Queue movers: the TEC Register, edition by edition

What changed between consecutive editions of NESO's Transmission Entry Capacity (TEC) Register, as printed. Supported by National Energy SO Open Data.

File dated 20 Dec 2024compared withFile dated 21 Mar 2025How the files are matchedThe file dated 20 Dec 2024 is an archived copy (Internet Archive), not a file N84 collected from NESO.

N84 holds no copy between 20 Dec 2024 and 21 Mar 2025; each change below happened at some point in that time, not necessarily this week. Wide comparisons

Changes between the two files

1,792 changesacross 1,765 projects. Net change +21.89 GW (new, left the register and capacity changes), plus 1.14 GW back on the register after being absent from the archived copies dated 27 Sep 2024 and 20 Dec 2024 (Internet Archive).
Rows matched on Project Number. "Back on the register": absent from the previous file N84 holds, printed again in this one. Net change calculated by N84 from Cumulative Total Capacity as printed. NESO TEC Register, files dated 20 Dec 2024 and 21 Mar 2025. Supported by National Energy SO Open Data.
Table view
Changes by type
TypeChanges
Connection date added or removed1631
New on the register91
Left the register33
Capacity changed17
Status, stage or gate changed14
Back on the register6

Capacity in and out

TEC file dated 21 Mar 2025 against 20 Dec 2024 (archived copy)

New: +32.6 GW+32.6 GWNewCapacity up: +1.3 GW+1.3 GWCapacity upCapacity down: −2.2 GW−2.2 GWCapacity downRemoved: −9.8 GW−9.8 GWRemovedNet: 21.9 GW21.9 GWNet
New: +32.6 GW+32.6 GWNewCapacity up: +1.3 GW+1.3 GWCapacityupCapacity down: −2.2 GW−2.2 GWCapacitydownRemoved: −9.8 GW−9.8 GWRemovedNet: 21.9 GW21.9 GWNet

Not in the chart: 1.14 GW across 6 projects back on the register, absent from the archived copies dated 27 Sep 2024 and 20 Dec 2024 (Internet Archive) and printed again in the file dated 21 Mar 2025. See them

NESO TEC Register, files dated 20 Dec 2024 and 21 Mar 2025. Supported by National Energy SO Open Data. Capacity is Cumulative Total Capacity as printed.
Table view
Capacity in and out
StepMW
New+32,640.1
Capacity up+1,296.1
Capacity down−2,245.6
Removed−9,803.7
Net21,886.9
Back on the register (not in the net)1,135.5

Data centres in the pipeline

30 sites

Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.

