Queue movers: the TEC Register, edition by edition

What changed between consecutive editions of NESO's Transmission Entry Capacity (TEC) Register, as printed. Supported by National Energy SO Open Data.

File dated 22 Jul 2025compared withFile dated 27 Mar 2026How the files are matchedThe file dated 22 Jul 2025 is an archived copy (Internet Archive), not a file N84 collected from NESO.

N84 holds no copy between 22 Jul 2025 and 27 Mar 2026; each change below happened at some point in that time, not necessarily this week. Wide comparisons

Changes between the two files

2,292 changesacross 2,006 projects. Net change −48.59 GW (new, left the register and capacity changes), plus 12.96 GW back on the register after being absent from the archived copy dated 22 Jul 2025 (Internet Archive).
Rows matched on Project Number. "Back on the register": absent from the previous file N84 holds, printed again in this one. Net change calculated by N84 from Cumulative Total Capacity as printed. NESO TEC Register, files dated 22 Jul 2025 and 27 Mar 2026. Supported by National Energy SO Open Data.
Table view
Changes by type
TypeChanges
Connection date added or removed1843
Status, stage or gate changed283
Left the register99
Back on the register26
New on the register23
Capacity changed18

Capacity in and out

TEC file dated 27 Mar 2026 against 22 Jul 2025 (archived copy)

New: +9.1 GW+9.1 GWNewCapacity up: +5.0 GW+5.0 GWCapacity upCapacity down: −1.5 GW−1.5 GWCapacity downRemoved: −61.2 GW−61.2 GWRemovedNet: 48.6 GW48.6 GWNet
New: +9.1 GW+9.1 GWNewCapacity up: +5.0 GW+5.0 GWCapacityupCapacity down: −1.5 GW−1.5 GWCapacitydownRemoved: −61.2 GW−61.2 GWRemovedNet: 48.6 GW48.6 GWNet

Not in the chart: 12.96 GW across 26 projects back on the register, absent from the archived copy dated 22 Jul 2025 (Internet Archive) and printed again in the file dated 27 Mar 2026. See them

NESO TEC Register, files dated 22 Jul 2025 and 27 Mar 2026. Supported by National Energy SO Open Data. Capacity is Cumulative Total Capacity as printed.
Table view
Capacity in and out
StepMW
New+9,096.3
Capacity up+5,028
Capacity down−1,519.6
Removed−61,198.6
Net48,594
Back on the register (not in the net)12,959.6

Data centres in the pipeline

30 sites

Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.

