Queue movers: the TEC Register, edition by edition

What changed between consecutive editions of NESO's Transmission Entry Capacity (TEC) Register, as printed. Supported by National Energy SO Open Data.

File dated 8 Sep 2026compared withFile dated 11 Sep 2026How the files are matchedThe file dated 8 Sep 2026 is an archived copy (Internet Archive), not a file N84 collected from NESO.

Changes between the two files

9 changesacross 9 projects. Net change −3.89 GW (new, left the register and capacity changes), plus 212 MW back on the register after being absent from the archived copy dated 8 Sep 2026 (Internet Archive).
Rows matched on Project Number. "Back on the register": absent from the previous file N84 holds, printed again in this one. Net change calculated by N84 from Cumulative Total Capacity as printed. NESO TEC Register, files dated 8 Sep 2026 and 11 Sep 2026. Supported by National Energy SO Open Data.
Table view
Changes by type
TypeChanges
Status, stage or gate changed4
Left the register4
Back on the register1

Capacity in and out

TEC file dated 11 Sep 2026 against 8 Sep 2026 (archived copy)

New: 0 MW0 MWNewCapacity up: 0 MW0 MWCapacity upCapacity down: 0 MW0 MWCapacity downRemoved: −3.9 GW−3.9 GWRemovedNet: 3.9 GW3.9 GWNet
New: 0 MW0 MWNewCapacity up: 0 MW0 MWCapacityupCapacity down: 0 MW0 MWCapacitydownRemoved: −3.9 GW−3.9 GWRemovedNet: 3.9 GW3.9 GWNet

Not in the chart: 212 MW across 1 project back on the register, absent from the archived copy dated 8 Sep 2026 (Internet Archive) and printed again in the file dated 11 Sep 2026. See them

NESO TEC Register, files dated 8 Sep 2026 and 11 Sep 2026. Supported by National Energy SO Open Data. Capacity is Cumulative Total Capacity as printed.
Table view
Capacity in and out
StepMW
New0
Capacity up0
Capacity down0
Removed−3,891
Net3,891
Back on the register (not in the net)212

Data centres in the pipeline

30 sites

Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.

See every site

Every change, in full

Every change between the two files, grouped by type
ProjectConnection siteWhat the files print
Back on the register 1
North Kyle New Cumnock
PRO-000474, NORTH KYLE WIND FARM LIMITED
North Kyle 132/33kV substation
Wind Onshore
Absent from the file dated 8 Sep 2026 (archived copy); printed again with 212 MW in the file dated 11 Sep 2026. Last printed before that in the file dated 17 Apr 2026
Removed from the register 4
North Kyle New Cumnock
PRO-000474-1, NORTH KYLE WIND FARM LIMITED
North Kyle 132/33kV substation
Wind Onshore
Printed with 79 MW in the file dated 8 Sep 2026; not in the file dated 11 Sep 2026
North Kyle New Cumnock
PRO-000474-2, NORTH KYLE WIND FARM LIMITED
North Kyle 132/33kV substation
Wind Offshore
Printed with 212 MW in the file dated 8 Sep 2026; not in the file dated 11 Sep 2026
Alverdiscott
PRO-001344, XLINKS 1 LTD
Alverdiscott 400kV Substation
Interconnector
Printed with 1,800 MW in the file dated 8 Sep 2026; not in the file dated 11 Sep 2026
Alverdiscott 2
PRO-001345, XLINKS 1 LTD
Alverdiscott 400kV Substation
Interconnector
Printed with 1,800 MW in the file dated 8 Sep 2026; not in the file dated 11 Sep 2026
Gate changed 4
Cleveden Road BESS
PRO-003174, Vital Energi Solutions Limited
Killermont GSP
Energy Storage System
Gate changed from blank to 1
SEC 1 BESS
PRO-003198, Bluestone Energy Ltd
Finnieston GSP
Energy Storage System
Gate changed from blank to 1
Coldstream Solar PV Plant
PRO-003635, Conrad Energy (Developments) II Limited
Eccles GSP
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
South Street BESS
PRO-004924, South Street BESS Limited
Partrick GSP
Energy Storage System
Gate changed from blank to 1

By plant type

Plant typeProjects with a changeNewBack on the registerRemovedNet capacity change
Energy Storage System30000 MW
Interconnector2002−3,600 MW
Wind Onshore2011−79 MW
PV Array (Photo Voltaic/solar)10000 MW
Wind Offshore1001−212 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.

By connection site

Connection siteProjects with a changeNewBack on the registerRemovedNet capacity change
North Kyle 132/33kV substation3012−291 MW
Alverdiscott 400kV Substation2002−3,600 MW
Eccles GSP10000 MW
Finnieston GSP10000 MW
Killermont GSP10000 MW
Partrick GSP10000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.

Earlier comparisons

Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.