See every site

Every change, in full

Every change between the two files, grouped by type
ProjectConnection siteWhat the files print
New on the register 91
Immingham
PRO-000053-1, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,268 MW in the file dated 21 Mar 2025
Immingham
PRO-000053-2, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,318 MW in the file dated 21 Mar 2025
Eggborough CCGT and BESS
PRO-000136-1, EGGBOROUGH POWER LIMITED
Eggborough 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,999 MW in the file dated 21 Mar 2025
Eggborough CCGT and BESS
PRO-000136-2, EGGBOROUGH POWER LIMITED
Eggborough 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 2,450 MW in the file dated 21 Mar 2025
JG Pears
PRO-000250-3, JG PEARS GRID CONNECTION LIMITED
High Marnham 275kV Substation
CHP (Combined Heat and Power);Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 450 MW in the file dated 21 Mar 2025
Port of Mostyn
PRO-000421-1, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 70 MW in the file dated 21 Mar 2025
Port of Mostyn
PRO-000421-2, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 210 MW in the file dated 21 Mar 2025
Port of Mostyn
PRO-000421-3, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 420 MW in the file dated 21 Mar 2025
North Kyle New Cumnock
PRO-000474-1, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 79 MW in the file dated 21 Mar 2025
North Kyle New Cumnock
PRO-000474-2, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 212 MW in the file dated 21 Mar 2025
Thurrock Power Station
PRO-000494-1, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 21 Mar 2025
Thurrock Power Station
PRO-000494-2, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 750 MW in the file dated 21 Mar 2025
Exeter (Tertiary)
PRO-001047-1, PIVOTED POWER LLP
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 21 Mar 2025
Exeter (Tertiary)
PRO-001047-2, PIVOTED POWER LLP
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 57 MW in the file dated 21 Mar 2025
Green Volt Offshore Windfarm
PRO-001469-1, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 21 Mar 2025
Green Volt Offshore Windfarm
PRO-001469-2, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 560 MW in the file dated 21 Mar 2025
Amersham
PRO-001770, ENSO GREEN HOLDINGS Z LIMITED
Amersham Main 132kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 120 MW in the file dated 21 Mar 2025
Old Flatts Farm
PRO-001894-1, Net Zero One Limited
Brinsworth 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 750 MW in the file dated 21 Mar 2025
Old Flatts Farm
PRO-001894-2, Net Zero One Limited
Brinsworth 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,500 MW in the file dated 21 Mar 2025
Leithenwater Wind Farm
PRO-001914, LEITHENWATER WIND ENERGY HUB LIMITED
Galashiels 132/33kV
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 72.6 MW in the file dated 21 Mar 2025
Stalybridge BESS
PRO-002036, CSE32 LIMITED
Stalybridge 275kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 57 MW in the file dated 21 Mar 2025
Scottish Water Bonnybridge STW 60MW BESS
PRO-002410, Bluestone Energy Ltd
Bonnybridge 275/33kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 60 MW in the file dated 21 Mar 2025
Appin Wind Farm
PRO-002661, Appin Wind Farm Limited
Glenglass 132kV Substation
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 66 MW in the file dated 21 Mar 2025
Norton GSP
PRO-002964, NORTHERN POWERGRID (NORTHEAST) PLC
Norton GSP
Energy Storage System;PV Array (Photo Voltaic/solar);Waste
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 312.3 MW in the file dated 21 Mar 2025
Keadby GSP
PRO-002975, NORTHERN POWERGRID (YORKSHIRE) PLC
Keadby GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 20 MW in the file dated 21 Mar 2025
Skelton Grange GSP
PRO-002980, NORTHERN POWERGRID (YORKSHIRE) PLC
Skelton Grange GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 381.7 MW in the file dated 21 Mar 2025
Myreton BESS
PRO-003050, GPC 1039 Ltd
Tealing 132kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 21 Mar 2025
Worksop BESS
PRO-003657, ARM Cedar Limited
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 480 MW in the file dated 21 Mar 2025
Crakaig Wind Energy Hub
PRO-003734, CRAKAIG WIND ENERGY HUB LIMITED
Brora GSP
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 60 MW in the file dated 21 Mar 2025
Rat Hall Mod App
PRO-003824-1, Downing Renewable Developments LLP
Burwell South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 21 Mar 2025
Rat Hall Mod App
PRO-003824-2, Downing Renewable Developments LLP
Burwell South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 700 MW in the file dated 21 Mar 2025
Hunterston Hydrogen
PRO-003957, STATKRAFT HYDROGEN UK HOLDING LIMITED
Hunterston 400/132kV
Hydrogen
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 5 MW in the file dated 21 Mar 2025
Millennium East
PRO-004010, Nadara Limited
Fort Augustus GSP/New Fort Augustus GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 21 Mar 2025
Creag Dhubh
PRO-004206, MUIRDEN ENERGY LLP
Clachan 2 GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 38.34 MW in the file dated 21 Mar 2025
Barry Road Storage
PRO-004261, BSR APPLICATIONS LIMITED
Severn Connection Node A 132kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 110 MW in the file dated 21 Mar 2025
Woodlands Farm BESS
PRO-004270, SKY UK DEVELOPMENT LIMITED
Canterbury North GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 227.5 MW in the file dated 21 Mar 2025
West Botley High Impact Green Energy Hub
PRO-004435, TELIS ENERGY UK LIMITED
Botley West 400kV Substation
Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 100 MW in the file dated 21 Mar 2025
Wacton Road Farm
PRO-004440, QAIR RENEWABLES UK LIMITED
North Anglia Connection Node A 132kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 21 Mar 2025
Wymondham Road Farm
PRO-004441, QAIR RENEWABLES UK LIMITED
Norwich GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 228 MW in the file dated 21 Mar 2025
Glenmore
PRO-004445, AEUK WIND PROJECT II LTD
Edinbane 132/33kV Substation
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 39.6 MW in the file dated 21 Mar 2025
Butt Lane - Grimsby BESS
PRO-004491, Bluestone Energy Ltd
Grimsby West GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 21 Mar 2025
Spalding High Impact Energy Hub
PRO-004517, TELIS ENERGY UK LIMITED
West Anglia Connection Node G 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 21 Mar 2025
Bexley GEC - Hurst Grid Park 2
PRO-004546, BEXLEY GREEN ENERGY CENTRE LTD
Hurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 228 MW in the file dated 21 Mar 2025
Strath Oykel Wind Farm
PRO-004565, ENERGYFARM STRATH OYKEL LLP
Shin GSP
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 74 MW in the file dated 21 Mar 2025
SAVE OUR PLANET
PRO-004613, SAVE OUR PLANET ENERGY LIMITED
DRAGON GREEN 400kV SUBSTATION
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 21 Mar 2025
Brae WF
PRO-004633, WIND 2 LIMITED
Linnmill GSP
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 20 MW in the file dated 21 Mar 2025
Garlogie A-1
PRO-004636, GARLOGIE ENERGY CENTRE LIMITED
Garlogie Production A 275/33kV GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Garlogie A-2
PRO-004637, GARLOGIE ENERGY CENTRE LIMITED
Garlogie Production A 275/33kV GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Garlogie B-1
PRO-004640, GARLOGIE ENERGY CENTRE LIMITED
Garlogie Production B 275/33kV GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Garlogie B-2
PRO-004641, GARLOGIE ENERGY CENTRE LIMITED
Garlogie Production B 275/33kV GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Garlogie C-1
PRO-004642, GARLOGIE ENERGY CENTRE LIMITED
Garlogie Production C 275/33kV GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Garlogie C-2
PRO-004643, GARLOGIE ENERGY CENTRE LIMITED
Garlogie Production C 275/33kV GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
UK105-B Upland Arms
PRO-004649, URUK BESS LIMITED
Llandyfaelog 400/132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 21 Mar 2025
Bute Hydrogen Project 7.1
PRO-004666, Bute Hydrogen Project 7 Limited
Solent Connection Node C 400kV
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 2,400 MW in the file dated 21 Mar 2025
Crossgatehall BESS
PRO-004668, DE 001 LIMITED
Smeaton 400/275kV
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 21 Mar 2025
Kingsfold
PRO-004710, GREENTECH PROJECTS HOLDING UK LIMITED
Bolney GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 21 Mar 2025
Drakelow Power Station 3 BESS
PRO-004713, Bluestone Energy Ltd
Drakelow GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 21 Mar 2025
Project Flora Peterhead
PRO-004741, BP NORTH EAST OFFSHORE WIND LIMITED
Peterhead Grange GSP
Wind Offshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Claydon Solar B (A033)
PRO-004759, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
Port Ham GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 45 MW in the file dated 21 Mar 2025
Novar 2 Wind Farm
PRO-004775, HEADWIND DEVELOPMENT SERVICES LIMITED
Alness GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 43.2 MW in the file dated 21 Mar 2025
Causeymire 2 Wind Farm
PRO-004778, HEADWIND DEVELOPMENT SERVICES LIMITED
Mybster 4 GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 39.6 MW in the file dated 21 Mar 2025
Wick Moor Drove
PRO-004788, BSR APPLICATIONS LIMITED
West Country Connection Node D 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 21 Mar 2025
New Marton GEC
PRO-004796, NEW MARTON GREEN ENERGY CENTRE LIMITED
New Marton 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 550 MW in the file dated 21 Mar 2025
Galileo 09
PRO-004798, GALILEO 09 LIMITED
Oswestry Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 297 MW in the file dated 21 Mar 2025
Lightsource Jubilee Farm
PRO-004815, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Jubilee Farm 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 21 Mar 2025
Lightsource New Eggborough
PRO-004821, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Leeds North Connection Node B 400kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 21 Mar 2025
Statkraft SEWF
PRO-004828, STATKRAFT UK LTD
Orrin GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 100.8 MW in the file dated 21 Mar 2025
High Brenfield 1
PRO-004875, High Brenfield Wind Farm Limited
High Brenfield 1 GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 52.8 MW in the file dated 21 Mar 2025
Mosspark Energy Park
PRO-004879, REG Power Developments Limited
Dumfries 132/33kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 21 Mar 2025
Hill House Farm Solar and Storage
PRO-004884, BSR APPLICATIONS LIMITED
Norton GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 99.9 MW in the file dated 21 Mar 2025
Glen Earrach PSH
PRO-004903, GLEN EARRACH ENERGY LIMITED
Glen Earrach PSH 400kV substation
Pump Storage
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,800 MW in the file dated 21 Mar 2025
South Street BESS
PRO-004924, South Street BESS Limited
Partrick GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 63 MW in the file dated 21 Mar 2025
Caithness Energy Storage
PRO-004933, BAYWA R.E. UK LIMITED
Spittal 400kV
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 456 MW in the file dated 21 Mar 2025
Cranwell Solar & BESS Farm
PRO-004952, TRIO POWER LIMITED
Navenby 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 21 Mar 2025
Peninsula Energy Park
PRO-004961, Nadara Limited
Taynuilt GSP
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 249.9 MW in the file dated 21 Mar 2025
Camp Farm
PRO-004990, CHINT SOLAR UK MANAGEMENT LTD
Coventry 275kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 249.9 MW in the file dated 21 Mar 2025
Blair Hill Wind Farm
PRO-004994, Renewable Energy Systems Limited
Glenlee 132/11kV
Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 99 MW in the file dated 21 Mar 2025
Eggborough BESS
PRO-004997, Fig Power Limited
Eggborough 400kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 21 Mar 2025
Mid Hill
PRO-005000, Invenergy Development UK Ltd
Hawick 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 228 MW in the file dated 21 Mar 2025
Melton Mowbray Solar
PRO-005004, CUBICO UK DEVELOPMENT LIMITED
West Anglia Connection Node I 400kV substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 340 MW in the file dated 21 Mar 2025
Creag Dhubh Windfarm
PRO-005014, Invenergy Development UK Ltd
Creag Dhubh Wind Farm and BESS 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 171 MW in the file dated 21 Mar 2025
Caorach
PRO-005026, Invenergy Development UK Ltd
Caorach 132 KV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 81 MW in the file dated 21 Mar 2025
Peat Law Renewable Energy Park
PRO-005030, VOLTALIA UK LTD
Gala North 400/132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 253.28 MW in the file dated 21 Mar 2025
NatPower CoalBurn Green Energy Park
PRO-005041, COALBURN ENERGY LIMITED
NatPower Green Energy Park 400kV Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 21 Mar 2025
Grantham Solar Farm - RSL
PRO-005045, SOUTH GRANTHAM ENERGY CENTRE LIMITED
Grantham 400KV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 810 MW in the file dated 21 Mar 2025
Pollington Hybrid
PRO-005049, EDF ENERGY RENEWABLES LIMITED
Leeds North Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 440 MW in the file dated 21 Mar 2025
NatPower Oswestry Green Energy Park
PRO-005057, NP SPV 43 Limited
Oswestry Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 21 Mar 2025
Coachford 400MW BESS
PRO-005097, Field Devco Ltd
Blackhillock 2 400/33kV GSP Substation
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 21 Mar 2025
Field Kinardochy BESS
PRO-005104, Field Devco Ltd
Kinardochy Substation. 400/275kV
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 21 Mar 2025
Woodland Ridge
PRO-005110, CUBICO UK DEVELOPMENT LIMITED
Hawick 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 150 MW in the file dated 21 Mar 2025
Stella Battery Energy Storage
PRO-005112, Capella BESS LTD
Stella South GSP
Energy Storage System
Not in the file dated 20 Dec 2024 or any earlier file N84 holds; printed with 78 MW in the file dated 21 Mar 2025
Back on the register 6
Rayleigh 1 Tertiary
PRO-000460, RAYLEIGH GREEN LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 20 Dec 2024 (archived copy); printed again with 47.5 MW in the file dated 21 Mar 2025. Last printed before that in the file dated 31 May 2024
Melksham (Tertiary)
PRO-000463, MELKSHAM CALNE GREEN LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 20 Dec 2024 (archived copy); printed again with 57 MW in the file dated 21 Mar 2025. Last printed before that in the file dated 31 May 2024
Thorpe Marsh 1 (Tertiary)
PRO-000470, ENSO GREEN HOLDINGS LIMITED
Thorpe Marsh 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 20 Dec 2024 (archived copy); printed again with 57 MW in the file dated 21 Mar 2025. Last printed before that in the file dated 31 May 2024
Walpole 1 (Tertiary)