See every site

Every change, in full

Every change between the two files, grouped by type
ProjectConnection siteWhat the files print
New on the register 23
Dersalloch Wind Farm Extension
PRO-000412, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dersalloch 132/33kV
Energy Storage System;Wind Onshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 85 MW in the file dated 27 Mar 2026
Limekiln
PRO-000515-1, Limekiln Extension Limited
Limekilns 132/33kV substation
Energy Storage System;Wind Onshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 106 MW in the file dated 27 Mar 2026
Limekiln
PRO-000515-2, Limekiln Extension Limited
Limekilns 132/33kV substation
Energy Storage System;Wind Onshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 167 MW in the file dated 27 Mar 2026
North East Offshore Wind Farm
PRO-001436-1, CALEDONIA OFFSHORE WIND FARM LIMITED
Greens 400kV Substation
Wind Offshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 27 Mar 2026
North East Offshore Wind Farm
PRO-001436-2, CALEDONIA OFFSHORE WIND FARM LIMITED
Greens 400kV Substation
Wind Offshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 2,000 MW in the file dated 27 Mar 2026
Zenobe Stalybridge Project
PRO-001940-1, ZENOBE STALYBRIDGE LIMITED
Stalybridge 275kV Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 27 Mar 2026
Zenobe Stalybridge Project
PRO-001940-2, ZENOBE STALYBRIDGE LIMITED
Stalybridge 275kV Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 27 Mar 2026
Elmya Melbourne BESS
PRO-002424-1, ELMYA RPC UK MELBOURNE LIMITED
Thornton 400kV Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 252 MW in the file dated 27 Mar 2026
Elmya Melbourne BESS
PRO-002424-2, ELMYA RPC UK MELBOURNE LIMITED
Thornton 400kV Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 27 Mar 2026
Andrew BESS
PRO-003766, Apatura Battery Ltd
Andrew BESS 132kV Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 27 Mar 2026
High Bardrain Wood & Moor
PRO-003792, Bluestone Energy Ltd
Neilston 400kV Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 27 Mar 2026
North-East Offshore Hybrid Asset
PRO-004942, National Grid Interconnector Holdings Limited
Kintore GSP
Interconnector;Wind Offshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 1,800 MW in the file dated 27 Mar 2026
UK057-B Whatton Estate
PRO-005079, ENIF BESS LIMITED
Ratcliffe GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 130 MW in the file dated 27 Mar 2026
Balgray Wind Farm
PRO-005816, FRED. OLSEN RENEWABLES LIMITED
Gretna 400/132kV
Energy Storage System;Wind Onshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 43.2 MW in the file dated 27 Mar 2026
Derwent Solar 2
PRO-005908, Derwent Solar 2 Limited
Osbaldwick GSP
PV Array (Photo Voltaic/solar)
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 27 Mar 2026
Kenwick Solar
PRO-005989, ANESCO LIMITED
Shrewsbury 400kV Substation
PV Array (Photo Voltaic/solar)
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 430.85 MW in the file dated 27 Mar 2026
Galileo 14 Ltd
PRO-006019, GALILEO 14 LIMITED
Staffordshire Connection Node C 400Kv Substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 27 Mar 2026
Brentford (SSEN-FBT624) -120MW BESS
PRO-006042, Lightsource Renewable UK Development Limited
West London Connection Node B 132kV substation
Energy Storage System
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 120 MW in the file dated 27 Mar 2026
Glenmoy Wind Solar & BESS
PRO-006134, Galileo 20 Limited
Alyth 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 224 MW in the file dated 27 Mar 2026
Indaver Rivenhall IWMF
PRO-006457, INDAVER RIVENHALL LIMITED
Braintree GSP
Waste
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 55 MW in the file dated 27 Mar 2026
Frome Valley Energy Park
PRO-006617, BIOSOUTH ENERGY LIMITED
Chickerell 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 43.2 MW in the file dated 27 Mar 2026
Wilton CCGT Project 1
PRO-006733, SEMBCORP UTILITIES (UK) LIMITED
Greystones B 275kV Substation
CCGT (Combined Cycle Gas Turbine)
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 850 MW in the file dated 27 Mar 2026
Wilton CCGT Project 2
PRO-006735, SEMBCORP UTILITIES (UK) LIMITED
Greystones A 275kV Substation
CCGT (Combined Cycle Gas Turbine)
Not in the file dated 22 Jul 2025 or any earlier file N84 holds; printed with 700 MW in the file dated 27 Mar 2026
Back on the register 26
Glenchamber Wind Farm
PRO-000043, GLENCHAMBER WIND ENERGY LIMITED
Glenluce 132/33kV
Wind Onshore
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 27.5 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Uskmouth
PRO-000220, USKMOUTH ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 349.9 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 31 May 2024
Carrington
PRO-000276, Carrington Storage Limited
Carrington 400KV Substation
CCGT (Combined Cycle Gas Turbine)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 680 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 31 May 2024
Sofia Offshore Wind Farm
PRO-000404, SOFIA OFFSHORE WIND FARM LIMITED
Lackenby 400kV Substation
Wind Offshore
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 1,320 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 31 May 2024
North Kyle New Cumnock
PRO-000474, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV Substation
Energy Storage System;Wind Onshore
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 212 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 20 Dec 2024
Wilton Lion BESS
PRO-001048, SEMBCORP UTILITIES (UK) LIMITED
Greystones A 275kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 150 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 31 May 2024
Longfield Solar
PRO-001053, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 500 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Neilston 132
PRO-001343, NEILSTON ENERGY LIMITED
Neilston 132kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 150 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 31 May 2024
Mwdwl Eithin Energy Park
PRO-001511, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 81.2 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Salamander Offshore Wind Farm
PRO-001512, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead 132KV Substation
Energy Storage System;Wind Offshore
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 200 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Morgan Offshore Wind Farm
PRO-001594, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 1,500 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
SSE Ferrybridge BESS
PRO-001614, SSE FERRYBRIDGE BATTERY LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 150 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Staythorpe (BESS and PV)
PRO-001615, SSE STAYTHORPE POWER LIMITED
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 437 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Ironbridge
PRO-001629, IGP SOLAR 16 LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 600 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Penwortham Green Energy Centre
PRO-001694, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 600 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 31 May 2024
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762, SSE FIDDLERS FERRY BATTERY LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 150 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Kearsley North Green Energy Centre
PRO-001793, Kearsley North Green NG Limited
Kearsley 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 400 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Penwortham BESS
PRO-001804, PENWORTHAM (BES) LTD
Penwortham 400kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 57 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Kirkby Green Energy Centre
