Developer as published, connection site, reference: UK UTILITY RESERVE LIMITED. Willington 400kV Substation (NGET). PRO-000120.

Sign in to watch this project
Capacity162 MWGas
Connection date1 Apr 2024Status as printed: Built
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20242025File dated 2024-05-31: connection date 2024-04-01Apr 2024File dated 2026-10-20: connection date 2024-04-0131 May202420 Oct2026
20242025File dated 2024-05-31: connection date 2024-04-01Apr 2024File dated 2026-10-20: connection date 2024-04-0131 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.