PRO-000556, WALPOLE GREEN LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 20 Dec 2024 (archived copy); printed again with 57 MW in the file dated 21 Mar 2025. Last printed before that in the file dated 31 May 2024
Rye House (Tertiary)
PRO-000564, ENSO GREEN HOLDINGS N LIMITED
Rye House 400kV Substation
Energy Storage System
Absent from the file dated 20 Dec 2024 (archived copy); printed again with 57 MW in the file dated 21 Mar 2025. Last printed before that in the file dated 31 May 2024
Moray West Offshore Windfarm
PRO-001130, MORAY OFFSHORE WINDFARM (WEST) LIMITED
Moray Firth 220/33kV Platform 1 & 2 Offshore Substation
Wind Offshore
Absent from the file dated 20 Dec 2024 (archived copy); printed again with 860 MW in the file dated 21 Mar 2025. Last printed before that in the file dated 31 May 2024
Removed from the register 33
Eggborough CCGT and BESS
PRO-000136, EGGBOROUGH POWER LIMITED
Eggborough 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 2,450 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Port of Mostyn
PRO-000421, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
Printed with 210 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Rayleigh 1 Tertiary
PRO-000460-1, RAYLEIGH GREEN LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Rayleigh 1 Tertiary
PRO-000460-2, RAYLEIGH GREEN LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Melksham (Tertiary)
PRO-000463-1, MELKSHAM CALNE GREEN LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Melksham (Tertiary)
PRO-000463-2, MELKSHAM CALNE GREEN LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Thorpe Marsh 1 (Tertiary)
PRO-000470-1, ENSO GREEN HOLDINGS LIMITED
Thorpe Marsh 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Thorpe Marsh 1 (Tertiary)
PRO-000470-2, ENSO GREEN HOLDINGS LIMITED
Thorpe Marsh 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
North Kyle New Cumnock
PRO-000474, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV
Wind Onshore
Printed with 212 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Thurrock Power Station
PRO-000494, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
Printed with 750 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Walpole 1 (Tertiary)
PRO-000556-1, WALPOLE GREEN LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Walpole 1 (Tertiary)
PRO-000556-2, WALPOLE GREEN LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Rye House (Tertiary)
PRO-000564-1, ENSO GREEN HOLDINGS LIMITED
Rye House 400kV Substation
Energy Storage System
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Rye House (Tertiary)
PRO-000564-2, ENSO GREEN HOLDINGS LIMITED
Rye House 400kV Substation
Energy Storage System
Printed with 57 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Exeter (Tertiary)
PRO-001047, PIVOTED POWER LLP
Exeter 400kV Substation
Energy Storage System
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Moray West Offshore Windfarm
PRO-001130-1, MORAY OFFSHORE WINDFARM (WEST) LIMITED
Moray Firth 220/33kV Platform 1 & 2 Offshore Substation
Wind Offshore
Printed with 800 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Moray West Offshore Windfarm
PRO-001130-2, MORAY OFFSHORE WINDFARM (WEST) LIMITED
Moray Firth 220/33kV Platform 1 & 2 Offshore Substation
Wind Offshore
Printed with 860 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Ironbridge - New Connection
PRO-001359-1, ENSO GREEN HOLDINGS F LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Ironbridge - New Connection
PRO-001359-2, ENSO GREEN HOLDINGS F LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 99.8 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Ironbridge - New Connection
PRO-001359-3, ENSO GREEN HOLDINGS F LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 120 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Green Volt Offshore Windfarm
PRO-001469, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Printed with 300 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Highland Wind Farm
PRO-001747, AMPYR ENERGY UK DEVELOPMENT LIMITED
Tomatin 275/132 kV Substation
Wind Onshore
Printed with 168.2 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
HIGH MARNHAM
PRO-001769, TRANQUILITY ENERGY LIMITED
High Marnham GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 240 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Old Flatts Farm
PRO-001894, Net Zero One Limited
Brinsworth 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 750 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
TINZ Nene 4 (Richborough)
PRO-001953, TI PROJECTCO 2 LIMITED
Richborough 400kV Substation
Reactive Compensation
Printed with 0 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
TINZ Project Nene 1 (Landulph)
PRO-001968, TINZ PROGRAMME 3 PROJECTCO 1 LIMITED
Landulph 400kV Substation
Reactive Compensation
Printed with 1 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Elstree 400MW BESS
PRO-002169, Hillfield Energy Limited
Elstree 400kV Substation
Energy Storage System
Printed with 400 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Leys Energy Storage
PRO-003584, Renewable Energy Systems Limited
Knocknagael 132kV Substation
Energy Storage System
Printed with 400 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Zenobe Thornton BESS
PRO-003691, ZENOBE ENERGY LIMITED
Thornton 400kV Substation
Energy Storage System
Printed with 330 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Rat Hall Mod App
PRO-003824, Downing Renewable Developments LLP
Burwell South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 500 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Lightsource Chirk
PRO-003848, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Chirk 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 240 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Zenobe Landulph BESS
PRO-004087, ZENOBE ENERGY LIMITED
Landulph 400kV Substation
Energy Storage System
Printed with 300 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Dalswinton WindFarm Extension
PRO-004393, DALSWINTON WINDFARM (SCOTLAND) LIMITED
Dumfries 132/33kV
Wind Onshore
Printed with 38.4 MW in the file dated 20 Dec 2024; not in the file dated 21 Mar 2025
Connection date removed 1,631
Arecleoch
PRO-000012-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Arecleoch 132/33kV
Wind Onshore
MW Effective From was 15 Jun 2032; blank in the file dated 21 Mar 2025
Beaw Field Wind Farm
PRO-000026, BEAW FIELD SHETLAND LIMITED
Beaw Field 132/33kV Substation
Wind Onshore
MW Effective From was 30 Nov 2028; blank in the file dated 21 Mar 2025
Benbrack Wind Farm
PRO-000032, Benbrack Wind Farm Limited
Benbrack Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From was 30 Jan 2025; blank in the file dated 21 Mar 2025
Blacklaw
PRO-000036-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Blacklaw 132/33kV
Energy Storage System;Wind Onshore
MW Effective From was 15 Jun 2029; blank in the file dated 21 Mar 2025
Clashindarroch 2
PRO-000041, VATTENFALL WIND POWER LTD
Cairnford GSP
Energy Storage System;Wind Onshore
MW Effective From was 31 Aug 2026; blank in the file dated 21 Mar 2025
Gateway Energy Centre Power Station
PRO-000045-1, GATEWAY ENERGY CENTRE LIMITED
Coryton South 400kV Substation
Energy Storage System
MW Effective From was 30 Sep 2025; blank in the file dated 21 Mar 2025
Gateway Energy Centre Power Station
PRO-000045-2, GATEWAY ENERGY CENTRE LIMITED
Coryton South 400kV Substation
Energy Storage System
MW Effective From was 30 Oct 2029; blank in the file dated 21 Mar 2025
Immingham
PRO-000053, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
MW Effective From was 29 Sep 2023; blank in the file dated 21 Mar 2025
Dersalloch Wind Farm
PRO-000060, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dersalloch 132/33kV
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Harestanes
PRO-000064-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Harestanes 132/33kV
Energy Storage System;Wind Onshore
MW Effective From was 31 Mar 2028; blank in the file dated 21 Mar 2025
Kilgallioch Wind Farm and Kilgallioch Wind Farm Extension - Turbines
PRO-000065-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Kilgallioch 275kV Substation
Wind Onshore
MW Effective From was 8 Apr 2025; blank in the file dated 21 Mar 2025
Whitelee
PRO-000067-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Energy Storage System;Wind Onshore
MW Effective From was 15 Jun 2029; blank in the file dated 21 Mar 2025
Whitelee Extension
PRO-000068, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee Extension 275/33kV
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From was 31 Mar 2023; blank in the file dated 21 Mar 2025
Coire Glas Pumped Storage
PRO-000073-1, COIRE GLAS HYDRO PUMPED STORAGE LIMITED
Coire Glas GSP
Pump Storage
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Coire Glas Pumped Storage
PRO-000073-2, COIRE GLAS HYDRO PUMPED STORAGE LIMITED
Coire Glas GSP
Pump Storage
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Finlarig
PRO-000079-2, SSE GENERATION LIMITED
Finlarig GSP
Hydro
MW Effective From was 30 Nov 2031; blank in the file dated 21 Mar 2025
Carnedd Wen Wind Farm
PRO-000090, Npower Renewables Ltd
Mid Wales West 132kV Substation
Wind Onshore
MW Effective From was 1 Apr 2026; blank in the file dated 21 Mar 2025
Chirmorie Wind Farm
PRO-000094, CHIRMORIE WIND FARM LIMITED
Chirmorie 132/33kV Substation
Wind Onshore
MW Effective From was 30 Apr 2026; blank in the file dated 21 Mar 2025
Costa Head Wind Farm
PRO-000104, COSTA HEAD WIND FARM LIMITED
Costa Head 132/33kV Substation
Wind Onshore
MW Effective From was 30 Oct 2028; blank in the file dated 21 Mar 2025
Creag Riabhach Wind Farm
PRO-000109-2, CREAG RIABHACH WIND FARM LTD
Creag Riabhach 132/33kV Substation
Wind Onshore
MW Effective From was 31 Jul 2027; blank in the file dated 21 Mar 2025
Cruachan
PRO-000113-2, DRAX PUMPED STORAGE LIMITED
Cruachan 275kV Substation
Pump Storage
MW Effective From was 1 Jun 2027; blank in the file dated 21 Mar 2025
Derwent
PRO-000120, UK UTILITY RESERVE LIMITED
Willington 132kV Substation
CHP (Combined Heat and Power)
MW Effective From was 1 Apr 2024; blank in the file dated 21 Mar 2025
Didcot B
PRO-000122, RWE GENERATION UK PLC
Didcot 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 31 Oct 2037; blank in the file dated 21 Mar 2025
Stranoch Wind Farm
PRO-000127, Stranoch Windfarm Limited
Stranoch Wind 132/33kV Substation
Wind Onshore
MW Effective From was 29 Aug 2025; blank in the file dated 21 Mar 2025
Dungeness B
PRO-000133, EDF ENERGY NUCLEAR GENERATION LIMITED
Dungeness 275kV Substation
Nuclear
MW Effective From was 1 Apr 2025; blank in the file dated 21 Mar 2025
East Anglia Two
PRO-000134-1, EAST ANGLIA TWO LIMITED
EA2A and EA2B 275/66kV Offshore Platform
Wind Offshore
MW Effective From was 31 Mar 2028; blank in the file dated 21 Mar 2025
East Anglia Two
PRO-000134-2, EAST ANGLIA TWO LIMITED
EA2A and EA2B 275/66kV Offshore Platform
Wind Offshore
MW Effective From was 31 Dec 2030; blank in the file dated 21 Mar 2025
Edinbane Windfarm
PRO-000135-2, VATTENFALL WIND POWER LTD
Edinbane 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 30 Apr 2033; blank in the file dated 21 Mar 2025
Sizewell C
PRO-000145-1, Sizewell C Limited
Sizewell 400kV Substation
Nuclear
MW Effective From was 31 Jul 2035; blank in the file dated 21 Mar 2025
Sizewell C
PRO-000145-2, Sizewell C Limited
Sizewell 400kV Substation
Nuclear
MW Effective From was 31 Jul 2036; blank in the file dated 21 Mar 2025
Elchies Wind Farm
PRO-000151-1, ELCHIES WIND LIMITED
Elchies 132/33kV Substation
Wind Onshore
MW Effective From was 30 Nov 2028; blank in the file dated 21 Mar 2025
Elchies Wind Farm
PRO-000151-2, ELCHIES WIND LIMITED
Elchies 132/33kV Substation
Wind Onshore
MW Effective From was 30 Nov 2028; blank in the file dated 21 Mar 2025
Enoch Hill
PRO-000152, RWE RENEWABLES UK ONSHORE WIND LIMITED
Enoch Hill 132/33kV Substation
Wind Onshore
MW Effective From was 30 May 2025; blank in the file dated 21 Mar 2025
Lorg Wind Farm
PRO-000153, RWE RENEWABLES UK ONSHORE WIND LIMITED
Lorg Wind Farm 132/32kV
Wind Onshore
MW Effective From was 30 Apr 2027; blank in the file dated 21 Mar 2025
Strathy Wood
PRO-000154-1, RWE RENEWABLES UK ONSHORE WIND LIMITED
Strathy Wood 132/33kV Substation
Wind Onshore
MW Effective From was 30 Sep 2026; blank in the file dated 21 Mar 2025
Strathy Wood
PRO-000154-2, RWE RENEWABLES UK ONSHORE WIND LIMITED
Strathy Wood 132/33kV Substation
Wind Onshore
MW Effective From was 30 Sep 2026; blank in the file dated 21 Mar 2025
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
MW Effective From was 1 Jan 2027; blank in the file dated 21 Mar 2025
Strathy South Wind
PRO-000183, SSE GENERATION LIMITED
Strathy South 132/33kV Substation
Wind Onshore
MW Effective From was 25 Apr 2027; blank in the file dated 21 Mar 2025
Shoreham
PRO-000192-2, VPI POWER LIMITED
Bolney 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 1 Oct 2026; blank in the file dated 21 Mar 2025
Shoreham
PRO-000192-3, VPI POWER LIMITED
Bolney 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 31 Dec 2029; blank in the file dated 21 Mar 2025
Keadby
PRO-000199, KEADBY GENERATION LIMITED
Keadby 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 1 Oct 2026; blank in the file dated 21 Mar 2025
Medway Power Station
PRO-000203, MEDWAY POWER LIMITED
Grain 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 30 Oct 2028; blank in the file dated 21 Mar 2025
Rugeley
PRO-000209, RUGELEY POWER GENERATION LIMITED
Rugeley GSP
Coal
MW Effective From was 30 Oct 2032; blank in the file dated 21 Mar 2025
Uskmouth
PRO-000220-1, USKMOUTH ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
MW Effective From was 30 Jun 2024; blank in the file dated 21 Mar 2025
Uskmouth
PRO-000220-2, USKMOUTH ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
MW Effective From was 30 Oct 2038; blank in the file dated 21 Mar 2025
Indian Queens
PRO-000225, PIVOTED POWER LLP
Indian Queens 400kV Substation
Energy Storage System
MW Effective From was 30 Jul 2024; blank in the file dated 21 Mar 2025
Windy Standard II (Brockloch Rig) Wind Farm
PRO-000233-2, BROCKLOCH RIG WINDFARM LIMITED
Dun Hill 132/33kV
Wind Onshore
MW Effective From was 30 Jun 2024; blank in the file dated 21 Mar 2025
Spalding Energy Expansion
PRO-000249-2, SPALDING ENERGY EXPANSION LIMITED
Spalding North 400kV Substation
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Oct 2030; blank in the file dated 21 Mar 2025
JG Pears
PRO-000250-2, JG PEARS GRID CONNECTION LIMITED
High Marnham 275kV Substation
CHP (Combined Heat and Power);Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From was 6 Sep 2019; blank in the file dated 21 Mar 2025
East Anglia One North
PRO-000269, EAST ANGLIA ONE LIMITED
EA1N 275/66kV Offshore Platform
Wind Offshore
MW Effective From was 31 Mar 2028; blank in the file dated 21 Mar 2025
East Anglia Three
PRO-000270-1, EAST ANGLIA THREE LIMITED
East Anglia Project Three Offshore Platform
Wind Offshore
MW Effective From was 31 Jan 2026; blank in the file dated 21 Mar 2025
East Anglia Three
PRO-000270-2, EAST ANGLIA THREE LIMITED