PRO-001869, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 400 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Daines Green Energy Centre
PRO-001902, DAINES GREEN NG LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 480 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Bicker Fenn Energy Park
PRO-001984, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 600 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Daines BESS
PRO-002050, SSE DAINES BESS LIMITED
Daines 400kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 600 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Ocker Hill - Gresham House
PRO-002213, Ocker Hill Storage Limited
Ocker Hill 275kV Substation
Energy Storage System
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 240 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Mablethorpe Green Energy Centre
PRO-002255, MABLETHORPE NG LIMITED
Mablethorpe 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 1,025 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Hawthorn Pit Green Energy Centre
PRO-002282, HAWTHORN PIT NG LIMITED
Hawthorn Pit 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 1,025 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Pentir Green Energy Centre
PRO-002345, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 22 Jul 2025 (archived copy); printed again with 1,025 MW in the file dated 27 Mar 2026. Last printed before that in the file dated 21 Mar 2025
Removed from the register 99
Glenchamber Wind Farm
PRO-000043-1, GLENCHAMBER WIND ENERGY LIMITED
Glenluce 132/33kV
Wind Onshore
Printed with 25.3 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Glenchamber Wind Farm
PRO-000043-2, GLENCHAMBER WIND ENERGY LIMITED
Glenluce 132/33kV
Wind Onshore
Printed with 27.5 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Immingham
PRO-000053-1, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Printed with 1,268 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Immingham
PRO-000053-2, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Printed with 1,318 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Uskmouth
PRO-000220-1, USKMOUTH ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
Printed with 230 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Uskmouth
PRO-000220-2, USKMOUTH ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
Printed with 349.9 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Carrington
PRO-000276-1, Carrington Storage Limited
Carrington 400KV Substation
CCGT (Combined Cycle Gas Turbine)
Printed with 1,040 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Carrington
PRO-000276-2, Carrington Storage Limited
Carrington 400KV Substation
CCGT (Combined Cycle Gas Turbine)
Printed with 2,080 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
West Burton B
PRO-000369-3, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
Printed with 1,881 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Sofia Offshore Wind Farm
PRO-000404-1, SOFIA OFFSHORE WIND FARM LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
Printed with 0 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
North Kyle New Cumnock
PRO-000474-1, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV Substation
Energy Storage System;Wind Onshore
Printed with 79 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
North Kyle New Cumnock
PRO-000474-2, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV Substation
Energy Storage System;Wind Onshore
Printed with 212 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Limekiln
PRO-000515, Limekiln Extension Limited
Limekilns 132/33kV substation
Wind Onshore
Printed with 106 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Armadale Wind Farm
PRO-000557, WIND DEVELOPMENT HOLDINGS LIMITED
Armadale 400kv Substation
Energy Storage System;Wind Onshore
Printed with 99 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
OWPL Windfarm
PRO-000568-3, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
Printed with 1,500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
OWPL Windfarm
PRO-000568-4, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
Printed with 2,250 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Ferrybridge D
PRO-001020-4, KEADBY GENERATION LIMITED
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;OCGT (Open Cycle Gas Turbine);Hydrogen
Printed with 1,420 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tees CCPP
PRO-001048-1, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tees CCPP
PRO-001048-2, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 360 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tees CCPP
PRO-001048-3, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 700 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tees CCPP
PRO-001048-4, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 1,190 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tees CCPP
PRO-001048-5, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 1,465 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tees CCPP
PRO-001048-6, SEMBCORP UTILITIES (UK) LIMITED
Greystones A and B 275kV Substations
Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 1,700 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Longfield Solar
PRO-001053-1, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Longfield Solar
PRO-001053-2, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Airtnoch BESS
PRO-001107, TURBINE MARKETING SPV LIMITED
Whitelee Extension 275/33kV
PV Array (Photo Voltaic/solar)
Printed with 89 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Neilston 132kV Greener Grid Park
PRO-001343-1, NEILSTON ENERGY LIMITED
Neilston 400/275/132kV
Energy Storage System
Printed with 50 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Neilston 132kV Greener Grid Park
PRO-001343-2, NEILSTON ENERGY LIMITED
Neilston 400/275/132kV
Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
North East Offshore Wind Farm
PRO-001436, CALEDONIA OFFSHORE WIND FARM LIMITED
New Deer 2 400kV Substation
Wind Offshore
Printed with 2,000 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Green Volt Offshore Windfarm
PRO-001469-3, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Printed with 300 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Green Volt Offshore Windfarm
PRO-001469-4, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Printed with 560 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Mwdwl Eithin Energy Park
PRO-001511-1, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
Printed with 81.2 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Mwdwl Eithin Energy Park
PRO-001511-2, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
Printed with 81.2 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Salamander Offshore Wind Farm
PRO-001512-1, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead GSP
Energy Storage System;Wind Offshore
Printed with 200 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Salamander Offshore Wind Farm
PRO-001512-2, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead GSP
Energy Storage System;Wind Offshore
Printed with 200 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
EOLFI Offshore
PRO-001538, Shell New Energies UK Ltd
Eolfi Offshore Substation
Wind Offshore
Printed with 3,000 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Morgan Offshore Wind Farm
PRO-001594-1, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Printed with 1,500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Morgan Offshore Wind Farm
PRO-001594-2, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Printed with 1,500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Morgan Offshore Wind Farm
PRO-001594-3, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Printed with 1,500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
