N84 Grid

Lochay (Part of Killin Cascade Hydro Scheme)

Developer as published, connection site, reference: SSE GENERATION LIMITED. Lochay GSP (SHET). PRO-000174.

Sign in to watch this project
Capacity51.2 MWHydro and pumped storage
Connection date1 Jan 2027Status as printed: Under Construction/Commissioning
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20272028File dated 2024-05-31: connection date 2027-01-01Jan 2027File dated 2025-03-21: connection date 2027-01-0131 May202421 Mar2025
20272028File dated 2024-05-31: connection date 2027-01-01Jan 2027File dated 2025-03-21: connection date 2027-01-0131 May202421 Mar2025

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 21 Mar 2025. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.