East Anglia Project Three Offshore Platform
Wind Offshore
MW Effective From was 31 Dec 2028; blank in the file dated 21 Mar 2025
Muaitheabhal Wind Farm
PRO-000272, UISENIS POWER LIMITED
Muaitheabhal 132/33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
Neart Na Gaoithe Offshore Wind Farm
PRO-000273, NEART NA GAOITHE OFFSHORE WIND LIMITED
Neart Na Gaoithe 220/66KV Offshore Substation
Wind Offshore
MW Effective From was 1 Jun 2023; blank in the file dated 21 Mar 2025
Progress Power Station
PRO-000274, PROGRESS POWER LIMITED
Yaxley 400kV Substation
OCGT (Open Cycle Gas Turbine)
MW Effective From was 28 Jun 2024; blank in the file dated 21 Mar 2025
Trafford Power
PRO-000276-1, WAINSTONES ENERGY LIMITED
Carrington 400KV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 30 Oct 2025; blank in the file dated 21 Mar 2025
Trafford Power
PRO-000276-2, WAINSTONES ENERGY LIMITED
Carrington 400KV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 30 Oct 2036; blank in the file dated 21 Mar 2025
Faw Side Community Wind Farm
PRO-000297, CWP Energy Limited
Faw Side Community Wind Farm Substation
Wind Onshore
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Glen Ullinish Wind Farm
PRO-000298, GLEN ULLINISH WF LIMITED
Glen Ullinish 132/33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Glenmuckloch Pumped Storage
PRO-000299, GLENMUCKLOCH PUMPED STORAGE HYDRO LIMITED
Glenmuckloch 132/33kV
Pump Storage
MW Effective From was 1 Oct 2028; blank in the file dated 21 Mar 2025
Glenmuckloch Wind Farm
PRO-000300, GLENMUCKLOCH RENEWABLE ENERGY LIMITED
Glenmuckloch 132/33kV
Wind Onshore
MW Effective From was 29 Sep 2028; blank in the file dated 21 Mar 2025
Loganhead Windfarm
PRO-000306, LOGANHEAD WF LIMITED
Hopsrig Collector 132/33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Hesta Head Wind Farm
PRO-000308, HESTA HEAD WIND FARM LIMITED
Hesta Head 132/33kV Substation
Wind Onshore
MW Effective From was 30 Oct 2028; blank in the file dated 21 Mar 2025
Hirwaun Power Station
PRO-000309, HIRWAUN POWER LIMITED
Rhigos 400kV Substation
OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Sep 2023; blank in the file dated 21 Mar 2025
Hopsrig Wind Farm
PRO-000318, HOPSRIG WIND FARM LIMITED
Hopsrig Collector 132/33kV Substation
Wind Onshore
MW Effective From was 30 Nov 2026; blank in the file dated 21 Mar 2025
Kennoxhead Wind Farm
PRO-000319, ORSTED ONSHORE UK LIMITED
Kennoxhead GSP
Wind Onshore
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
Pencloe Windfarm
PRO-000323-1, PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 1 Jul 2025; blank in the file dated 21 Mar 2025
Pencloe Windfarm
PRO-000323-2, PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
Willington
PRO-000326, PIVOTED POWER LLP
Willington East 400kV Substation
Energy Storage System
MW Effective From was 30 Jun 2026; blank in the file dated 21 Mar 2025
Scoop Hill Wind Farm
PRO-000327, CWP Energy Limited
Scoop Hill Wind Farm 132kV Substation
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Recell at Penrhos (BEGA)
PRO-000330-1, Recell Energy Bloom Developments Limited
Penrhos GSP
Biomass
MW Effective From was 30 Oct 2025; blank in the file dated 21 Mar 2025
Recell at Penrhos (BEGA)
PRO-000330-2, Recell Energy Bloom Developments Limited
Penrhos GSP
Biomass
MW Effective From was 8 Mar 2027; blank in the file dated 21 Mar 2025
MeyGen Tidal
PRO-000336-1, MEYGEN PLC
Gills Bay GSP
Tidal
MW Effective From was 1 Apr 2027; blank in the file dated 21 Mar 2025
MeyGen Tidal
PRO-000336-2, MEYGEN PLC
Gills Bay GSP
Tidal
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
MeyGen Tidal
PRO-000336-3, MEYGEN PLC
Gills Bay GSP
Tidal
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
MeyGen Tidal
PRO-000336-4, MEYGEN PLC
Gills Bay GSP
Tidal
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
MeyGen Tidal
PRO-000336-5, MEYGEN PLC
Gills Bay GSP
Tidal
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
Pembroke BESS
PRO-000337, RWE GENERATION UK PLC
Pembroke 400kV Substation
Energy Storage System
MW Effective From was 29 Oct 2027; blank in the file dated 21 Mar 2025
Viking Wind Farm
PRO-000338, VIKING ENERGY WIND FARM LLP
Kergord GSP
Wind Onshore
MW Effective From was 1 Jul 2024; blank in the file dated 21 Mar 2025
Whitelaw Brae Windfarm
PRO-000341, WHITELAW BRAE WINDFARM LIMITED
Whitelaw Brae 'A' and 'B' 33kV Substations
Wind Onshore
MW Effective From was 31 Jul 2026; blank in the file dated 21 Mar 2025
North Lowther Energy Initiative
PRO-000344, NLEI LTD
NLEI Wind Farm Connection Substation
Wind Onshore
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
Sandy Knowe Wind Farm
PRO-000345-2, SANDY KNOWE WIND FARM LIMITED
Sandyknowe 132/33kV
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Stornoway Wind Farm
PRO-000346, STORNOWAY WIND FARM LIMITED
Stornoway 132/33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
Inch Cape Offshore Wind Farm Platform 1
PRO-000348, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From was 21 Jun 2026; blank in the file dated 21 Mar 2025
Inch Cape Offshore Wind Farm Platform 2
PRO-000349, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From was 21 Jun 2026; blank in the file dated 21 Mar 2025
Sanquhar II Wind Farm
PRO-000352, SANQUHAR II COMMUNITY WIND CO LTD
Sanquhar 132/33kV
Wind Onshore
MW Effective From was 30 Apr 2024; blank in the file dated 21 Mar 2025
Windy Standard III Wind Farm
PRO-000359-1, Windy Standard III Ltd
Dun Hill 132/33kV
Wind Onshore
MW Effective From was 1 Jun 2026; blank in the file dated 21 Mar 2025
Windy Standard III Wind Farm
PRO-000359-2, Windy Standard III Ltd
Dun Hill 132/33kV
Wind Onshore
MW Effective From was 1 Jun 2026; blank in the file dated 21 Mar 2025
Windy Standard III Wind Farm
PRO-000359-3, Windy Standard III Ltd
Dun Hill 132/33kV
Wind Onshore
MW Effective From was 1 Jun 2026; blank in the file dated 21 Mar 2025
Powersite @ Drakelow
PRO-000364, POWERSITE LTD
Drakelow 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 1 Oct 2020; blank in the file dated 21 Mar 2025
Aberarder Wind Farm
PRO-000368, ABERARDER WIND FARM LLP
Aberarder Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From was 31 Aug 2026; blank in the file dated 21 Mar 2025
West Burton B
PRO-000369-1, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
MW Effective From was 30 Oct 2027; blank in the file dated 21 Mar 2025
West Burton B
PRO-000369-2, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
MW Effective From was 30 Oct 2034; blank in the file dated 21 Mar 2025
Millbrook Power
PRO-000373, MILLBROOK POWER LIMITED
Marston Vale 400kV Substation
OCGT (Open Cycle Gas Turbine)
MW Effective From was 28 Jun 2024; blank in the file dated 21 Mar 2025
Bridgwater (tertiary)
PRO-000375, BRIDGWATER GREEN LIMITED
Bridgewater 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Nov 2026; blank in the file dated 21 Mar 2025
Aberthaw (Tertiary)
PRO-000376, Aberthaw Green Limited
Aberthaw 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Bolney (tertiary)
PRO-000380-1, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2024; blank in the file dated 21 Mar 2025
Bolney (tertiary)
PRO-000380-2, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2025; blank in the file dated 21 Mar 2025
Bhlaraidh Extension Wind Farm
PRO-000383, SSE GENERATION LIMITED
Bhlaraidh 132/33kV Substation
Wind Onshore
MW Effective From was 1 Apr 2026; blank in the file dated 21 Mar 2025
Sunnica
PRO-000393, SUNNICA LIMITED
Burwell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
Bramley (tertiary)
PRO-000396, BRAMLEY SOLAR LIMITED
Bramley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 15 Aug 2026; blank in the file dated 21 Mar 2025
Bramford Tertiary
PRO-000397, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 16 May 2026; blank in the file dated 21 Mar 2025
Blarghour Wind
PRO-000398, BLARGHOUR WIND FARM LIMITED
Blarghour Substation
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Norfolk Boreas
PRO-000399-1, NORFOLK BOREAS LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From was 1 Oct 2029; blank in the file dated 21 Mar 2025
Norfolk Boreas
PRO-000399-2, NORFOLK BOREAS LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From was 31 Dec 2030; blank in the file dated 21 Mar 2025
Elstree (tertiary)
PRO-000400, ELSTREE GREEN LIMITED
Elstree 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
Sofia Offshore Wind Farm
PRO-000404-1, SOFIA OFFSHORE WIND FARM LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
MW Effective From was 1 Sep 2024; blank in the file dated 21 Mar 2025
Sofia Offshore Wind Farm
PRO-000404-2, SOFIA OFFSHORE WIND FARM LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
MW Effective From was 1 Apr 2025; blank in the file dated 21 Mar 2025
Cowley (Tertiary)
PRO-000407, COWLEY BALDON GREEN LIMITED
Cowley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Jul 2025; blank in the file dated 21 Mar 2025
Dogger Bank Project C
PRO-000409, DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIMITED
Lackenby GSP
Wind Offshore
MW Effective From was 1 Apr 2025; blank in the file dated 21 Mar 2025
Dogger Bank Project 4 (Dogger Bank B)
PRO-000410, DOGGERBANK OFFSHORE WIND FARM PROJECT 2 PROJCO LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
MW Effective From was 1 Apr 2024; blank in the file dated 21 Mar 2025
High Constellation Windfarm
PRO-000416, HIGH CONSTELLATION WINDFARM LIMITED
Crossaig 132kV Substation
Wind Onshore
MW Effective From was 30 Apr 2025; blank in the file dated 21 Mar 2025
Corriegarth 2 Wind Farm
PRO-000420, CORRIEGARTH 2 WIND FARM LIMITED
Corriegarth 132/33kV substation
Wind Onshore
MW Effective From was 31 Jul 2026; blank in the file dated 21 Mar 2025
Douglas West Extension
PRO-000422, DOUGLAS WEST EXTENSION LTD
Douglas West Extension Windfarm
Wind Onshore
MW Effective From was 30 Jun 2025; blank in the file dated 21 Mar 2025
Cumberhead West Wind Farm
PRO-000423, CUMBERHEAD WEST WIND FARM LTD.
Cumberhead 33kV
Wind Onshore
MW Effective From was 1 Nov 2024; blank in the file dated 21 Mar 2025
Cloiche Wind Farm
PRO-000425, SSE GENERATION LIMITED
Cloiche 132kV Substation
Wind Onshore
MW Effective From was 31 Jul 2027; blank in the file dated 21 Mar 2025
Enderby (Akira)
PRO-000426, ENDERBY BATTERY STORAGE LIMITED
Enderby 400kV Substation
Energy Storage System
MW Effective From was 9 Dec 2024; blank in the file dated 21 Mar 2025
Dorenell Battery
PRO-000427, DORENELL WINDFARM EXTENSION LIMITED
Dorenell BESS 132KV substation
Wind Onshore
MW Effective From was 31 Oct 2023; blank in the file dated 21 Mar 2025
Drakelow
PRO-000428, ENSO GREEN HOLDINGS LIMITED
Drakelow 132kV Substation
Energy Storage System
MW Effective From was 1 Dec 2027; blank in the file dated 21 Mar 2025
Fleet Tertiary
PRO-000429, FLEET SOLAR LIMITED
Fleet 400kV Substation
Thermal
MW Effective From was 30 Nov 2025; blank in the file dated 21 Mar 2025
Enderby Tertiary
PRO-000430, CLUMP FARM SOLAR LIMITED
Enderby 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From was 1 Aug 2027; blank in the file dated 21 Mar 2025
Minety Tertiary (2)
PRO-000432, JBM SOLAR PROJECTS 14 LTD
Minety GSP
PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2024; blank in the file dated 21 Mar 2025
Hornsea Power Station 3
PRO-000434-1, ORSTED HORNSEA PROJECT THREE (UK) LIMITED
Norwich Main 400kV Substation
Energy Storage System;Wind Offshore
MW Effective From was 1 Oct 2026; blank in the file dated 21 Mar 2025
Hornsea Power Station 3
PRO-000434-2, ORSTED HORNSEA PROJECT THREE (UK) LIMITED
Norwich Main 400kV Substation
Energy Storage System;Wind Offshore
MW Effective From was 31 Dec 2028; blank in the file dated 21 Mar 2025
Hornsea Power Station 4
PRO-000435-1, ORSTED HORNSEA PROJECT FOUR LIMITED
Creyke Beck 400kV Substation
Wind Offshore
MW Effective From was 30 Oct 2028; blank in the file dated 21 Mar 2025
Hornsea Power Station 4
PRO-000435-2, ORSTED HORNSEA PROJECT FOUR LIMITED
Creyke Beck 400kV Substation
Wind Offshore
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Glenshimmeroch Windfarm
PRO-000440, ENERGYFARM UK GLENSHIMMEROCH LLP
SPT Margree collector substation
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Energy Isles
PRO-000447, ENERGY ISLES SHETLAND LIMITED
Energy Isles 132kV Substation
Wind Onshore
MW Effective From was 30 Nov 2028; blank in the file dated 21 Mar 2025
Priestgill Wind Farm
PRO-000448, PRIESTGILL WIND FARM LIMITED
Elvanfoot 400/275/33kV
Wind Onshore
MW Effective From was 6 Dec 2024; blank in the file dated 21 Mar 2025
Grain South Power Station
PRO-000449, Grain South Power Limited
Grain South 132kV Substation
Gas Reciprocating
MW Effective From was 30 Oct 2023; blank in the file dated 21 Mar 2025
Five Estuaries Offshore Wind Farm
PRO-000450, FIVE ESTUARIES OFFSHORE WIND FARM LIMITED
Five Estuaries 220/66 kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
North Falls Offshore Wind Farm
PRO-000451, NORTH FALLS OFFSHORE WIND FARM LIMITED
North Falls Offshore Platform Substation
Wind Offshore
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
Exeter Main Tertiary
PRO-000452, EXETER MAIN BATTERY LIMITED
Exeter 400kV Substation
Thermal
MW Effective From was 1 May 2024; blank in the file dated 21 Mar 2025
Fife Grid Services
PRO-000453, BLUEGRIDPOWER LTD
Fife Grid Services Facility 275kV Substation
Reactive Compensation
MW Effective From was 12 Apr 2024; blank in the file dated 21 Mar 2025
Minety
PRO-000454, HB411MIN Limited
Minety 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Iron Acton
PRO-000455-1, HD000ACT LTD
Iron Acton 275kV Substation
Energy Storage System
MW Effective From was 30 Jun 2025; blank in the file dated 21 Mar 2025
Iron Acton
PRO-000455-2, HD000ACT LTD
Iron Acton 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Vanguard
PRO-000459, NORFOLK VANGUARD WEST LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From was 1 Dec 2025; blank in the file dated 21 Mar 2025
Mossy Hill Wind Farm
PRO-000461, MOSSY HILL SHETLAND LIMITED
Mossy Hill 132kV Substation
Demand;Wind Onshore
MW Effective From was 30 Nov 2028; blank in the file dated 21 Mar 2025
Ocker Hill Tertiary Connection
PRO-000462, HD143OCK LTD
Ocker Hill 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2023; blank in the file dated 21 Mar 2025
Mannington Tertiary
PRO-000464, MANNINGTON ENERGY CENTRE LIMITED
Mannington 400kV Substation
Energy Storage System
MW Effective From was 30 Oct 2025; blank in the file dated 21 Mar 2025
Rayleigh 2 Tertiary
PRO-000466, ENSO GREEN HOLDINGS LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Rampion Extension Offshore Wind Farm
PRO-000467, RAMPION EXTENSION DEVELOPMENT LIMITED
Rampion Offshore Wind Farm
Wind Offshore
MW Effective From was 1 Aug 2026; blank in the file dated 21 Mar 2025
Erebus
PRO-000471, BLUE GEM WIND LIMITED
Pembroke 132kV Substation
Wind Offshore
MW Effective From was 26 Jul 2028; blank in the file dated 21 Mar 2025
Overhill Wind Farm
PRO-000472, ENERGYFARM UK OVERHILL LLP
Overhill 132kV Substation
Wind Onshore
MW Effective From was 30 Jun 2027; blank in the file dated 21 Mar 2025
Sundon
PRO-000473, SUNDON GREEN LIMITED
Sundon GSP
Energy Storage System
