton PV and BESS PRO-001437, Darlington Solar 1 Limited | Norton 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Pentland Floating Offshore Wind Farm PRO-001472, HIGHLAND WIND LIMITED | Pentland Floating Offshore Wind Farm 132/66kV substation Wind Offshore | Gate changed from blank to 2 |
| Tealing Solar & Storage PRO-001501, SIRIUS ECODEV (TEALING) LTD | Tealing IDNO 132/33kV GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Botley West - Cote Solar Power Station PRO-001587, SOLARFIVE LTD | Farmoor 400kV Substation PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Tarenni PRO-001641, TARENNI ENERGY PARK LIMITED | Rhigos 400kV Substation Wind Onshore | Gate changed from blank to 1 |
| Legacy Green Energy Centre PRO-001662-2, LEGACY GREEN ENERGY LIMITED | Legacy 400kV Substation Energy Storage System | Gate changed from blank to 1 |
| Exeter BESS PRO-001666-1, Exeter Storage Limited | Exeter 400kV Substation Energy Storage System | Gate changed from blank to 2 |
| SSE Fiddlers Ferry Battery Energy Storage PRO-001762, LITTLETON PASTURES SOLAR LIMITED | Fiddlers Ferry 275kV Substation Energy Storage System | Gate changed from blank to 2 |
| Kirkton Wind Farm PRO-001811, Kirkton Wind Farm Limited | Connagill 275kV Substation Wind Onshore | Gate changed from blank to 1 |
| Aberthaw PV & BESS Generation PRO-001815, REWE 12 Limited | Aberthaw 275kV Substation Energy Storage System | Gate changed from blank to 1 |
| High Marnham Solar Farm PRO-001845, ANESCO LIMITED | High Marnham 400kV Substation PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Montreathmont Moor Forest PRO-001849, Montreathmont Energy Centre Limited | Lunanhead GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Benthead Solar PRO-001881, BENTHEAD SOLAR LIMITED | Kilwinning 132/33kV Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Keithick 16 Solar & BESS PRO-001890, SIRIUS ECODEV (KEITHICK) LTD | Coupar Angus 132/33kV GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 2 |
| Maesnant Energy Park PRO-001919, Maesnant Energy Park Limited | Chirk GSP Wind Onshore | Gate changed from blank to 1 |
| BlaenCothi Energy Park PRO-001920, BLAENCOTHI ENERGY PARK LIMITED | Pont Abraham GSP Wind Onshore | Gate changed from blank to 1 |
| Culham Storage PRO-001946, CULHAM STORAGE LIMITED | Culham Jet 400kV Substation Energy Storage System | Gate changed from blank to 2 |
| Callisterhall Wind Farm PRO-001965, E Power Limited | Callisterhall 132kV Wind Onshore | Gate changed from blank to 1 |
| Breakish Windfarm PRO-002170-1, Asuk Holdco 2 Limited | Breakish 132kV Substation Wind Onshore | Gate changed from blank to 1 |
| Breakish Windfarm PRO-002170-2, Asuk Holdco 2 Limited | Breakish 132kV Substation Wind Onshore | Gate changed from blank to 1 |
| Feckenham PRO-002189, ENSO GREEN HOLDINGS X LIMITED | Feckenham 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Whitehouse BESS station PRO-002237, IGP INTERNATIONAL PROSPECTING LIMITED | Whitehouse 275kV Substation Demand;Energy Storage System | Gate changed from blank to 1 |
| Halbeath PRO-002266, HALBEATH SOLAR LTD | Halbeath 132kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | Gate changed from blank to 1 |
| Middleton BESS PRO-002305, Middleton Energy Storage Limited | Middleton 400KV Substation Energy Storage System | Gate changed from blank to 2 |
| Thurcroft BESS PRO-002313, HARMONY TC LIMITED | Thurcroft 275kV Substation Energy Storage System | Gate changed from blank to 1 |