SSE Ferrybridge BESS
PRO-001614-1, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
SSE Ferrybridge BESS
PRO-001614-2, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
SSE Ferrybridge BESS
PRO-001614-3, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Staythorpe (BESS and PV)
PRO-001615-1, SSE STAYTHORPE POWER LIMITED
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 437 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Zenobe Blackhillock 300 MW
PRO-001624-3, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Printed with 720 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Ironbridge
PRO-001629-1, IGP SOLAR 16 LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Ironbridge
PRO-001629-2, IGP SOLAR 16 LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Flash Solar Farm
PRO-001634-3, ELEMENTS GREEN TRENT LTD
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 800 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Flash Solar Farm
PRO-001634-4, ELEMENTS GREEN TRENT LTD
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 800 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Legacy Green Energy Centre
PRO-001662-3, LEGACY GREEN ENERGY LIMITED
Legacy 400kV Substation
Energy Storage System
Printed with 1,200 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Drakelow Green Energy Centre
PRO-001693-3, DRAKELOW GREEN ENERGY LIMITED
Drakelow 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Penwortham Green Energy Centre
PRO-001694-1, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Penwortham Green Energy Centre
PRO-001694-2, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Penwortham Green Energy Centre
PRO-001694-3, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Penwortham Green Energy Centre
PRO-001694-4, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Harker Green Energy Centre
PRO-001709-3, Blackdyke BESS Limited
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Harker Green Energy Centre
PRO-001709-4, Blackdyke BESS Limited
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762-1, SSE UTILITY SOLUTIONS LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762-2, SSE UTILITY SOLUTIONS LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Hams Hall Green Energy Centre
PRO-001765-3, HAMS HALL GREEN ENERGY LIMITED
Hams Hall 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Afon Ddaw
PRO-001775-2, LIGHTSOURCE SPV 214 LIMITED
Aberthaw 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 249 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Kearsley North Green Energy Centre
PRO-001793-1
Kearsley 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Kearsley North Green Energy Centre
PRO-001793-2
Kearsley 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Penwortham BESS
PRO-001804-1, PENWORTHAM (BES) LTD
Penwortham 400kV Substation
Energy Storage System
Printed with 57 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Penwortham BESS
PRO-001804-2, PENWORTHAM (BES) LTD
Penwortham 400kV Substation
Energy Storage System
Printed with 57 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Kirkby Green Energy Centre
PRO-001869-1, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Kirkby Green Energy Centre
PRO-001869-2, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Kirkby Green Energy Centre
PRO-001869-3, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Daines Green Energy Centre
PRO-001902-1, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 480 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Daines Green Energy Centre
PRO-001902-2, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 480 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Daines Green Energy Centre
PRO-001902-3, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 480 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Zenobe Stalybridge Project
PRO-001940, Zenobe Energy Limited
Stalybridge 275kV Substation
Energy Storage System
Printed with 150 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Bicker Fenn Energy Park
PRO-001984-1, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Bicker Fenn Energy Park
PRO-001984-2, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Bicker Fenn Energy Park
PRO-001984-3, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Daines BESS
PRO-002050-1, SSE DAINES BESS LIMITED
Daines 400kV Substation
Energy Storage System
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Daines BESS
PRO-002050-2, SSE DAINES BESS LIMITED
Daines 400kV Substation
Energy Storage System
Printed with 600 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Ocker Hill - Gresham House
PRO-002213-1, Ocker Hill Storage Limited
Ocker Hill 275kV Substation
Energy Storage System
Printed with 240 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Ocker Hill - Gresham House
PRO-002213-2, Ocker Hill Storage Limited
Ocker Hill 275kV Substation
Energy Storage System
Printed with 240 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Mablethorpe Green Energy Centre
PRO-002255-1, MABLETHORPE GREEN ENERGY CENTRE LIMITED
Mablethorpe 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Mablethorpe Green Energy Centre
PRO-002255-2, MABLETHORPE GREEN ENERGY CENTRE LIMITED
Mablethorpe 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Hawthorn Pit Green Energy Centre
PRO-002282-1, INNOVA RENEWABLES LIMITED
Hawthorn Pit 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Hawthorn Pit Green Energy Centre
PRO-002282-2, INNOVA RENEWABLES LIMITED
Hawthorn Pit 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Waternish Wind Farm Substaion
PRO-002295, WIND DEVELOPMENT HOLDINGS LIMITED
Waternish Wind Farm 12KV Substation
Wind Onshore
Printed with 81.6 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Pentir Green Energy Centre
PRO-002345-1, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Pentir Green Energy Centre
PRO-002345-2, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Scottish Water Airdrie STW 60MW BESS
PRO-002407, Bluestone Energy Ltd
Coatbridge GSP
Energy Storage System
Printed with 45 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Elmya Melbourne BESS
PRO-002424, ELMYA RPC UK MELBOURNE LIMITED
Thornton 400kV Substation
Energy Storage System
Printed with 300 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Tealing BESS (100MW)
PRO-002436, GPC 1039 Ltd
Tealing 132kV Substation
Energy Storage System
Printed with 100 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
SPITTAL MAINS BATTERY ENERGY STORAGE
PRO-002523, WRE Broomhill Limited
Spittal 275kV Substation
Energy Storage System
Printed with 200 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Waltham Cross Farm 2
PRO-002748-2, Waltham Cross 7 Renewables Limited
Waltham Cross B 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Isenau Two
PRO-003091, Isenau Energy Storage Resources Two Limited
Tealing 132kV Substation
Energy Storage System
Printed with 249.9 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Shropshire Energy Park
PRO-003172, LOW CARBON SOLAR PARK 34 LIMITED
Shrewsbury 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 500 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Isenau Five
PRO-003190, Isenau Energy Storage Resources Five Limited
Tealing 132kV Substation
Energy Storage System
Printed with 50 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Malcolmwood Farm BESS
PRO-003195, Bluestone Energy Ltd
Clydesmill 275/33kV
Energy Storage System
Printed with 60 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Summerston PV 50MW
PRO-003199, Bluestone Energy Ltd
Killermont 132/33kV
PV Array (Photo Voltaic/solar)
Printed with 100 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Heysham 200MW BESS
PRO-003544, Decerna Limited
Heysham 132kV Substation