MW Effective From was 10 Nov 2023; blank in the file dated 21 Mar 2025
Breezy Hill Wind Farm
PRO-000475, BROCKWELL ENERGY LIMITED
New Cumnock 275/132kV
Wind Onshore
MW Effective From was 30 Apr 2028; blank in the file dated 21 Mar 2025
Monquhill Wind Farm
PRO-000478, RWE RENEWABLES UK ONSHORE WIND LIMITED
Monquhill Wind Farm 132kV/33kV
Wind Onshore
MW Effective From was 30 Apr 2027; blank in the file dated 21 Mar 2025
Monk Fryston Tertiary Connection
PRO-000479, HD777FRY LTD
Monk Fryston 275kV Substation
Energy Storage System
MW Effective From was 1 Oct 2024; blank in the file dated 21 Mar 2025
Knockodhar Wind Farm
PRO-000483, REG KNOCKODHAR LIMITED
Mark Hill 275/132kV
Wind Onshore
MW Effective From was 30 Apr 2028; blank in the file dated 21 Mar 2025
Lovedean (Tertiary)
PRO-000484-1, LOVEDEAN GREEN LIMITED
Lovedean 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jul 2024; blank in the file dated 21 Mar 2025
Lovedean (Tertiary)
PRO-000484-2, LOVEDEAN GREEN LIMITED
Lovedean 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 May 2025; blank in the file dated 21 Mar 2025
Loch Luichart Extension II
PRO-000487, BLUEBELL WIND FARM LIMITED
Loch Luichart Extension II Substation
Wind Onshore
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Hagshaw Hill Phase 1
PRO-000490, HAGSHAW HILL REPOWERING LTD
Coalburn 400/132kV
Wind Onshore
MW Effective From was 30 May 2024; blank in the file dated 21 Mar 2025
Iron Acton
PRO-000491-2, IRON ACTON GREEN LIMITED
Iron Acton 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Sep 2024; blank in the file dated 21 Mar 2025
Iron Acton
PRO-000491-3, IRON ACTON GREEN LIMITED
Iron Acton 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Sep 2027; blank in the file dated 21 Mar 2025
Mill Hill Tertiary Connection
PRO-000493, HB333MIL LTD
Mill Hill 275kV Substation
Energy Storage System
MW Effective From was 30 Aug 2024; blank in the file dated 21 Mar 2025
JBM Solar 13 - Melksham
PRO-000495, JBM SOLAR PROJECTS 13 LIMITED
Melksham 400kV Substation
Thermal
MW Effective From was 14 Nov 2025; blank in the file dated 21 Mar 2025
Walpole 2 (tertiary)
PRO-000505, ENSO GREEN HOLDINGS R LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Wylfa Substation
PRO-000506, WYLFA GREEN LIMITED
Wylfa 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jun 2029; blank in the file dated 21 Mar 2025
Scira-Dudgeon Extension
PRO-000507-1, EQUINOR NEW ENERGY LIMITED
Norwich Main 400kV Substation
Wind Offshore
MW Effective From was 1 Jan 2029; blank in the file dated 21 Mar 2025
Scira-Dudgeon Extension
PRO-000507-2, EQUINOR NEW ENERGY LIMITED
Norwich Main 400kV Substation
Wind Offshore
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Scira-Dudgeon Extension
PRO-000507-3, EQUINOR NEW ENERGY LIMITED
Norwich Main 400kV Substation
Wind Offshore
MW Effective From was 1 Oct 2034; blank in the file dated 21 Mar 2025
Shepherds Rig Wind Farm
PRO-000511, SETT WIND DEVELOPMENT LIMITED
Shepherds Rig Wind Farm 132kV Substation
Wind Onshore
MW Effective From was 30 Jul 2024; blank in the file dated 21 Mar 2025
Whitegate Tertiary Connection
PRO-000512, HD144WHI LTD
Whitegate 275kV Substation
Energy Storage System
MW Effective From was 30 Jun 2024; blank in the file dated 21 Mar 2025
Berwick Bank Offshore Wind Farm C
PRO-000513, BERWICK BANK C LIMITED
Blyth 400kV Substation
Wind Offshore
MW Effective From was 30 Nov 2029; blank in the file dated 21 Mar 2025
Hagshaw Hill Phase 2
PRO-000514, HAGSHAW HILL REPOWERING LTD
Coalburn 400/132kV
Wind Onshore
MW Effective From was 30 May 2024; blank in the file dated 21 Mar 2025
Limekiln
PRO-000515, Limekiln Extension Limited
Limekilns 132/33kV substation
Wind Onshore
MW Effective From was 30 Apr 2024; blank in the file dated 21 Mar 2025
Berkswell (Tertiary)
PRO-000516-1, ENSO GREEN HOLDINGS LIMITED
Berkswell 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Berkswell (Tertiary)
PRO-000516-2, ENSO GREEN HOLDINGS LIMITED
Berkswell 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Crystal Rig IV Wind Farm
PRO-000520, CRYSTAL RIG IV LIMITED
Crystal Rig 132/33kV
Wind Onshore
MW Effective From was 30 Jun 2024; blank in the file dated 21 Mar 2025
Fallago Rig 2
PRO-000526, EDF ENERGY RENEWABLES LIMITED
Fallago 400/33kV
Wind Onshore
MW Effective From was 30 Apr 2029; blank in the file dated 21 Mar 2025
Awel Y Mor Extension
PRO-000529-1, AWEL Y MOR OFFSHORE WIND FARM LIMITED
Bodelwyddan 400kV Substation
Wind Offshore
MW Effective From was 1 Apr 2027; blank in the file dated 21 Mar 2025
Awel Y Mor Extension
PRO-000529-2, AWEL Y MOR OFFSHORE WIND FARM LIMITED
Bodelwyddan 400kV Substation
Wind Offshore
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
High Marnham (Tertiary)
PRO-000531, ENSO GREEN HOLDINGS K LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Sep 2025; blank in the file dated 21 Mar 2025
Pembroke (spare bay)
PRO-000538, ENSO GREEN HOLDINGS LIMITED
Pembroke 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2026; blank in the file dated 21 Mar 2025
Capenhurst
PRO-000540, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Sep 2033; blank in the file dated 21 Mar 2025
Hareshaw Rig Wind Farm
PRO-000543, HARESHAW RIG WF LIMITED
Hopsrig Collector 132/33kV Substation
Wind Onshore
MW Effective From was 30 Nov 2026; blank in the file dated 21 Mar 2025
Fleet EGH (Tertiary)
PRO-000544, Fleet Green Limited
Fleet 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 13 Jan 2027; blank in the file dated 21 Mar 2025
Willington East 2 (Tertiary)
PRO-000548-1, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Willington East 2 (Tertiary)
PRO-000548-2, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Cryogenic Battery System (Synchronous)
PRO-000549, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Willington East 1 (Tertiary)
PRO-000551-1, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jun 2025; blank in the file dated 21 Mar 2025
Willington East 1 (Tertiary)
PRO-000551-2, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jun 2027; blank in the file dated 21 Mar 2025
West Weybridge (Tertiary)
PRO-000552-1, ENSO GREEN HOLDINGS LIMITED
West Weybridge 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
West Weybridge (Tertiary)
PRO-000552-2, ENSO GREEN HOLDINGS LIMITED
West Weybridge 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Warley (tertiary)
PRO-000555-1, WARLEY GREEN LIMITED
Warley 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Jul 2023; blank in the file dated 21 Mar 2025
Warley (tertiary)
PRO-000555-2, WARLEY GREEN LIMITED
Warley 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 28 Jun 2024; blank in the file dated 21 Mar 2025
Armadale Wind Farm
PRO-000557, WIND DEVELOPMENT HOLDINGS LIMITED
Armadale 400kv Substation
Energy Storage System;Wind Onshore
MW Effective From was 1 Aug 2027; blank in the file dated 21 Mar 2025
West Burton Solar Project
PRO-000561, WEST BURTON SOLAR PROJECT LIMITED
West Burton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Nov 2028; blank in the file dated 21 Mar 2025
GT R4 Wind Farm
PRO-000563, GT R4 LIMITED
Weston Marsh 400kV Substation
Wind Offshore
MW Effective From was 30 Nov 2030; blank in the file dated 21 Mar 2025
Daer Wind Farm
PRO-000565, RWE RENEWABLES UK ONSHORE WIND LIMITED
Daer Windfarm 132/33kV
Wind Onshore
MW Effective From was 14 Jul 2027; blank in the file dated 21 Mar 2025
OWPL Windfarm
PRO-000568-1, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
OWPL Windfarm
PRO-000568-2, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Loch na Cathrach Pumped Storage Hydro
PRO-000570-1, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
MW Effective From was 31 Jul 2028; blank in the file dated 21 Mar 2025
Loch na Cathrach Pumped Storage Hydro
PRO-000570-2, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
MW Effective From was 31 Oct 2032; blank in the file dated 21 Mar 2025
Vanguard East
PRO-000580-1, Norfolk Vanguard East Ltd
Necton 400kV Substation
Wind Offshore
MW Effective From was 1 Apr 2028; blank in the file dated 21 Mar 2025
Vanguard East
PRO-000580-2, Norfolk Vanguard East Ltd
Necton 400kV Substation
Wind Offshore
MW Effective From was 31 Dec 2028; blank in the file dated 21 Mar 2025
Seagreen 1A Offshore Wind Farm
PRO-000703, SEAGREEN 1A LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From was 1 Apr 2026; blank in the file dated 21 Mar 2025
VPI Immingham B OCGT
PRO-000854, VPI IMMINGHAM B LIMITED
Humber Refinery 400kV Substation
Gas Reciprocating
MW Effective From was 16 Jan 2026; blank in the file dated 21 Mar 2025
Teviot Wind Farm
PRO-000855, TEVIOT WF LIMITED
Teviot 400/132kV Substation
Wind Onshore
MW Effective From was 30 May 2033; blank in the file dated 21 Mar 2025
Kincardine Battery Storage Facility
PRO-000856, SPECTRUMRESERVE LTD
Fife Grid Services Facility 275kV Substation
Energy Storage System
MW Effective From was 12 Apr 2024; blank in the file dated 21 Mar 2025
Greengairs East Wind Farm
PRO-000880, GREENGAIRS EAST WIND FARM LIMITED
Cumbernauld 132/33kV
Wind Onshore
MW Effective From was 25 Nov 2022; blank in the file dated 21 Mar 2025
Little Raith BES
PRO-000887, DAISY NO 2 LIMITED
Glenniston GSP
Energy Storage System
MW Effective From was 15 Aug 2023; blank in the file dated 21 Mar 2025
Pines Burn Wind Farm
PRO-000897, PINES BURN WIND FARM LLP
Hawick GSP
Wind Onshore
MW Effective From was 2 Aug 2023; blank in the file dated 21 Mar 2025
Coupar Angus Battery
PRO-000905, COUPAR LIMITED
Coupar Angus GSP
Energy Storage System
MW Effective From was 21 Feb 2022; blank in the file dated 21 Mar 2025
Braelangwell Wind Farm
PRO-000916, WIND DEVELOPMENT HOLDINGS LIMITED
Shin GSP
Wind Onshore
MW Effective From was 1 Feb 2028; blank in the file dated 21 Mar 2025
Tarland Battery Storage System
PRO-000922, Tarland Limited
Tarland GSP
Energy Storage System
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Hill of Towie 2 Wind Farm
PRO-000938, Renewable Energy Systems Limited
Keith GSP
Wind Onshore
MW Effective From was 1 Jun 2030; blank in the file dated 21 Mar 2025
Hare Craig Wind Farm
PRO-000940, ENERGYFARM UK HARE CRAIG LLP
Hare Craig 33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Kaimes Energy Park
PRO-000942, HP Trotter t/a Printonan Farm
Kaimes 275/33kV Substation
Demand;Energy Storage System
MW Effective From was 30 Apr 2027; blank in the file dated 21 Mar 2025
West Torrisdale
PRO-000944, ESB ASSET DEVELOPMENT UK LIMITED
Carradale 1 GSP
Wind Onshore
MW Effective From was 30 Apr 2027; blank in the file dated 21 Mar 2025
Arbroath Battery Substation
PRO-000950, ARBROATH LIMITED
Arbroath GSP
Energy Storage System
MW Effective From was 21 Feb 2022; blank in the file dated 21 Mar 2025
Druim Leathann BEGA
PRO-000966, DRUIM LEATHANN WINDFARM LIMITED
Stornoway GSP
Wind Onshore
MW Effective From was 31 Mar 2027; blank in the file dated 21 Mar 2025
Cogle Moss Wind Farm
PRO-000973, COGLE MOSS RENEWABLES LLP
Mybster 2 132/33kV Substation
Wind Onshore
MW Effective From was 31 Aug 2025; blank in the file dated 21 Mar 2025
Oaklands Farm Solar PV
PRO-001004, BAYWA R.E. UK LIMITED
Drakelow 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Jun 2025; blank in the file dated 21 Mar 2025
Greenburn Mixed Technology
PRO-001006, REG GREENBURN LIMITED
Greenburn Mixed Technology 132kV Substation
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Feckenham Greener Grid Park
PRO-001008-1, STATKRAFT UK LTD
Feckenham 400kV Substation
Energy Storage System
MW Effective From was 31 Jan 2026; blank in the file dated 21 Mar 2025
Feckenham Greener Grid Park
PRO-001008-2, STATKRAFT UK LTD
Feckenham 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2032; blank in the file dated 21 Mar 2025
Fasque Windfarm
PRO-001009, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Fasque Wind Farm 132kV Substation
PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Euchanhead Wind Farm
PRO-001011, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Euchanhead 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 29 Oct 2029; blank in the file dated 21 Mar 2025
Dell Wind Farm
PRO-001012, DELL WIND FARM LIMITED
Dell 132kV Substation
Wind Onshore
MW Effective From was 31 Jul 2027; blank in the file dated 21 Mar 2025
Bramford (Tertiary)
PRO-001016, DAMSONGREEN ENERGYFARM LIMITED
Bramford 400kV Substation
Energy Storage System
MW Effective From was 1 Nov 2023; blank in the file dated 21 Mar 2025
Axminster
PRO-001017, HB825AXM LTD
Axminster 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Breach Solar Farm
PRO-001019, Burwell 11 Solar Limited
Burwell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 25 Apr 2024; blank in the file dated 21 Mar 2025
Ferrybridge D
PRO-001020-1, KEADBY GENERATION LIMITED
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 6 Oct 2028; blank in the file dated 21 Mar 2025
Ferrybridge D
PRO-001020-2, KEADBY GENERATION LIMITED
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 4 Oct 2030; blank in the file dated 21 Mar 2025
Ferrybridge D
PRO-001020-3, KEADBY GENERATION LIMITED
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 1 Jun 2034; blank in the file dated 21 Mar 2025
Clauchrie Windfarm
PRO-001021, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Clauchrie 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Clash Gour
PRO-001022, EDF ENERGY RENEWABLES LIMITED
Clash Gour Wind Farm 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 30 Oct 2027; blank in the file dated 21 Mar 2025
Carrington
PRO-001025, PIVOTED POWER LLP
Carrington 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Carrick Wind Farm
PRO-001026, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Carrick Wind Farm Substation
Wind Onshore
MW Effective From was 28 Feb 2029; blank in the file dated 21 Mar 2025
Capenhurst Tertiary Connection
PRO-001028, HD888CAP LIMITED
Capenhurst 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2023; blank in the file dated 21 Mar 2025
Canterbury Tertiary
PRO-001029-1, ENSO GREEN HOLDINGS LIMITED
Canterbury 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Canterbury Tertiary
PRO-001029-2, ENSO GREEN HOLDINGS LIMITED
Canterbury 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Sep 2026; blank in the file dated 21 Mar 2025
Bolney
PRO-001031, PIVOTED POWER LLP
Bolney 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Bicker Fen 1 Solar
PRO-001034-1, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From was 30 May 2025; blank in the file dated 21 Mar 2025
Bicker Fen 1 Solar
PRO-001034-2, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From was 1 Apr 2035; blank in the file dated 21 Mar 2025
Beinn Tharsuinn Repower
PRO-001035, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Beinn Tharsuinn Repower 132/33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
North Killingholme Power Project
PRO-001038, C.GEN KILLINGHOLME LIMITED
Killingholme 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From was 30 Sep 2030; blank in the file dated 21 Mar 2025
Bredbury
PRO-001041, PIVOTED POWER LLP
Bredbury 275kV Substation
Energy Storage System
MW Effective From was 14 Sep 2024; blank in the file dated 21 Mar 2025
Braintree