| Llywelyn Extension Offshore Wind Farm PRO-002406, Renantis UK Limited | LLYWELYN EXTENSION OFFSHORE WIND FARM 66/275KV OFFSHORE SUBSTATION Wind Offshore | Gate changed from blank to 1 |
| Dougliehill BESS PRO-002411, Bluestone Energy Ltd | DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION Energy Storage System | Gate changed from blank to 1 |
| Elmya Melbourne BESS PRO-002424-1, ELMYA RPC UK MELBOURNE LIMITED | Thornton 400kV Substation Energy Storage System | Gate changed from blank to 1 |
| Elmya Melbourne BESS PRO-002424-2, ELMYA RPC UK MELBOURNE LIMITED | Thornton 400kV Substation Energy Storage System | Gate changed from blank to 1 |
| Grimsby BESS PRO-002633, Shama BESS Limited | Grimsby West 400kV Substation Energy Storage System | Gate changed from blank to 1 |
| Smeaton BESS PRO-002635, KONA ASSET 3 LIMITED | Smeaton 400kV Energy Storage System | Gate changed from blank to 2 |
| Pelham BESS PRO-002645, PELHAM ENERGY PARK LIMITED | PELHAM 2 400KV SUBSTATION Energy Storage System | Gate changed from blank to 1 |
| Lyndhurst Camperdown BESS PRO-002658, Geocore Ltd | Charleston GSP 132/33kV Energy Storage System | Gate changed from blank to 1 |
| Penn Battery Storage PRO-002696, ANGLO ENERGY STORAGE LTD | Penn 275kV Substation Energy Storage System | Gate changed from blank to 1 |
| AGS Calderside Battery Energy Storage System PRO-002752-2, Advance Grid Solutions Limited | AGS CALDERSIDE 275KV SUBSTATION Energy Storage System | Gate changed from blank to 1 |
| Merthyr Solar and Battery PRO-002757-1, EEW RENEWABLES LTD | Cilfynydd 400kV Substation PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Merthyr Solar and Battery PRO-002757-2, EEW RENEWABLES LTD | Cilfynydd 400kV Substation PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Gresham House Dalmarnock BESS PRO-002809, ENERGYHUBDEVELOPMENTS LIMITED | Gresham House Dalmarnock Bess 132kv Substation Energy Storage System | Gate changed from blank to 1 |
| Craighead Wind Farm PRO-002821, GALILEO 02 LIMITED | CRAIGHEAD WIND FARM 132kV SUBSTATION Wind Onshore | Gate changed from blank to 1 |
| Akku Tealing Battery Storage PRO-003092, Akku Tealing Limited | Tealing 275/33kV Substation Energy Storage System | Gate changed from blank to 1 |
| Solomons Farm BESS PRO-003181, Solomons BESS Ltd | North Kent Connection Node B 132kV Substation Energy Storage System | Gate changed from blank to 1 |
| Nether Pitforthie BESS PRO-003226, Opdenergy UK 14 Limited | FIDDES 275/33KV GRID SUPPLY POINT SUBSTATION Energy Storage System | Gate changed from blank to 1 |
| Amersham Main PRO-003404, Amersham 10 Renewables Limited | London North West Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Braintree PRO-003406, Braintree 10 Renewables Limited | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Berwick Solar Wind and Battery Storage PRO-003490, BERWICK RENEWABLES TX LIMITED | Berwick 132/33kV Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | Gate changed from blank to 1 |
| Ashbrook Lane BESS PRO-003534, Downing Renewable Developments LLP | WEST ANGLIA CONNECTION NODE B 400KV SUBSTATION Energy Storage System | Gate changed from blank to 1 |
| Gastard BESS PRO-003552, SIRIUSECODEV (GASTARD) LTD | Melksham B 132KV Substation Energy Storage System | Gate changed from blank to 1 |
| EcoKincardine PRO-003557, Econergy International Limited | Kincardine North 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Market Harborough Green Energy Hub PRO-003623, TELIS ENERGY UK LIMITED | West Anglia Connection Node F 400kV Substation Energy Storage System;Hydro;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | Gate changed from blank to 1 |