Energy Storage System
Printed with 200 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
White Cairns BESS
PRO-004219, CBS ENERGY STORAGE ASSETS UK LIMITED
Peterhead 275kV
Energy Storage System
Printed with 400 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
UK057-B Whatton Estate
PRO-005079-1, ENIF BESS LIMITED
Ratcliffe GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 130 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
UK057-B Whatton Estate
PRO-005079-2, ENIF BESS LIMITED
Ratcliffe GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 130 MW in the file dated 22 Jul 2025; not in the file dated 27 Mar 2026
Connection date added 1,843
Arecleoch
PRO-000012-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Arecleoch 132/33kV
Wind Onshore
MW Effective From printed as 15 Jun 2032; blank in the file dated 22 Jul 2025
Beaw Field Wind Farm
PRO-000026, BEAW FIELD SHETLAND LIMITED
Beaw Field 132/33kV Substation
Wind Onshore
MW Effective From printed as 29 Oct 2032; blank in the file dated 22 Jul 2025
Blacklaw
PRO-000036-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Blacklaw 132/33kV
Energy Storage System;Wind Onshore
MW Effective From printed as 8 Oct 2032; blank in the file dated 22 Jul 2025
Clashindarroch 2
PRO-000041, VATTENFALL WIND POWER LTD
Cairnford GSP
Energy Storage System;Wind Onshore
MW Effective From printed as 31 Aug 2026; blank in the file dated 22 Jul 2025
Gateway Energy Centre Power Station
PRO-000045-1, GATEWAY ENERGY CENTRE LIMITED
Coryton South 400kV Substation
Energy Storage System
MW Effective From printed as 30 Jun 2029; blank in the file dated 22 Jul 2025
Gateway Energy Centre Power Station
PRO-000045-2, GATEWAY ENERGY CENTRE LIMITED
Coryton South 400kV Substation
Energy Storage System
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
Dunlaw Extension
PRO-000061, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dunlaw Extension 132/33kV
Wind Onshore
MW Effective From printed as 1 Apr 2032; blank in the file dated 22 Jul 2025
Harestanes
PRO-000064-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Harestanes West Wind Farm 132/33kV
Energy Storage System;Wind Onshore
MW Effective From printed as 31 Mar 2028; blank in the file dated 22 Jul 2025
Kilgallioch Wind Farm
PRO-000065-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Kilgallioch 275kV Substation
Wind Onshore
MW Effective From printed as 8 Apr 2025; blank in the file dated 22 Jul 2025
Whitelee
PRO-000067-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Wind Onshore
MW Effective From printed as 2 May 2031; blank in the file dated 22 Jul 2025
Whitelee
PRO-000067-3, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Wind Onshore
MW Effective From printed as 25 Apr 2033; blank in the file dated 22 Jul 2025
Whitelee
PRO-000067-4, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Wind Onshore
MW Effective From printed as 27 Apr 2034; blank in the file dated 22 Jul 2025
Whitelee Extension
PRO-000068, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee Extension 275/33kV
Energy Storage System;Hydrogen;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 1 Dec 2026; blank in the file dated 22 Jul 2025
Coire Glas Pumped Storage
PRO-000073-1, COIRE GLAS HYDRO PUMPED STORAGE LIMITED
Coire Glas GSP
Pump Storage
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Coire Glas Pumped Storage
PRO-000073-2, COIRE GLAS HYDRO PUMPED STORAGE LIMITED
Coire Glas GSP
Pump Storage
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Finlarig
PRO-000079-2, SSE Generation Limited
Killin 132/11kV Substation
Hydro
MW Effective From printed as 30 Nov 2031; blank in the file dated 22 Jul 2025
Carnedd Wen Wind Farm
PRO-000090, CARNEDD WEN WIND FARM LIMITED
Mid Wales West 132kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Chirmorie Wind Farm
PRO-000094, CHIRMORIE WIND FARM LIMITED
Chirmorie 132/33kV Substation
Wind Onshore
MW Effective From printed as 9 Oct 2026; blank in the file dated 22 Jul 2025
Coryton
PRO-000103, CORYTON ENERGY COMPANY LTD.
Coryton South 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
Creag Riabhach Wind Farm
PRO-000109-2, CREAG RIABHACH WIND FARM LTD
Creag Riabhach 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Jul 2027; blank in the file dated 22 Jul 2025
Cruachan U3&4 Replacement
PRO-000113-2, DRAX PUMPED STORAGE LIMITED
Cruachan 275kV Substation
Pump Storage
MW Effective From printed as 1 Jun 2027; blank in the file dated 22 Jul 2025
Derwent
PRO-000120, UK UTILITY RESERVE LIMITED
Willington 132kV Substation
CHP (Combined Heat and Power)
MW Effective From printed as 1 Apr 2024; blank in the file dated 22 Jul 2025
Didcot B
PRO-000122, RWE Generation UK Plc
Didcot 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
MW Effective From printed as 31 Oct 2037; blank in the file dated 22 Jul 2025
Stranoch Wind Farm
PRO-000127, Stranoch Windfarm Limited
Stranoch Wind 132/33kV Substation
Wind Onshore
MW Effective From printed as 9 Oct 2026; blank in the file dated 22 Jul 2025
East Anglia Two
PRO-000134-1, EAST ANGLIA TWO LIMITED
EA2A and EA2B 275/66kV Offshore Platform
Wind Offshore
MW Effective From printed as 31 Mar 2028; blank in the file dated 22 Jul 2025
East Anglia Two
PRO-000134-2, EAST ANGLIA TWO LIMITED
EA2A and EA2B 275/66kV Offshore Platform
Wind Offshore
MW Effective From printed as 31 Dec 2030; blank in the file dated 22 Jul 2025
Edinbane Windfarm
PRO-000135-2, VATTENFALL WIND POWER LTD
Edinbane 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 30 Apr 2033; blank in the file dated 22 Jul 2025
Eggborough CCGT - OCGT - BESS
PRO-000136-1, EGGBOROUGH POWER LIMITED
Eggborough 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 1 Oct 2026; blank in the file dated 22 Jul 2025
Eggborough CCGT - OCGT - BESS
PRO-000136-2, EGGBOROUGH POWER LIMITED
Eggborough 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 1 Oct 2027; blank in the file dated 22 Jul 2025
Hartlepool
PRO-000139, EDF Energy Nuclear Generation Limited
Hartlepool 275kV Substation
Nuclear
MW Effective From printed as 1 Apr 2026; blank in the file dated 22 Jul 2025
Sizewell C
PRO-000145-1, Sizewell C Limited
Sizewell 400kV Substation
Nuclear
MW Effective From printed as 31 Jul 2035; blank in the file dated 22 Jul 2025
Sizewell C
PRO-000145-2, Sizewell C Limited
Sizewell 400kV Substation
Nuclear
MW Effective From printed as 31 Jul 2036; blank in the file dated 22 Jul 2025
Elchies Wind Farm
PRO-000151-1, ELCHIES WIND LIMITED
Elchies 132/33kV Substation
Wind Onshore
MW Effective From printed as 30 Nov 2028; blank in the file dated 22 Jul 2025
Elchies Wind Farm
PRO-000151-2, ELCHIES WIND LIMITED
Elchies 132/33kV Substation
Wind Onshore
MW Effective From printed as 30 Nov 2028; blank in the file dated 22 Jul 2025
Enoch Hill
PRO-000152, RWE Renewables UK Onshore Wind Limited
Enoch Hill 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 30 May 2025; blank in the file dated 22 Jul 2025
Lorg Wind Farm
PRO-000153, RWE Renewables UK Onshore Wind Limited
Lorg Wind Farm 132/32kV
Wind Onshore
MW Effective From printed as 7 Apr 2027; blank in the file dated 22 Jul 2025
Strathy Wood
PRO-000154-1, RWE Renewables UK Onshore Wind Limited
Strathy Wood 132/33kV Substation
Wind Onshore
MW Effective From printed as 30 Sep 2026; blank in the file dated 22 Jul 2025
Strathy Wood
PRO-000154-2, RWE Renewables UK Onshore Wind Limited
Strathy Wood 132/33kV Substation
Wind Onshore
MW Effective From printed as 30 Sep 2026; blank in the file dated 22 Jul 2025
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174-2, SSE Generation Limited
Lochay GSP
Hydro
MW Effective From printed as 1 Jan 2027; blank in the file dated 22 Jul 2025
Strathy South Wind
PRO-000183, SSE Generation Limited
Strathy South 132/33kV Substation
Wind Onshore
MW Effective From printed as 25 Apr 2027; blank in the file dated 22 Jul 2025