PRO-001042-1, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System
MW Effective From was 30 Oct 2024; blank in the file dated 21 Mar 2025
Braintree
PRO-001042-2, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System
MW Effective From was 30 Oct 2026; blank in the file dated 21 Mar 2025
Braintree (Tertiary)
PRO-001043, CSE22 LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2026; blank in the file dated 21 Mar 2025
Rosefield
PRO-001044, Rosefield Energyfarm Limited
East Claydon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Bicker Fen 2 Solar
PRO-001046-1, AGR SOLAR 3 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Sep 2025; blank in the file dated 21 Mar 2025
Bicker Fen 2 Solar
PRO-001046-2, AGR SOLAR 3 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Apr 2033; blank in the file dated 21 Mar 2025
Tees CCPP
PRO-001048-1, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Sep 2023; blank in the file dated 21 Mar 2025
Tees CCPP
PRO-001048-2, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Sep 2024; blank in the file dated 21 Mar 2025
Tees CCPP
PRO-001048-3, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 11 Mar 2026; blank in the file dated 21 Mar 2025
Tees CCPP
PRO-001048-4, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Sep 2027; blank in the file dated 21 Mar 2025
Tees CCPP
PRO-001048-5, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Sep 2027; blank in the file dated 21 Mar 2025
Tees CCPP
PRO-001048-6, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 30 Sep 2030; blank in the file dated 21 Mar 2025
Fferm Solar Pentir
PRO-001049, LIGHTSOURCE SPV 191 LIMITED
Pentir 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 May 2027; blank in the file dated 21 Mar 2025
Plas Power Estate North Tertiary
PRO-001050, LIGHTSOURCE SPV 192 LIMITED
Legacy 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Aug 2026; blank in the file dated 21 Mar 2025
Longfield Solar
PRO-001053, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 15 Dec 2027; blank in the file dated 21 Mar 2025
Worset PV & BESS Park
PRO-001055, Worcestershire Solar 1 Limited
Hartmoor 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 7 Jun 2024; blank in the file dated 21 Mar 2025
Damhead Creek 2
PRO-001056, VPI POWER LIMITED
Kingsnorth 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From was 31 Aug 2025; blank in the file dated 21 Mar 2025
Whitson
PRO-001061, PIVOTED POWER LLP
Whitson 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Deeside Power Station
PRO-001062, DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
Energy Storage System;Gas Reciprocating
MW Effective From was 25 Oct 2026; blank in the file dated 21 Mar 2025
Laleham
PRO-001063, Juniper Energy Limited
Laleham 275kV Substation
Energy Storage System
MW Effective From was 1 Nov 2025; blank in the file dated 21 Mar 2025
Kearsley
PRO-001064, PIVOTED POWER LLP
Kearsley 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Pivot Power Harker Hybrid
PRO-001065, PIVOTED POWER LLP
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Sheirdrim Wind Farm
PRO-001066, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Sheirdrim 132kV Substation
Wind Onshore
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Sellindge (Tertiary)
PRO-001067, PIVOTED POWER LLP
Sellindge 400kV Substation
Energy Storage System
MW Effective From was 1 Nov 2024; blank in the file dated 21 Mar 2025
Seabank (Tertiary)
PRO-001068, PIVOTED POWER LLP
Seabank 400kV Substation
Energy Storage System
MW Effective From was 1 Nov 2023; blank in the file dated 21 Mar 2025
Taunton
PRO-001073-1, PIVOTED POWER LLP
Taunton 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Taunton
PRO-001073-2, PIVOTED POWER LLP
Taunton 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2037; blank in the file dated 21 Mar 2025
Oldbury (Tertiary)
PRO-001074-1, PIVOTED POWER LLP
Oldbury 275kV Substation
Energy Storage System
MW Effective From was 30 Jun 2027; blank in the file dated 21 Mar 2025
Oldbury (Tertiary)
PRO-001074-2, PIVOTED POWER LLP
Oldbury 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2037; blank in the file dated 21 Mar 2025
Old Forest of Ae
PRO-001075, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Old Forest of Ae 33kV Substation
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Norwich Yare
PRO-001076, ASHGREEN ENERGY FARM LIMITED
Norwich GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Norwich
PRO-001077, PIVOTED POWER LLP
Norwich GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Monets Garden
PRO-001082, MONETS GARDEN BATTERY LTD
Osbaldwick 400kV Substation
Energy Storage System
MW Effective From was 30 Oct 2024; blank in the file dated 21 Mar 2025
Kirkby (Tertiary)
PRO-001083, PIVOTED POWER LLP
Kirkby GSP (ENW)
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Aug 2027; blank in the file dated 21 Mar 2025
Kirkby
PRO-001084-1, HD001KIR LTD
Kirkby 275kV Substation
Gas Reciprocating
MW Effective From was 30 Sep 2025; blank in the file dated 21 Mar 2025
Kirkby
PRO-001084-2, HD001KIR LTD
Kirkby 275kV Substation
Gas Reciprocating
MW Effective From was 30 Oct 2037; blank in the file dated 21 Mar 2025
Fleet (Tertiary)
PRO-001087, CSE23 LIMITED
Fleet 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Lister Battery (formerly Lister Drive)
PRO-001088, LISTER BATTERY LTD
Lister Drive 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2023; blank in the file dated 21 Mar 2025
Ayrshire Grid Services Facility
PRO-001090, FLEXIBLEGRIDPOWER LTD
Hunterston East 400kV substation
Reactive Compensation
MW Effective From was 3 Sep 2025; blank in the file dated 21 Mar 2025
Mannington
PRO-001091, PIVOTED POWER LLP
Mannington 400kV Substation
Energy Storage System
MW Effective From was 30 Nov 2025; blank in the file dated 21 Mar 2025
Mannington
PRO-001092, BAYWA R.E. UK LIMITED
Mannington 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From was 20 May 2025; blank in the file dated 21 Mar 2025
Hollandmey Renewable Energy Development
PRO-001094, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Hollandmey Renewable Energy Development132/33kV Substation
Wind Onshore
MW Effective From was 1 May 2029; blank in the file dated 21 Mar 2025
SHBEC
PRO-001096, EP SHB LIMITED
South Humber Bank 400kV Substation
Waste
MW Effective From was 31 Jul 2026; blank in the file dated 21 Mar 2025
Cleve Hill Solar Park
PRO-001097, CLEVE HILL SOLAR PARK LIMITED
Cleve Hill 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 22 Mar 2024; blank in the file dated 21 Mar 2025
Bramley BESS
PRO-001104-1, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
MW Effective From was 29 Sep 2025; blank in the file dated 21 Mar 2025
Bramley BESS
PRO-001104-2, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2037; blank in the file dated 21 Mar 2025
Wymondley Solar Farm
PRO-001105, AGR SOLAR 4 LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jun 2024; blank in the file dated 21 Mar 2025
Airtnoch BESS
PRO-001107, TURBINE MARKETING SPV LIMITED
Whitelee Extension 275/33kV
PV Array (Photo Voltaic/solar)
MW Effective From was 29 Sep 2027; blank in the file dated 21 Mar 2025
Burwell (Tertiary)
PRO-001109, PIVOTED POWER LLP
Burwell Main 400kV Substation
Energy Storage System
MW Effective From was 30 Jun 2029; blank in the file dated 21 Mar 2025
Arecleoch Windfarm Extension
PRO-001111, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Arecleoch 132/33kV
Wind Onshore
MW Effective From was 31 Aug 2026; blank in the file dated 21 Mar 2025
Warley
PRO-001113, WARLEY BATTERY STORAGE
Warley 275kV Substation
Energy Storage System
MW Effective From was 31 Aug 2027; blank in the file dated 21 Mar 2025
Troston Wind Farm
PRO-001115, TROSTON WINDFARM LIMITED
Troston Wind Farm 132kV Substation
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Swansea North
PRO-001119, PIVOTED POWER LLP
Swansea North 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Swansea Greener Grid Park - Connection 1
PRO-001120-1, Swansea Grid Solutions Limited
Swansea North 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From was 31 Aug 2024; blank in the file dated 21 Mar 2025
Swansea Greener Grid Park - Connection 1
PRO-001120-2, Swansea Grid Solutions Limited
Swansea North 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Llanwern Phase 1
PRO-001124, GREENFIELDS (T) LIMITED
Whitson 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Oct 2028; blank in the file dated 21 Mar 2025
Llanwern Phase 2
PRO-001125, FUTURE ENERGY LLANWERN LIMITED
Whitson 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Oct 2028; blank in the file dated 21 Mar 2025
Tillbridge Solar
PRO-001126, TILLBRIDGE SOLAR LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 27 Aug 2028; blank in the file dated 21 Mar 2025
Keith 132 Greener Grid Park
PRO-001129-2, KEITH STORAGE SOLUTIONS LIMITED
Keith 1 132/33kV GSP Substation
Energy Storage System
MW Effective From was 31 May 2025; blank in the file dated 21 Mar 2025
Landulph
PRO-001131, PIVOTED POWER LLP
Landulph 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2022; blank in the file dated 21 Mar 2025
Sundon
PRO-001132, SUNDON BATTERY STORAGE LIMITED
Sundon 400kV Substation
Energy Storage System
MW Effective From was 1 May 2024; blank in the file dated 21 Mar 2025
St Dennis Hendra
PRO-001133, SAMBAR POWER LIMITED
Indian Queens 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-1, MENTER MÔN MORLAIS LIMITED
Penrhos GSP
Tidal
MW Effective From was 31 Mar 2028; blank in the file dated 21 Mar 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-2, MENTER MÔN MORLAIS LIMITED
Penrhos GSP
Tidal
MW Effective From was 31 Mar 2029; blank in the file dated 21 Mar 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-3, MENTER MÔN MORLAIS LIMITED
Penrhos GSP
Tidal
MW Effective From was 31 Mar 2030; blank in the file dated 21 Mar 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-4, MENTER MÔN MORLAIS LIMITED
Penrhos GSP
Tidal
MW Effective From was 31 Mar 2032; blank in the file dated 21 Mar 2025
Alverdiscott
PRO-001136-1, PIVOTED POWER LLP
Alverdiscott 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Alverdiscott
PRO-001136-2, PIVOTED POWER LLP
Alverdiscott 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2036; blank in the file dated 21 Mar 2025
Spennymoor
PRO-001138, PIVOTED POWER LLP
Spennymoor 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Earraghail Renewable Energy Development (formerly Skipness & Corranbuie)
PRO-001139, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Earraghail 275/33KV Substation
Wind Onshore
MW Effective From was 30 May 2029; blank in the file dated 21 Mar 2025
Iver
PRO-001141, Juniper Energy Limited
Iver 275kV Substation
Energy Storage System
MW Effective From was 29 Oct 2027; blank in the file dated 21 Mar 2025
Axminster
PRO-001143, PIVOTED POWER LLP
Axminster 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
JBM Solar 12 - Shrewsbury Solar
PRO-001146, JBM SOLAR PROJECTS 12 LTD
Shrewsbury GSP
PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2024; blank in the file dated 21 Mar 2025
Hunterston Battery Storage Facility
PRO-001155, FLEXIBLEGRIDPOWER2 LTD
Ayrshire Grid 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From was 12 Apr 2024; blank in the file dated 21 Mar 2025
Heathland Wind Farm
PRO-001156, EDF ENERGY RENEWABLES LIMITED
Heathland 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 31 Mar 2027; blank in the file dated 21 Mar 2025
Garn Fach Wind Farm
PRO-001157, EDF ENERGY RENEWABLES LIMITED
Garn Fach 132kV Substation
Wind Onshore
MW Effective From was 1 May 2032; blank in the file dated 21 Mar 2025
Nant Y Maen Wind Farm
PRO-001158, EDF ENERGY RENEWABLES LIMITED
Nant Y Maen 132KV Substation
Wind Onshore
MW Effective From was 1 May 2032; blank in the file dated 21 Mar 2025
Legacy Tertiary Connection
PRO-001171, HD639LEG LIMITED
Legacy 400kV Substation
Energy Storage System
MW Effective From was 31 Aug 2024; blank in the file dated 21 Mar 2025
Wymondley
PRO-001245, PIVOTED POWER LLP
Wymondley 400kV Substation
Energy Storage System
MW Effective From was 30 Jun 2025; blank in the file dated 21 Mar 2025
Quantans Hill Wind Farm
PRO-001247, VATTENFALL WIND POWER LTD
Quantans Hill 132kV Substation
Wind Onshore
MW Effective From was 2 Jul 2029; blank in the file dated 21 Mar 2025
Roaring Hill Energy Storage Facility
PRO-001272, ROARING HILL ENERGY STORAGE LTD
Glenrothes GSP
Energy Storage System
MW Effective From was 28 Jul 2023; blank in the file dated 21 Mar 2025
Gleann Eoghainn
PRO-001275, Nadara Limited
Dunvegan GSP
Wind Onshore
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Bilbo Farm
PRO-001301-1, LEL BILBO SOLAR LIMITED
Strichen GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Bilbo Farm
PRO-001301-2, LEL BILBO SOLAR LIMITED
Strichen GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
Cairnmore Hill Wind Farm
PRO-001304, Renewable Energy Systems Limited
Thurso South GSP
Wind Onshore
MW Effective From was 31 May 2028; blank in the file dated 21 Mar 2025
Artfield Forest Windfarm
PRO-001310, ARTFIELD FOREST WIND FARM LTD
Newton Stewart GSP
Wind Onshore
MW Effective From was 1 May 2026; blank in the file dated 21 Mar 2025
West Burton
PRO-001323, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jun 2027; blank in the file dated 21 Mar 2025
Lister Drive Shaw
PRO-001342, Carnegie (BES) Ltd
Lister Drive 275kV Substation
Energy Storage System
MW Effective From was 1 May 2025; blank in the file dated 21 Mar 2025
Neilston 132kV Greener Grid Park
PRO-001343-1, NEILSTON ENERGY LIMITED
Neilston 400/275/132kV
Energy Storage System;Reactive Compensation
MW Effective From was 31 May 2024; blank in the file dated 21 Mar 2025
Neilston 132kV Greener Grid Park
PRO-001343-2, NEILSTON ENERGY LIMITED
Neilston 400/275/132kV
Energy Storage System;Reactive Compensation
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Alverdiscott
PRO-001344, XLINKS 1 LTD
Alverdiscott 400kV Substation
Interconnector
MW Effective From was 30 Aug 2030; blank in the file dated 21 Mar 2025
Alverdiscott 2
PRO-001345, XLINKS 1 LTD
Alverdiscott 400kV Substation
Interconnector
MW Effective From was 30 Aug 2032; blank in the file dated 21 Mar 2025
Glen Ullinish Extension
PRO-001346, GLEN ULLINISH WF 2 LTD
Glen Ullinish Extension 132/33kV Substation
Wind Onshore
MW Effective From was 1 Apr 2027; blank in the file dated 21 Mar 2025
Bridgwater 2 (tertiary) - New Conn
PRO-001347, BRIDGWATER GREEN LIMITED
Bridgewater 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Aug 2028; blank in the file dated 21 Mar 2025
Highview Hunterston East Cryobattery
PRO-001348, HVS SITEGO LTD
Hunterston East 400kV
Demand;Energy Storage System;Reactive Compensation
MW Effective From was 31 Oct 2027; blank in the file dated 21 Mar 2025
Drax
PRO-001355, ENSO GREEN HOLDINGS D LIMITED
Drax 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Oct 2029; blank in the file dated 21 Mar 2025
Axminster - New Connection
PRO-001356, ENSO GREEN HOLDINGS B LIMITED
Axminster 132kV Substation
Energy Storage System
MW Effective From was 30 Jun 2029; blank in the file dated 21 Mar 2025
Uskmouth - New Connection
