Rugeley (RUGELEY POWER GENERATION LIMITED)

Developer as published, connection site, reference: RUGELEY POWER GENERATION LIMITED. Rugeley 400kV Substation (NGET). PRO-000209.

Sign in to watch this project
Capacity50 MWBattery storage
Connection date30 Oct 2032Status as printed: Scoping
MW ahead in N84's order at this site600 MWcalculated by N84

Connection date, edition by edition

20322033File dated 2024-09-27: connection date 2032-10-30Oct 2032File dated 2026-10-20: connection date 2032-10-3027 Sep202420 Oct2026
20322033File dated 2024-09-27: connection date 2032-10-30Oct 2032File dated 2026-10-20: connection date 2032-10-3027 Sep202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 27 Sep 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Technology printed as Energy Storage System (previous file: Coal). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedCoal → Energy Storage SystemReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1783Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1757