Medway Power Station
PRO-000203, MEDWAY POWER LIMITED
Grain 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From printed as 30 Oct 2028; blank in the file dated 22 Jul 2025
Rugeley
PRO-000209, RUGELEY POWER GENERATION LIMITED
Rugeley GSP
Coal
MW Effective From printed as 30 Oct 2032; blank in the file dated 22 Jul 2025
Indian Queens
PRO-000225, PIVOTED POWER LLP
Indian Queens 400kV Substation
Energy Storage System
MW Effective From printed as 30 Jul 2024; blank in the file dated 22 Jul 2025
Spalding Energy Expansion
PRO-000249-2, SPALDING ENERGY EXPANSION LIMITED
Spalding North 400kV Substation
Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 30 Oct 2030; blank in the file dated 22 Jul 2025
JG Pears
PRO-000250-2, JG PEARS GRID CONNECTION LIMITED
High Marnham 275kV Substation
CHP (Combined Heat and Power);Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 30 Nov 2025; blank in the file dated 22 Jul 2025
JG Pears
PRO-000250-3, JG PEARS GRID CONNECTION LIMITED
High Marnham 275kV Substation
CHP (Combined Heat and Power);Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
East Anglia One North
PRO-000269-1, EAST ANGLIA ONE NORTH LIMITED
Friston 400kV Substation
Wind Offshore
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
East Anglia One North
PRO-000269-2, EAST ANGLIA ONE NORTH LIMITED
Friston 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2034; blank in the file dated 22 Jul 2025
East Anglia Three
PRO-000270-1, EAST ANGLIA THREE LIMITED
East Anglia Project Three Offshore Platform
Wind Offshore
MW Effective From printed as 31 Jan 2026; blank in the file dated 22 Jul 2025
East Anglia Three
PRO-000270-2, EAST ANGLIA THREE LIMITED
East Anglia Project Three Offshore Platform
Wind Offshore
MW Effective From printed as 31 Dec 2028; blank in the file dated 22 Jul 2025
Muaitheabhal Wind Farm
PRO-000272, UISENIS POWER LIMITED
Muaitheabhal 132/33kV Substation
Pump Storage;Wind Onshore
MW Effective From printed as 31 Dec 2030; blank in the file dated 22 Jul 2025
Progress Power Station
PRO-000274, PROGRESS POWER LIMITED
Yaxley 400kV Substation
OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 28 Jun 2024; blank in the file dated 22 Jul 2025
Caple Rig [formerly Faw Side Community Wind Farm]
PRO-000297, Community Windpower Limited
Caple Rig 132kV Substation
Wind Onshore
MW Effective From printed as 7 Sep 2029; blank in the file dated 22 Jul 2025
Glen Ullinish Wind Farm
PRO-000298, GLEN ULLINISH WF LIMITED
Glen Ullinish 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Glenmuckloch Pumped Storage
PRO-000299, GLENMUCKLOCH PUMPED STORAGE HYDRO LIMITED
Glenmuckloch 132kV Substation
Pump Storage
MW Effective From printed as 18 May 2029; blank in the file dated 22 Jul 2025
Glenmuckloch Wind Farm
PRO-000300, GLENMUCKLOCH RENEWABLE ENERGY LIMITED
Glenmuckloch 132/33kV
Wind Onshore
MW Effective From printed as 31 May 2029; blank in the file dated 22 Jul 2025
Loganhead Windfarm
PRO-000306, LOGANHEAD WF LIMITED
Hopsrig Collector 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Hopsrig Wind Farm
PRO-000318, HOPSRIG WIND FARM LIMITED
Hopsrig Collector 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Kennoxhead Wind Farm
PRO-000319, ORSTED ONSHORE UK LIMITED
Coalburn 132kV
Wind Onshore
MW Effective From printed as 28 Apr 2028; blank in the file dated 22 Jul 2025
Pencloe Windfarm
PRO-000323-1, PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 1 Jul 2025; blank in the file dated 22 Jul 2025
Pencloe Windfarm
PRO-000323-2, PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
Willington
PRO-000326, PIVOTED POWER LLP
Willington East 400kV Substation
Energy Storage System
MW Effective From printed as 30 Jun 2026; blank in the file dated 22 Jul 2025
Scoop Hill Wind Farm
PRO-000327, Community Windpower Limited
Scoop Hill Wind Farm 132kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Recell at Penrhos (BEGA)
PRO-000330-1, Recell Energy Bloom Developments Limited
Penrhos GSP
Biomass
MW Effective From printed as 30 Oct 2025; blank in the file dated 22 Jul 2025
Recell at Penrhos (BEGA)
PRO-000330-2, Recell Energy Bloom Developments Limited
Penrhos GSP
Biomass
MW Effective From printed as 30 Jun 2026; blank in the file dated 22 Jul 2025
MeyGen Tidal
PRO-000336-1, Meygrid Limited
Gills Bay GSP
Energy Storage System;Tidal
MW Effective From printed as 1 Apr 2027; blank in the file dated 22 Jul 2025
MeyGen Tidal
PRO-000336-2, Meygrid Limited
Gills Bay GSP
Energy Storage System;Tidal
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
MeyGen Tidal
PRO-000336-3, Meygrid Limited
Gills Bay GSP
Energy Storage System;Tidal
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
MeyGen Tidal
PRO-000336-4, Meygrid Limited
Gills Bay GSP
Energy Storage System;Tidal
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
MeyGen Tidal
PRO-000336-5, Meygrid Limited
Gills Bay GSP
Energy Storage System;Tidal
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Pembroke BESS
PRO-000337, RWE Generation UK Plc
Pembroke 400kV Substation
Energy Storage System
MW Effective From printed as 29 Oct 2027; blank in the file dated 22 Jul 2025
Whitelaw Brae Windfarm
PRO-000341, WHITELAW BRAE WINDFARM LIMITED
Whitelaw Brae 'A' and 'B' 33kV Substations
Wind Onshore
MW Effective From printed as 31 Jul 2026; blank in the file dated 22 Jul 2025
North Lowther Energy Initiative
PRO-000344, NLEI LTD
NLEI Windfarm 132/33kV substation
Wind Onshore
MW Effective From printed as 30 Apr 2031; blank in the file dated 22 Jul 2025
Sandy Knowe Wind Farm
PRO-000345-2, SANDY KNOWE WIND FARM LIMITED
Sandyknowe 132/33kV
Wind Onshore
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Stornoway Wind Farm
PRO-000346, STORNOWAY WIND FARM LIMITED
Arnish 275kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Inch Cape Offshore Wind Farm Platform 1
PRO-000348, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From printed as 21 Feb 2026; blank in the file dated 22 Jul 2025
Inch Cape Offshore Wind Farm Platform 2
PRO-000349, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From printed as 21 Feb 2026; blank in the file dated 22 Jul 2025
Sanquhar II Wind Farm
PRO-000352-1, SANQUHAR II COMMUNITY WIND CO LTD
Sanquhar II Wind Farm Substation
Wind Onshore
MW Effective From printed as 31 Jul 2026; blank in the file dated 22 Jul 2025
Sanquhar II Wind Farm
PRO-000352-2, SANQUHAR II COMMUNITY WIND CO LTD
Sanquhar II Wind Farm Substation
Wind Onshore
MW Effective From printed as 28 Feb 2027; blank in the file dated 22 Jul 2025
Windy Standard III Wind Farm
PRO-000359-1, Windy Standard III Limited
Dun Hill 132/33kV
Wind Onshore
MW Effective From printed as 1 Jun 2026; blank in the file dated 22 Jul 2025
Windy Standard III Wind Farm
PRO-000359-2, Windy Standard III Limited
Dun Hill 132/33kV
Wind Onshore
MW Effective From printed as 1 Jun 2026; blank in the file dated 22 Jul 2025
Windy Standard III Wind Farm
PRO-000359-3, Windy Standard III Limited
Dun Hill 132/33kV
Wind Onshore
MW Effective From printed as 1 Jun 2026; blank in the file dated 22 Jul 2025
Powersite @ Drakelow
PRO-000364, POWERSITE LTD
Drakelow 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From printed as 1 Oct 2020; blank in the file dated 22 Jul 2025
South Humber Bank
PRO-000366, EP UK Power Development II Ltd
South Humber Bank 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From printed as 30 Oct 2039; blank in the file dated 22 Jul 2025
Aberarder Wind Farm
PRO-000368, ABERARDER WIND FARM LLP
Aberarder Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Aug 2026; blank in the file dated 22 Jul 2025
West Burton B
PRO-000369-1, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
MW Effective From printed as 30 Oct 2027; blank in the file dated 22 Jul 2025
West Burton B
PRO-000369-2, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