| Daventry High Impact Green Energy Hub (HIGEH) 1 PRO-003686, TELIS ENERGY UK LIMITED | Derbyshire Connection Node A 400kV Substation Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | Gate changed from blank to 1 |
| Kellwood Road BESS PRO-003710, Geocore (Kellwood) Ltd | Dumfries 132/33kV Energy Storage System | Gate changed from blank to 2 |
| Beauly 02 BESS PRO-003731, FIELD BEAULY LTD | BEAULY 02 BESS 132kV SUBSTATION Energy Storage System | Gate changed from blank to 1 |
| Morton Manor PV & BESS Station PRO-003827, IB VOGT UK LTD | High Marnham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Lightsource Enderby PV+BESS PRO-003854, Lightsource Renewable UK Development Limited | Derbyshire Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Wakeleys BESS PRO-003921, EPL NEWCO6 LIMITED | Wakeleys 400kV Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Wymondley GEC (Ethos Green) PRO-003934, WYMONDLEY GREEN ENERGY CENTRE LTD | Wymondley 2 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Equinor Celtic Sea 2 PRO-004038, EQUINOR NEW ENERGY LIMITED | EQUINOR 66KV OFFSHORE SUBSTATION Wind Offshore | Gate changed from 1 to blank |
| Devol Moor Battery & Solar Project PRO-004084, Sunshine Project 03 Limited | Devol Moor 400/132kV Energy Storage System | Gate changed from blank to 1 |
| AGS Nerston BESS PRO-004216, Advance Grid Solutions Limited | East Kilbride B 275/33kV Substation Energy Storage System | Gate changed from blank to 1 |
| NatPower Penrith Green Energy Park PRO-004278, LEITH ENERGY LIMITED | Lancashire Connection Node B 400kV Substation Energy Storage System | Gate changed from blank to 1 |
| West Weybridge PRO-004324, EL (WEST WEYBRIDGE) LIMITED | West Weybridge 275kV Substation Energy Storage System | Gate changed from blank to 2 |
| Hockliffe GEC (Ethos Green) PRO-004342, HOCKLIFFE GREEN ENERGY CENTRE LTD | Dunstable 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Lambeeth 240MW PRO-004361, ECODEV GROUP LTD | Pembroke 400kV Substation Energy Storage System | Gate changed from blank to 1 |
| Dunan Hill PRO-004433, PERIGUS ENERGY UK LIMITED | Dunan Hill 400kV substation Energy Storage System;Wind Onshore | Gate changed from blank to 1 |
| Glen Lednock PRO-004520, Glen Lednock Wind Farm Limited | Glen Lednock 132kV Substation Energy Storage System;Wind Onshore | Gate changed from blank to 1 |
| AGS Coatbridge PRO-004544, Advance Grid Solutions Limited | Coatbridge GSP Energy Storage System | Gate changed from blank to 1 |
| Church Road Farm PRO-005074, QAIR RENEWABLES UK LIMITED | South Anglia Connection Node D 132kV Substation Energy Storage System | Gate changed from blank to 1 |
| Stella Battery Energy Storage PRO-005112, CAPELLA BESS LTD | Stella South GSP Energy Storage System | Gate changed from blank to 2 |
| Leuchland Energy Centre A PRO-005765, LEUCHLAND ENERGY CENTRE LIMITED | Leuchland Farm IDNO Energy Storage System;PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
| Melvich Wind Energy Hub (BEGA) PRO-006005, Melvich Wind Energy Hub Limited | Dounreay 2 275/33kV GSP Substation Energy Storage System;Wind Onshore | Gate changed from blank to 1 |
| Galileo 14 Ltd PRO-006019, GALILEO 14 LIMITED | Staffordshire Connection Node C 400Kv Substation Energy Storage System | Gate changed from blank to 1 |
| Crookedstone PV PRO-006119, Enviromena Project Management UK Limited | Strathaven GSP 33kV PV Array (Photo Voltaic/solar) | Gate changed from blank to 1 |
