Glendye Wind Farm (GLENDYE WIND FARM LIMITED)

Developer as published, connection site, reference: GLENDYE WIND FARM LIMITED. Glendye Wind Farm Substation (SHET). PRO-001389.

Sign in to watch this project
Capacity166.8 MWOnshore wind
Connection date30 Apr 2034Status as printed: Scoping
First date seen 31 Oct 2028, difference +2007 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20342035File dated 2024-05-31: connection date 2034-04-30Apr 2034File dated 2025-03-21: connection date 2034-04-3031 May202421 Mar2025
20342035File dated 2024-05-31: connection date 2034-04-30Apr 2034File dated 2025-03-21: connection date 2034-04-3031 May202421 Mar2025

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 21 Mar 2025. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.