MW Effective From printed as 30 Oct 2034; blank in the file dated 22 Jul 2025
Millbrook Power
PRO-000373, MILLBROOK POWER LIMITED
Marston Vale 400kV Substation
OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 28 Jun 2024; blank in the file dated 22 Jul 2025
Bridgwater (tertiary)
PRO-000375, ENSO GREEN HOLDINGS H LIMITED
Bridgwater 400/132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Aug 2028; blank in the file dated 22 Jul 2025
Aberthaw (Tertiary)
PRO-000376, Aberthaw Green Limited
Aberthaw 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Bolney (tertiary)
PRO-000380, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 29 May 2028; blank in the file dated 22 Jul 2025
Bhlaraidh Extension Wind Farm
PRO-000383, SSE Generation Limited
Bhlaraidh 132/33kV Substation
Wind Onshore
MW Effective From printed as 17 Aug 2029; blank in the file dated 22 Jul 2025
Sunnica
PRO-000393, SUNNICA LIMITED
South Anglia Connection Node D 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Broken Cross Windfarm
PRO-000395, BROKEN CROSS WIND FARM LIMITED
Broken Cross 132/33kV
Wind Onshore
MW Effective From printed as 1 Apr 2026; blank in the file dated 22 Jul 2025
Bramley (tertiary)
PRO-000396, BRAMLEY SOLAR LIMITED
Bramley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 16 Aug 2026; blank in the file dated 22 Jul 2025
Bramford Tertiary
PRO-000397-1, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 16 Jul 2026; blank in the file dated 22 Jul 2025
Bramford Tertiary
PRO-000397-2, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Oct 2029; blank in the file dated 22 Jul 2025
Blarghour Wind
PRO-000398, BLARGHOUR WIND FARM LIMITED
Blarghour Substation
Wind Onshore
MW Effective From printed as 1 Apr 2029; blank in the file dated 22 Jul 2025
Norfolk Boreas
PRO-000399-1, NORFOLK BOREAS LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From printed as 1 Oct 2029; blank in the file dated 22 Jul 2025
Norfolk Boreas
PRO-000399-2, NORFOLK BOREAS LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From printed as 31 Dec 2030; blank in the file dated 22 Jul 2025
Cowley (Tertiary)
PRO-000407, COWLEY BALDON GREEN LIMITED
Cowley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 14 Nov 2025; blank in the file dated 22 Jul 2025
Dogger Bank Project C
PRO-000409, DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIMITED
Lackenby 400kV Substation
Wind Offshore
MW Effective From printed as 1 Apr 2025; blank in the file dated 22 Jul 2025
High Constellation Windfarm
PRO-000416, HIGH CONSTELLATION WINDFARM LIMITED
High Constellation 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Jul 2027; blank in the file dated 22 Jul 2025
Corriegarth 2 Wind Farm
PRO-000420, CORRIEGARTH 2 WIND FARM LIMITED
Corriegarth 132/33kV substation
Wind Onshore
MW Effective From printed as 31 Jul 2027; blank in the file dated 22 Jul 2025
Port of Mostyn
PRO-000421-1, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
MW Effective From printed as 1 Dec 2030; blank in the file dated 22 Jul 2025
Port of Mostyn
PRO-000421-2, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
MW Effective From printed as 1 Jun 2031; blank in the file dated 22 Jul 2025
Port of Mostyn
PRO-000421-3, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
MW Effective From printed as 1 Jan 2032; blank in the file dated 22 Jul 2025
Douglas West Extension
PRO-000422, DOUGLAS WEST EXTENSION LTD
Douglas West Extension Windfarm
Wind Onshore
MW Effective From printed as 30 Jun 2025; blank in the file dated 22 Jul 2025
Cumberhead West Wind Farm
PRO-000423, CUMBERHEAD WEST WIND FARM LTD.
Cumberhead 33kV
Wind Onshore
MW Effective From printed as 31 Jul 2025; blank in the file dated 22 Jul 2025
Cloiche Wind Farm
PRO-000425, SSE Generation Limited
Cloich 132kV Substation
Wind Onshore
MW Effective From printed as 1 Feb 2028; blank in the file dated 22 Jul 2025
Dorenell Battery
PRO-000427, CLASHINDARROCH WINDFARM EXTENSION LIMITED
Dorenell BESS 132KV substation
Wind Onshore
MW Effective From printed as 31 Oct 2023; blank in the file dated 22 Jul 2025
Drakelow
PRO-000428, ENSO GREEN HOLDINGS V LIMITED
Drakelow 132kV Substation
Energy Storage System
MW Effective From printed as 1 Dec 2027; blank in the file dated 22 Jul 2025
Fleet Tertiary
PRO-000429, FLEET SOLAR LIMITED
Fleet 400kV Substation
Thermal
MW Effective From printed as 30 Nov 2025; blank in the file dated 22 Jul 2025
Enderby Tertiary
PRO-000430, CLUMP FARM SOLAR LIMITED
Enderby 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Aug 2027; blank in the file dated 22 Jul 2025
JBM Solar -Minety
PRO-000432, JBM SOLAR PROJECTS 14 LTD
Minety 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Nov 2028; blank in the file dated 22 Jul 2025
Hornsea Power Station 3
PRO-000434-1, HORNSEA PROJECT THREE (UK) LIMITED
Norwich Main 400kV Substation
Energy Storage System;Wind Offshore
MW Effective From printed as 1 Oct 2026; blank in the file dated 22 Jul 2025
Hornsea Power Station 3
PRO-000434-2, HORNSEA PROJECT THREE (UK) LIMITED
Norwich Main 400kV Substation
Energy Storage System;Wind Offshore
MW Effective From printed as 31 Dec 2028; blank in the file dated 22 Jul 2025
Hornsea Power Station 4
PRO-000435-1, ORSTED HORNSEA PROJECT FOUR LIMITED
Creyke Beck 400kV Substation
Wind Offshore
MW Effective From printed as 30 Oct 2028; blank in the file dated 22 Jul 2025
Hornsea Power Station 4
PRO-000435-2, ORSTED HORNSEA PROJECT FOUR LIMITED
Creyke Beck 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Glenshimmeroch Windfarm
PRO-000440, ENERGYFARM UK GLENSHIMMEROCH LLP
SPT Margree collector substation
Wind Onshore
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Energy Isles
PRO-000447, ENERGY ISLES SHETLAND LIMITED
Energy Isles 132kV Substation
Wind Onshore
MW Effective From printed as 30 Oct 2032; blank in the file dated 22 Jul 2025
Priestgill Wind Farm
PRO-000448, PRIESTGILL WIND FARM LIMITED
Elvanfoot 400/275/33kV
Wind Onshore
MW Effective From printed as 30 Nov 2026; blank in the file dated 22 Jul 2025
Five Estuaries Offshore Wind Farm
PRO-000450, FIVE ESTUARIES OFFSHORE WIND FARM LIMITED
Five Estuaries 220/66 kV Offshore Substation
Wind Offshore
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
North Falls Offshore Wind Farm
PRO-000451, NORTH FALLS OFFSHORE WIND FARM LIMITED
North Falls Offshore Platform Substation
Wind Offshore
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Exeter Main Tertiary
PRO-000452, EXETER MAIN BATTERY LIMITED
Exeter 400kV Substation
Thermal
MW Effective From printed as 1 May 2024; blank in the file dated 22 Jul 2025
Fife Grid Services
PRO-000453, KINCARDINE GRID 3 LTD
Fife Grid Services Facility 275kV Substation
Reactive Compensation
MW Effective From printed as 30 Jul 2027; blank in the file dated 22 Jul 2025
Minety
PRO-000454, HB411MIN Limited
Minety 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2024; blank in the file dated 22 Jul 2025
Iron Acton
PRO-000455-1, HD000ACT LTD
Iron Acton 275kV Substation
Energy Storage System
MW Effective From printed as 13 Apr 2026; blank in the file dated 22 Jul 2025
Iron Acton
PRO-000455-2, HD000ACT LTD
Iron Acton 275kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Vanguard
PRO-000459, NORFOLK VANGUARD WEST LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From printed as 1 Dec 2025; blank in the file dated 22 Jul 2025
Rayleigh 1 Tertiary
PRO-000460, RAYLEIGH GREEN LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Mossy Hill Wind Farm
PRO-000461, MOSSY HILL SHETLAND LIMITED
Mossy Hill 132kV Substation
Demand;Wind Onshore
MW Effective From printed as 30 Nov 2028; blank in the file dated 22 Jul 2025
Melksham (Tertiary)
PRO-000463, MELKSHAM CALNE GREEN LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 26 Jun 2026; blank in the file dated 22 Jul 2025
Mannington Tertiary
PRO-000464, MANNINGTON ENERGY CENTRE LIMITED
