N84 Grid

Dersalloch Wind Farm Extension

Developer as published, connection site, reference: SCOTTISHPOWER RENEWABLES (UK) LIMITED. Dersalloch 132/33kV (SPT). PRO-000412.

Sign in to watch this project
Capacity11 MWBattery storage
Connection date31 Oct 2027Status as printed: Scoping
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20272028File dated 2026-03-27: connection date 2027-10-31Oct 2027File dated 2026-10-20: connection date 2027-10-3127 Mar202620 Oct2026
20272028File dated 2026-03-27: connection date 2027-10-31Oct 2027File dated 2026-10-20: connection date 2027-10-3127 Mar202620 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 27 Mar 2026 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Technology printed as Energy Storage System (previous file: Energy Storage System; Wind Onshore). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedEnergy Storage System; Wind Onshore → Energy Storage SystemReceipt: NESO TEC Register, file dated 20 Oct 2026, row 570Receipt: NESO TEC Register, file dated 11 Sep 2026, row 561
  2. 20 Oct 2026. Project Status printed as Scoping (previous file: Consents Approved). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedConsents Approved → ScopingReceipt: NESO TEC Register, file dated 20 Oct 2026, row 570Receipt: NESO TEC Register, file dated 11 Sep 2026, row 561
  3. 20 Oct 2026. Connected capacity printed as 0 (previous file: 69). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was imported69 → 0Receipt: NESO TEC Register, file dated 20 Oct 2026, row 570Receipt: NESO TEC Register, file dated 11 Sep 2026, row 561
  4. 20 Oct 2026. Export capacity printed as 11 MW (previous file: 85 MW), −74 MW. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was imported85 → 11Receipt: NESO TEC Register, file dated 20 Oct 2026, row 570Receipt: NESO TEC Register, file dated 11 Sep 2026, row 561

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.