N84 Grid

Dogger Bank South West (was Irish Sea)

Developer as published, connection site, reference: RWE RENEWABLES UK LIMITED. Birkhill Wood 400kV Substation (NGET). PRO-001386.

Sign in to watch this project
Capacity1,450 MWOffshore wind
Connection date30 Nov 2031Status as printed: Scoping
First date seen 1 Apr 2033, difference -488 dayscalculated by N84
MW ahead in N84's order at this site400 MWcalculated by N84

Connection date, edition by edition

20312032File dated 2024-05-31: connection date 2031-11-30Nov 2031File dated 2024-09-27: connection date 2031-11-3031 May202427 Sep2024
20312032File dated 2024-05-31: connection date 2031-11-30Nov 2031File dated 2024-09-27: connection date 2031-11-3031 May202427 Sep2024

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 27 Sep 2024. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.