By plant type
| Plant type | Projects with a change | New | Back on the register | Removed | Net capacity change |
|---|---|---|---|---|---|
| Energy Storage System | 147 | 4 | 9 | 0 | +105.3 MW |
| Energy Storage System;PV Array (Photo Voltaic/solar) | 82 | 0 | 15 | 1 | −90 MW |
| Wind Onshore | 40 | 0 | 1 | 2 | −117.9 MW |
| Wind Offshore | 15 | 2 | 0 | 1 | +400 MW |
| Energy Storage System;Wind Onshore | 11 | 0 | 0 | 0 | 0 MW |
| PV Array (Photo Voltaic/solar) | 9 | 0 | 0 | 0 | 0 MW |
| Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | 8 | 0 | 0 | 1 | −625 MW |
| Demand;Energy Storage System | 6 | 0 | 0 | 0 | 0 MW |
| CCGT (Combined Cycle Gas Turbine) | 5 | 0 | 0 | 0 | 0 MW |
| Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | 4 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;Gas Reciprocating | 4 | 0 | 2 | 1 | −1,318 MW |
| Oil & AGT (Advanced Gas Turbine) | 4 | 4 | 0 | 0 | +22 MW |
| Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | 3 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | 3 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;Reactive Compensation | 3 | 0 | 0 | 0 | 0 MW |
| Pump Storage | 3 | 0 | 0 | 0 | 0 MW |
| Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | 1 | 0 | 0 | 0 | 0 MW |
| Demand;LAES (Liquid Air Energy Storage) | 1 | 0 | 0 | 0 | 0 MW |
| Demand;PV Array (Photo Voltaic/solar) | 1 | 0 | 0 | 0 | 0 MW |
| Demand;Wind Onshore | 1 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;Hydro;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | 1 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore | 1 | 0 | 0 | 0 | 0 MW |
| Nuclear | 1 | 0 | 0 | 1 | 0 MW |
| Thermal | 1 | 0 | 0 | 0 | 0 MW |
| Waste | 1 | 0 | 0 | 0 | 0 MW |
Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.
By connection site
| Connection site | Projects with a change | New | Back on the register | Removed | Net capacity change |
|---|---|---|---|---|---|
| Braintree 400kV Substation | 5 | 0 | 2 | 0 | 0 MW |
| High Marnham 400kV Substation | 5 | 0 | 0 | 0 | 0 MW |
| Cilfynydd 400kV Substation | 4 | 0 | 0 | 0 | 0 MW |
| Fiddlers Ferry 275kV Substation | 4 | 0 | 0 | 0 | 0 MW |
| Alverdiscott 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| Bramley 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| Dunstable 400kV Substation | 3 | 0 | 2 | 0 | 0 MW |
| Grimsby West 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| Humber Refinery 400kV Substation | 3 | 0 | 2 | 1 | −1,318 MW |
| Necton 400kV Substation | 3 | 2 | 0 | 1 | +400 MW |
| Pembroke 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| Strathy Wood 132/33kV Substation | 3 | 0 | 1 | 2 | −117.9 MW |
| Willington 400kV Substation | 3 | 0 | 0 | 1 | −625 MW |
| BEARSDEN BESS 275KV SUBSTATION | 2 | 0 | 2 | 0 | 0 MW |
| Berryburn 275/33kV GSP Substation | 2 | 0 | 0 | 0 | 0 MW |
| Bicker Fen 400kV Substation | 2 | 0 | 0 | 0 | 0 MW |
| Breakish 132kV Substation | 2 | 0 | 0 | 0 | 0 MW |
| Cheshire Connection Node A 400kV Substation | 2 | 0 | 0 | 0 | 0 MW |
| Chirk GSP | 2 | 0 | 0 | 0 | 0 MW |
| Coupar Angus 132/33kV GSP | 2 | 0 | 0 | 0 | 0 MW |
| Drakelow 132kV Substation | 2 | 0 | 0 | 0 | 0 MW |
| Dun Hill 132/33kV | 2 | 0 | 0 | 0 | 0 MW |
| Earl Shilton 400kV Substation | 2 | 0 | 2 | 0 | 0 MW |
| Eccles 400kV Substation | 2 | 0 | 0 | 0 | 0 MW |
| Edinbane 132/33kV Substation | 2 | 0 | 0 | 0 | 0 MW |
Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 290.
Earlier comparisons
Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.