Fearna PSH 2

Developer as published, connection site, reference: FEARNA PSH LIMITED. Fearna Pump Storage Hydro 2 400/15kV Substation (SHET). PRO-004391.

Sign in to watch this project
Capacity1,495 MWHydro and pumped storage
Connection date11 Nov 2036Status as printed: Awaiting Consents
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20362037File dated 2024-05-31: connection date 2036-11-11Nov 2036File dated 2026-10-20: connection date 2036-11-1131 May202420 Oct2026
20362037File dated 2024-05-31: connection date 2036-11-11Nov 2036File dated 2026-10-20: connection date 2036-11-1131 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Project Status printed as Awaiting Consents (previous file: Scoping). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedScoping → Awaiting ConsentsReceipt: NESO TEC Register, file dated 20 Oct 2026, row 781Receipt: NESO TEC Register, file dated 11 Sep 2026, row 760

Supported by National Energy SO Open Data