PRO-001357, AW1 ENERGY STORAGE LIMITED
Uskmouth 275kV Substation
Energy Storage System
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Kingsnorth
PRO-001360, ENSO GREEN HOLDINGS G LIMITED
Kingsnorth 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Ratcliffe-on-Soar
PRO-001361, ENSO GREEN HOLDINGS C LIMITED
Ratcliffe-On-Soar 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jul 2029; blank in the file dated 21 Mar 2025
Strath Tirry
PRO-001363-1, Strath Tirry Wind Energy 2021 Ltd
Lairg GSP
Energy Storage System;Wind Onshore
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Strath Tirry
PRO-001363-2, Strath Tirry Wind Energy 2021 Ltd
Lairg GSP
Energy Storage System;Wind Onshore
MW Effective From was 30 Sep 2027; blank in the file dated 21 Mar 2025
Lethans Wind Farm
PRO-001367, BANKS RENEWABLES (LETHANS WIND FARM) LIMITED
Lethans 132kV Substation
Wind Onshore
MW Effective From was 30 Jun 2027; blank in the file dated 21 Mar 2025
Indian Queens Energy Centre
PRO-001371, IQ ENERGY CENTRE LIMITED
Indian Queens 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 May 2025; blank in the file dated 21 Mar 2025
Dogger Bank South East
PRO-001375-1, RWE Renewables UK Dogger Bank South (East) Limited
RWE North Sea Offshore Substation
Wind Offshore
MW Effective From was 30 Oct 2030; blank in the file dated 21 Mar 2025
Dogger Bank South East
PRO-001375-2, RWE Renewables UK Dogger Bank South (East) Limited
RWE North Sea Offshore Substation
Wind Offshore
MW Effective From was 30 Nov 2031; blank in the file dated 21 Mar 2025
Valorous Offshore Wind Farm
PRO-001383, BLUE GEM WIND LIMITED
Pembroke 400kV Substation
Wind Offshore
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Dogger Bank South West
PRO-001386-1, RWE RENEWABLES UK LIMITED
Wylfa 400kV Substation
Wind Offshore
MW Effective From was 30 Oct 2030; blank in the file dated 21 Mar 2025
Dogger Bank South West
PRO-001386-2, RWE RENEWABLES UK LIMITED
Wylfa 400kV Substation
Wind Offshore
MW Effective From was 30 Nov 2031; blank in the file dated 21 Mar 2025
Cloich Forest Wind Farm
PRO-001387, EDF ENERGY RENEWABLES LIMITED
Cloiche 132kV Substation
Wind Onshore
MW Effective From was 31 Jul 2029; blank in the file dated 21 Mar 2025
Glendye Wind Farm
PRO-001389, GLENDYE WIND FARM LIMITED
Glendye Wind Farm Substation
Wind Onshore
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Mona Offshore Wind Farm
PRO-001391, Mona Offshore Wind Limited
Bodelwyddan 400kV Substation
Wind Offshore
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Machair Offshore Wind Farm
PRO-001392, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Machair 275/66kV Offshore Substation
Wind Offshore
MW Effective From was 16 Sep 2033; blank in the file dated 21 Mar 2025
Net Zero Teesside Power Project
PRO-001400, NET ZERO TEESSIDE POWER LIMITED
Tod Point 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand
MW Effective From was 30 Jul 2027; blank in the file dated 21 Mar 2025
Cottam Solar PV + BESS
PRO-001401, COTTAM SOLAR PROJECT LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 1 Sep 2029; blank in the file dated 21 Mar 2025
Neilston Synchronous Compensation
PRO-001405, NEILSTON GRID SERVICES LIMITED
Neilston 400kV Substation
Reactive Compensation
MW Effective From was 31 Jul 2024; blank in the file dated 21 Mar 2025
OWF3
PRO-001406-1, SCOTTISHPOWER RENEWABLES (UK) LIMITED
OWF3 275/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
OWF3
PRO-001406-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
OWF3 275/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
Tangy IV WF
PRO-001408, SSE RENEWABLES SERVICES (UK) LIMITED
Tangy IV 132KV Substation
Wind Onshore
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Thurso South Synchronous Compensation
PRO-001415, THURSO GRID SERVICES LIMITED
Thurso GSP
Reactive Compensation
MW Effective From was 31 Oct 2023; blank in the file dated 21 Mar 2025
Alcemi Bramford Battery Energy Storage Facility
PRO-001416, ALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Bramford 400kV Substation
Energy Storage System
MW Effective From was 30 Oct 2030; blank in the file dated 21 Mar 2025
Neilston 400kV Greener Grid Park
PRO-001419, STATKRAFT UK LTD
Neilston 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From was 17 May 2027; blank in the file dated 21 Mar 2025
Lairg II Wind Farm
PRO-001434, ENERGYFARM UK LAIRG LLP
Lairg GSP
Wind Onshore
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
North East Offshore Wind Farm
PRO-001436, CALEDONIA OFFSHORE WIND FARM LIMITED
New Deer 2 400kV Substation
Wind Offshore
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
Norton PV and BESS
PRO-001437, Darlington Solar 1 Limited
Norton 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Gretna Synchronous Compensation
PRO-001444, GRETNA GRID SERVICES LIMITED
Gretna 400/132kV
Reactive Compensation
MW Effective From was 30 Sep 2024; blank in the file dated 21 Mar 2025
Rothienorman Sync Comp
PRO-001445, ROTHIENORMAN GRID SERVICES LIMITED
Rothienorman 400kV Substation
Reactive Compensation
MW Effective From was 31 Oct 2024; blank in the file dated 21 Mar 2025
Ackron Wind Farm
PRO-001446, ACKRON WIND FARM LTD
Dounreay GSP
Wind Onshore
MW Effective From was 31 Aug 2028; blank in the file dated 21 Mar 2025
Morecambe Offshore Wind Farm
PRO-001450, OFFSHORE WIND LIMITED
Penwortham 400kV Substation
Wind Offshore
MW Effective From was 30 Jun 2029; blank in the file dated 21 Mar 2025
Alcemi Devilla Battery Energy Storage Facility
PRO-001453, ALCEMI STORAGE DEVELOPMENTS 3 LIMITED
Longannet 275kV
Energy Storage System
MW Effective From was 30 Oct 2027; blank in the file dated 21 Mar 2025
Alcemi Coalburn Battery Energy Storage Facility
PRO-001459, ALCEMI STORAGE DEVELOPMENTS 4 LIMITED
Coalburn 400kV GIS Substation
Energy Storage System
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Ratcliffe EMERGE
PRO-001462, UNIPER UK LIMITED
Ratcliffe-On-Soar 132kV Substation
Waste
MW Effective From was 1 Jul 2024; blank in the file dated 21 Mar 2025
Didcot Battery
PRO-001468, DIDCOT BATTERY LIMITED
Didcot 400kV Substation
Demand;Energy Storage System
MW Effective From was 31 Oct 2025; blank in the file dated 21 Mar 2025
Eccles BESS
PRO-001470, WEAVER POWER LIMITED
Eccles 132/33kV
Energy Storage System
MW Effective From was 12 Apr 2026; blank in the file dated 21 Mar 2025
Pentland Floating Offshore Wind Farm
PRO-001472, HIGHLAND WIND LIMITED
OWF-100 Substation
Wind Offshore
MW Effective From was 31 Aug 2025; blank in the file dated 21 Mar 2025
Mon Solar Farm
PRO-001480, LIGHTSOURCE SPV 204 LIMITED
Wylfa South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Lamford Hill
PRO-001481, Benbrack Wind Farm Limited
Lamford Hill 132kV/33kV Substation
Wind Onshore
MW Effective From was 30 Oct 2026; blank in the file dated 21 Mar 2025
Thornton Facility
PRO-001484-1, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 25 Oct 2024; blank in the file dated 21 Mar 2025
Thornton Facility
PRO-001484-2, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 23 Oct 2026; blank in the file dated 21 Mar 2025
Thornton Facility
PRO-001484-3, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 27 Oct 2028; blank in the file dated 21 Mar 2025
Thornton Facility
PRO-001484-4, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 28 Nov 2031; blank in the file dated 21 Mar 2025
SSE Offshore 1
PRO-001488, SSE RENEWABLES OFFSHORE WINDFARM HOLDINGS LIMITED
SSE OFFSHORE 1 400/66KV OFFSHORE SUBSTATION
Wind Offshore
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
SSE Offshore 3
PRO-001489, SSE RENEWABLES OFFSHORE WINDFARM HOLDINGS LIMITED
SSE Offshore 3 220/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
Ourack Wind Farm
PRO-001490, OURACK WIND FARM LLP
Ourack Wind Farm 132/33 kV Substation
Energy Storage System;Wind Onshore
MW Effective From was 31 Oct 2030; blank in the file dated 21 Mar 2025
SSE Offshore 2
PRO-001491, SSE RENEWABLES OFFSHORE WINDFARM HOLDINGS LIMITED
SSE OFFSHORE 2 220/66KV OFFSHORE SUBSTATION
Wind Offshore
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Thainstone Energy Park
PRO-001493, AGILE ENERGY RECOVERY (INVERURIE) LIMITED
Kintore GSP
Waste
MW Effective From was 31 Jul 2023; blank in the file dated 21 Mar 2025
Bellrock Offshore Wind Farm
PRO-001496, BLUEFLOAT ENERGY UK HOLDINGS LIMITED
Lyra 320/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
Twyn Hywel Cillfynydd
PRO-001497, Twyn Hywel Energy Park Ltd
Cilfynydd 400kV Substation
Wind Onshore
MW Effective From was 31 Mar 2026; blank in the file dated 21 Mar 2025
Moelfre Energy Park
PRO-001500, MOELFRE ENERGY PARK LIMITED
Bodelwyddan 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Tealing Solar & Storage
PRO-001501, ECODEV GROUP LTD
Tealing IDNO 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Cottam
PRO-001502-1, GATE BURTON ENERGY PARK LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Cottam
PRO-001502-2, GATE BURTON ENERGY PARK LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 30 Jul 2030; blank in the file dated 21 Mar 2025
Rawhills Battery Energy Storage Facility
PRO-001503, ALCEMI STORAGE DEVELOPMENTS 6 LIMITED
Coalburn 400kV GIS Substation
Energy Storage System
MW Effective From was 16 Apr 2027; blank in the file dated 21 Mar 2025
Mwdwl Eithin Energy Park
PRO-001511, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
MW Effective From was 31 Oct 2026; blank in the file dated 21 Mar 2025
Salamander Offshore Wind Farm
PRO-001512, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead GSP
Wind Offshore
MW Effective From was 31 Oct 2029; blank in the file dated 21 Mar 2025
Eaton Socon Solar
PRO-001513, BROCKWELL STORAGE & SOLAR LIMITED
Eaton Socon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Morven A Offshore Wind Farm (Prev Phoenix 1A)
PRO-001515, Morven Offshore Wind Limited
Phoenix 1A 275/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2031; blank in the file dated 21 Mar 2025
Slickly Wind Farm
PRO-001517, Slickly Wind Farm Limited
Slickly Wind Farm 132kV Substation
Wind Onshore
MW Effective From was 31 Oct 2028; blank in the file dated 21 Mar 2025
Phoenix 1B Offshore Wind Farm
PRO-001519, BP ALTERNATIVE ENERGY INVESTMENTS LIMITED
Phoenix 1B 275/66kV Offshore Substation
Wind Offshore
MW Effective From was 31 Oct 2033; blank in the file dated 21 Mar 2025
Showing 400 of 1,631.
Capacity up 7
Ratcliffe on Soar
PRO-000050, UNIPER UK LIMITED
Ratcliffe-On-Soar 400kV Substation
OCGT (Open Cycle Gas Turbine)
Cumulative Total Capacity changed from 1,224.7 MW to 2,021 MW (+796.3 MW)
One Earth Solar Farm
PRO-001599, ONE EARTH SOLAR FARM LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 500 MW to 740 MW (+240 MW)
Dunlaw Extension
PRO-000061, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dunlaw Extension 132/33kV
Wind Onshore
Cumulative Total Capacity changed from 29.75 MW to 156 MW (+126.25 MW)
Spittal BESS
PRO-003255, FIELD DEVCO LTD
Spittal 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 200 MW to 300 MW (+100 MW)
Beaw Field Wind Farm
PRO-000026, BEAW FIELD SHETLAND LIMITED
Beaw Field 132/33kV Substation
Wind Onshore
Cumulative Total Capacity changed from 72 MW to 102 MW (+30 MW)
Bridgwater 2 (tertiary) - New Conn
PRO-001347, BRIDGWATER GREEN LIMITED
Bridgewater 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 54 MW to 57 MW (+3 MW)
Sundon
PRO-001132, SUNDON BATTERY STORAGE LIMITED
Sundon 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 49.5 MW to 50 MW (+0.5 MW)
Capacity down 10
Hinkley Point B
PRO-000141, EDF ENERGY NUCLEAR GENERATION LIMITED
Hinkley Point 400kV Substation
Nuclear
Cumulative Total Capacity changed from 1,061 MW to 0 MW (−1,061 MW)
Hunterston
PRO-000143, EDF ENERGY NUCLEAR GENERATION LIMITED
Hunterston 400/132kV
Nuclear
Cumulative Total Capacity changed from 1,020 MW to 0 MW (−1,020 MW)
Immingham
PRO-000053, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Cumulative Total Capacity changed from 1,268 MW to 1,218 MW (−50 MW)
Merthyr Solar and Battery
PRO-002757-2, E.E.W. ECO ENERGY WORLD DEVELOPMENT HOLDING LIMITED
Cilfynydd 400kV Substation
PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 220 MW to 175 MW (−45 MW)
Zenobe Hartmoor BESS
PRO-003696, ZENOBE ENERGY LIMITED
Hartmoor 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 330 MW to 300 MW (−30 MW)
Zenobe Spennymoor BESS
PRO-003692, ZENOBE ENERGY LIMITED
Spennymoor 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 330 MW to 300 MW (−30 MW)
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
Cumulative Total Capacity changed from 51.2 MW to 45 MW (−6.2 MW)
Mannington
PRO-001091, PIVOTED POWER LLP
Mannington 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 49.9 MW to 47.5 MW (−2.4 MW)
Lakeside Energy Drax
PRO-001522, LAKESIDE ENERGY STORAGE LIMITED
Drax 132kV Substation
Energy Storage System
Cumulative Total Capacity changed from 99.9 MW to 99 MW (−0.9 MW)
Spennymoor BESS
PRO-002035, CSE27 LIMITED
Spennymoor 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 50 MW to 49.9 MW (−0.1 MW)
Project status changed 14
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
Project Status changed from Under Construction/Commissioning to Built
Sunnica
PRO-000393, SUNNICA LIMITED
Burwell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Bramford Tertiary
PRO-000397, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Loch na Cathrach Pumped Storage Hydro
PRO-000570-1, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
Project Status changed from Scoping to Consents Approved
Loch na Cathrach Pumped Storage Hydro
PRO-000570-2, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
Project Status changed from Scoping to Consents Approved
Bramford (Tertiary)
PRO-001016, DAMSONGREEN ENERGYFARM LIMITED
Bramford 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Built
Fleet (Tertiary)
PRO-001087, CSE23 LIMITED
Fleet 400kV Substation
PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Hollandmey Renewable Energy Development
PRO-001094, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Hollandmey Renewable Energy Development132/33kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Roaring Hill Energy Storage Facility
PRO-001272, ROARING HILL ENERGY STORAGE LTD
Glenrothes GSP
Energy Storage System
Project Status changed from Scoping to Built
Rothienorman Sync Comp
PRO-001445, ROTHIENORMAN GRID SERVICES LIMITED
Rothienorman 400kV Substation
Reactive Compensation
Project Status changed from Consents Approved to Built
Hinkley Point C
PRO-001674-1, NNB GENERATION COMPANY (HPC) LIMITED
Hinkley Point 400kV Substation
Nuclear
Project Status changed from Under Construction/Commissioning to Scoping
Hinkley Point C
PRO-001674-2, NNB GENERATION COMPANY (HPC) LIMITED
Hinkley Point 400kV Substation
Nuclear
Project Status changed from Under Construction/Commissioning to Scoping
Chapel Farm Battery Storage Project
PRO-001786, HARMONY CF LIMITED
Sundon GSP
Energy Storage System
Project Status changed from Consents Approved to Built
Shaftesbury Energy Park
PRO-002167, TAGENERGY DEVELOPMENT UK LIMITED
Shaftesbury 132kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved

