Medway Power Station

Developer as published, connection site, reference: MEDWAY POWER LIMITED. Grain 400kV Substation (NGET). PRO-000203.

Sign in to watch this project
Capacity910 MWGas
Connection date30 Oct 2028Status as printed: Built
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20282029File dated 2024-05-31: connection date 2028-10-30Oct 2028File dated 2026-10-20: connection date 2028-10-3031 May202420 Oct2026
20282029File dated 2024-05-31: connection date 2028-10-30Oct 2028File dated 2026-10-20: connection date 2028-10-3031 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data