Rowancraig Wind Farm (Koehler Renewable Energy UK Limited)

Developer as published, connection site, reference: Koehler Renewable Energy UK Limited. ROWANCRAIG WIND FARM 33KV SUBSTATION (SPT). PRO-002455.

Sign in to watch this project
Capacity40 MWOnshore wind, Gate 1
Connection date31 May 2030Status as printed: Scoping
First date seen 30 Oct 2028, difference +578 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

2028202920302031File dated 2026-09-11: connection date 2028-10-30Oct 2028File dated 2026-10-20: connection date 2030-05-31May 203011 Sep202620 Oct2026
2028202920302031File dated 2026-09-11: connection date 2028-10-30Oct 2028File dated 2026-10-20: connection date 2030-05-31May 203011 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. MW Effective From printed as 31 May 2030 (previous file: 30 Oct 2028), 578 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +578 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1779Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1753

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.