Stoke Bardolph 400 (ENSO GREEN HOLDINGS LIMITED)

Developer as published, connection site, reference: ENSO GREEN HOLDINGS LIMITED. Stoke Bardolph 400kV Substation (NGET). PRO-002191.

Sign in to watch this project
Capacity400 MWHybrid, Gate 1
Connection date31 Oct 2034Status as printed: Scoping
First date seen 31 Oct 2030, difference +1461 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

203020322034File dated 2026-09-11: connection date 2030-10-31Oct 2030File dated 2026-10-20: connection date 2034-10-31Oct 203411 Sep202620 Oct2026
203020322034File dated 2026-09-11: connection date 2030-10-31Oct 2030File dated 2026-10-20: connection date 2034-10-31Oct 203411 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. MW Effective From printed as 31 Oct 2034 (previous file: 31 Oct 2032), 730 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +730 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1929Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1902
  2. 20 Oct 2026. MW Effective From printed as 31 Oct 2031 (previous file: 31 Oct 2030), 365 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +365 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1927Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1900

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.