Tealing Solar & Storage

Developer as published, connection site, reference: SIRIUS ECODEV (TEALING) LTD. Tealing IDNO 132/33kV GSP (SHET). PRO-001501.

Sign in to watch this project
Capacity80 MWHybrid, Gate 2
Connection date31 Oct 2028Status as printed: Awaiting Consents
First date seen 31 Oct 2026, difference +731 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

202720282029File dated 2026-09-11: connection date 2027-10-31Oct 2027File dated 2026-10-20: connection date 2028-10-31Oct 202811 Sep202620 Oct2026
202720282029File dated 2026-09-11: connection date 2027-10-31Oct 2027File dated 2026-10-20: connection date 2028-10-31Oct 202811 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 2 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 2Receipt: NESO TEC Register, file dated 20 Oct 2026, row 1985Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1957
  2. 20 Oct 2026. MW Effective From printed as 31 Oct 2028 (previous file: 31 Oct 2027), 366 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +366 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1985Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1957