By plant type

Plant typeProjects with a changeNewBack on the registerRemovedNet capacity change
Energy Storage System6462917+7,381.4 MW
Energy Storage System;PV Array (Photo Voltaic/solar)44517415+3,715.4 MW
Wind Onshore2121003+516.8 MW
Wind Offshore102112−1,610 MW
Energy Storage System;Wind Onshore711100+1,387.6 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore33500+1,730.3 MW
PV Array (Photo Voltaic/solar)33000−45 MW
Energy Storage System;Reactive Compensation200000 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation19100+550 MW
Pump Storage16100+1,800 MW
Reactive Compensation16002−1 MW
CCGT (Combined Cycle Gas Turbine)150000 MW
Demand;Energy Storage System150000 MW
Tidal13301+490 MW
Energy Storage System;Gas Reciprocating8401+2,836 MW
Nuclear8000−2,081 MW
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)7201+1,999 MW
Energy Storage System;OCGT (Open Cycle Gas Turbine)70000 MW
Demand;PV Array (Photo Voltaic/solar)60000 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore6100+1,000 MW
Demand;Wind Offshore5201+560 MW
Gas Reciprocating50000 MW
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System40000 MW
CCGT (Combined Cycle Gas Turbine);Energy Storage System40000 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation40000 MW
Energy Storage System;Wind Offshore40000 MW
OCGT (Open Cycle Gas Turbine)4000+796.3 MW
CCGT (Combined Cycle Gas Turbine);Demand30000 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)30000 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore30000 MW
Thermal30000 MW
Waste30000 MW
Biomass20000 MW
CHP (Combined Heat and Power);Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore2100+450 MW
Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore2100+100 MW
Demand;Wind Onshore20000 MW
Hydro2000−6.2 MW
Interconnector20000 MW
PV Array (Photo Voltaic/solar);Wind Onshore20000 MW
CHP (Combined Heat and Power)10000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 40 of 47.

By connection site

Connection siteProjects with a changeNewBack on the registerRemovedNet capacity change
Alverdiscott 400kV Substation240000 MW
Cilfynydd 400kV Substation11000−45 MW
Thornton 400kV Substation11001−330 MW
Bolney 400kV Substation100000 MW
Melksham 400kV Substation10012−106.9 MW
Navenby 400kV Substation10100+300 MW
Necton 400kV Substation100000 MW
Pont Abraham GSP90000 MW
Warley 275kV Substation90000 MW
Bicker Fen 400kV Substation80000 MW
Connah's Quay 400kV Substation8301+490 MW
Cottam 400kV Substation80000 MW
Drakelow 400kV Substation80000 MW
Feckenham 400kV Substation80000 MW
Minety 400kV Substation80000 MW
Norwich Main 400kV Substation80000 MW
Swansea North 400kV Substation80000 MW
Wymondley 400kV Substation80000 MW
Biggleswade 400kV Substation70000 MW
Bodelwyddan 400kV Substation70000 MW
Bramford 400kV Substation70000 MW
Didcot 400kV Substation70000 MW
Exeter 400kV Substation7201+57 MW
Fleet 400kV Substation70000 MW
Harker 400kV Substation70000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 906.

Earlier comparisons

Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.