Fleet Tertiary

Developer as published, connection site, reference: FLEET SOLAR LIMITED. Fleet 400kV Substation (NGET). PRO-000429.

Sign in to watch this project
Capacity47.5 MWThermal, Gate 1
Connection date7 Aug 2028Status as printed: Scoping
First date seen 30 Nov 2025, difference +981 dayscalculated by N84
MW ahead in N84's order at this site95 MWcalculated by N84

Connection date, edition by edition

20282029File dated 2024-05-31: connection date 2028-08-07Aug 2028File dated 2026-10-20: connection date 2028-08-0731 May202420 Oct2026
20282029File dated 2024-05-31: connection date 2028-08-07Aug 2028File dated 2026-10-20: connection date 2028-08-0731 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 820Receipt: NESO TEC Register, file dated 11 Sep 2026, row 799