Whitegate Tertiary Connection

Developer as published, connection site, reference: HD144WHI LTD. Whitegate 275kV Substation (NGET). PRO-000512.

Sign in to watch this project
Capacity57 MWBattery storage
Connection datenot statedStatus as printed: Built
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

No date history to draw

The files N84 holds in your history window print no connection date for this project.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Printed as connected: 57 MW. Status as printed: Built (previous file: Consents Approved). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 2143Receipt: NESO TEC Register, file dated 11 Sep 2026, row 2114
  2. 20 Oct 2026. MW Effective From printed as blank (previous file: 30 Jun 2024). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 2143Receipt: NESO TEC Register, file dated 11 Sep 2026, row 2114
  3. 20 Oct 2026. Connected capacity printed as 57 (previous file: 0). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was imported0 → 57Receipt: NESO TEC Register, file dated 20 Oct 2026, row 2143Receipt: NESO TEC Register, file dated 11 Sep 2026, row 2114

Supported by National Energy SO Open Data