Mannington 400kV Substation
Energy Storage System
MW Effective From printed as 30 Oct 2025; blank in the file dated 22 Jul 2025
Rayleigh 2 Tertiary
PRO-000466, ENSO GREEN HOLDINGS J LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Rampion Extension Offshore Wind Farm
PRO-000467, RAMPION EXTENSION DEVELOPMENT LIMITED
Bolney 400kV Substation
Wind Offshore
MW Effective From printed as 1 Aug 2026; blank in the file dated 22 Jul 2025
Thorpe Marsh 1 (Tertiary)
PRO-000470, ENSO GREEN HOLDINGS I LIMITED
Thorpe Marsh 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2028; blank in the file dated 22 Jul 2025
Erebus
PRO-000471, Blue Gem Wind Limited
Pembroke 132kV Substation
Wind Offshore
MW Effective From printed as 26 Jul 2028; blank in the file dated 22 Jul 2025
Overhill Wind Farm
PRO-000472, ENERGYFARM UK OVERHILL LLP
Overhill 132kV Substation
Wind Onshore
MW Effective From printed as 6 Jun 2029; blank in the file dated 22 Jul 2025
Breezy Hill Wind Farm
PRO-000475, BROCKWELL ENERGY LIMITED
New Cumnock A 132kV
Wind Onshore
MW Effective From printed as 30 Apr 2028; blank in the file dated 22 Jul 2025
Enoch Hill 2 Wind Farm
PRO-000478, RWE Renewables UK Onshore Wind Limited
Enoch Hill 2 Wind Farm 33kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 30 Apr 2027; blank in the file dated 22 Jul 2025
Knockodhar Wind Farm
PRO-000483, REG KNOCKODHAR LIMITED
Knockodhar Wind Farm 132kV Substation
Wind Onshore
MW Effective From printed as 30 Apr 2028; blank in the file dated 22 Jul 2025
Lovedean (Tertiary)
PRO-000484, LOVEDEAN GREEN LIMITED
Lovedean 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
Loch Luichart Extension II
PRO-000487, BLUEBELL WIND FARM LIMITED
Loch Luichart Extension II Substation
Wind Onshore
MW Effective From printed as 31 Oct 2024; blank in the file dated 22 Jul 2025
Iron Acton
PRO-000491-2, IRON ACTON GREEN LIMITED
132kV bay at Iron Acton Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Sep 2026; blank in the file dated 22 Jul 2025
Mill Hill Tertiary Connection
PRO-000493, HB333MIL LTD
Mill Hill 275kV Substation
Energy Storage System
MW Effective From printed as 24 Oct 2025; blank in the file dated 22 Jul 2025
Thurrock Power Station
PRO-000494-1, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
MW Effective From printed as 30 Jun 2025; blank in the file dated 22 Jul 2025
Thurrock Power Station
PRO-000494-2, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
MW Effective From printed as 31 Oct 2025; blank in the file dated 22 Jul 2025
JBM Solar 13 - Melksham
PRO-000495, JBM SOLAR PROJECTS 13 LIMITED
Melksham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 17 Jul 2026; blank in the file dated 22 Jul 2025
Walpole 2 (tertiary)
PRO-000505, ENSO GREEN HOLDINGS R LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Wylfa Substation
PRO-000506, WYLFA GREEN LIMITED
Wylfa 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Jun 2029; blank in the file dated 22 Jul 2025
Scira-Dudgeon Extension
PRO-000507-1, SHERINGHAM SHOAL AND DUDGEON EXTENSIONS PROJCO LIMITED
Norwich Main 400kV Substation
Wind Offshore
MW Effective From printed as 1 Jan 2030; blank in the file dated 22 Jul 2025
Scira-Dudgeon Extension
PRO-000507-2, SHERINGHAM SHOAL AND DUDGEON EXTENSIONS PROJCO LIMITED
Norwich Main 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Scira-Dudgeon Extension
PRO-000507-3, SHERINGHAM SHOAL AND DUDGEON EXTENSIONS PROJCO LIMITED
Norwich Main 400kV Substation
Wind Offshore
MW Effective From printed as 1 Oct 2034; blank in the file dated 22 Jul 2025
Shepherds Rig Wind Farm
PRO-000511, SETT WIND DEVELOPMENT LIMITED
Shepherds Rig Wind Farm 132kV Substation
Wind Onshore
MW Effective From printed as 30 Jul 2024; blank in the file dated 22 Jul 2025
Whitegate Tertiary Connection
PRO-000512, HD144WHI LTD
Whitegate 275kV Substation
Energy Storage System
MW Effective From printed as 30 Jun 2024; blank in the file dated 22 Jul 2025
Berwick Bank Offshore Wind Farm C
PRO-000513, BERWICK BANK C LIMITED
Blyth 400kV Substation
Wind Offshore
MW Effective From printed as 30 Nov 2029; blank in the file dated 22 Jul 2025
Berkswell (Tertiary)
PRO-000516, ENSO GREEN HOLDINGS P LIMITED
Berkswell 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 May 2028; blank in the file dated 22 Jul 2025
Crystal Rig IV Wind Farm
PRO-000520, CRYSTAL RIG IV LIMITED
Crystal Rig 400kV substation
Wind Onshore
MW Effective From printed as 13 Oct 2025; blank in the file dated 22 Jul 2025
Dunside Wind Farm (Formally Fallago Rig 2 Wind Farm)
PRO-000526, EDF ENERGY RENEWABLES LIMITED
Fallago 400/33kV
Wind Onshore
MW Effective From printed as 30 Apr 2029; blank in the file dated 22 Jul 2025
Awel Y Mor
PRO-000529-1, AWEL Y MOR OFFSHORE WIND FARM LIMITED
Bodelwyddan 400kV Substation
Wind Offshore
MW Effective From printed as 1 Apr 2027; blank in the file dated 22 Jul 2025
Awel Y Mor
PRO-000529-2, AWEL Y MOR OFFSHORE WIND FARM LIMITED
Bodelwyddan 400kV Substation
Wind Offshore
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
High Marnham (Tertiary)
PRO-000531, ENSO GREEN HOLDINGS K LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Pembroke (spare bay)
PRO-000538, Pembroke Green Limited
Pembroke 132kV Substation
Energy Storage System
MW Effective From printed as 30 Jul 2028; blank in the file dated 22 Jul 2025
Capenhurst
PRO-000540, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Sep 2033; blank in the file dated 22 Jul 2025
Hareshaw Rig Wind Farm
PRO-000543, HARESHAW RIG WF LIMITED
Hopsrig Collector 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Fleet EGH (Tertiary)
PRO-000544, FLEET GREEN LIMITED
Fleet 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 13 Jan 2027; blank in the file dated 22 Jul 2025
Willington East 2 (Tertiary)
PRO-000548, ENSO GREEN HOLDINGS SS LIMITED
Willington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Jul 2028; blank in the file dated 22 Jul 2025
Cryogenic Battery System (Synchronous)
PRO-000549-1, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
MW Effective From printed as 8 May 2026; blank in the file dated 22 Jul 2025
Cryogenic Battery System (Synchronous)
PRO-000549-2, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
MW Effective From printed as 8 Nov 2026; blank in the file dated 22 Jul 2025
Willington East 1 (Tertiary)
PRO-000551, ENSO GREEN HOLDINGS U LIMITED
Willington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2027; blank in the file dated 22 Jul 2025
West Weybridge (Tertiary)
PRO-000552-1, EL (WEST WEYBRIDGE) LIMITED
West Weybridge 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2025; blank in the file dated 22 Jul 2025
West Weybridge (Tertiary)
PRO-000552-2, EL (WEST WEYBRIDGE) LIMITED
West Weybridge 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Warley (tertiary)
PRO-000555-1, WARLEY GREEN LIMITED
Warley 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Jul 2023; blank in the file dated 22 Jul 2025
Warley (tertiary)
PRO-000555-2, WARLEY GREEN LIMITED
Warley 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 28 Jun 2024; blank in the file dated 22 Jul 2025
Walpole 1 (Tertiary)
PRO-000556, WALPOLE GREEN LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Aug 2025; blank in the file dated 22 Jul 2025
West Burton Solar Project
PRO-000561, WEST BURTON SOLAR PROJECT LIMITED
West Burton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Nov 2028; blank in the file dated 22 Jul 2025
GT R4 Wind Farm
PRO-000563, GT R4 LIMITED
Weston Marsh 400kV Substation
Wind Offshore
MW Effective From printed as 30 Nov 2030; blank in the file dated 22 Jul 2025
Daer Wind Farm
PRO-000565, RWE Renewables UK Onshore Wind Limited
Daer Wind Farm 132/33kV
Wind Onshore
MW Effective From printed as 1 Aug 2028; blank in the file dated 22 Jul 2025
OWPL Windfarm
PRO-000568-1, OFFSHORE WIND POWER LIMITED
Banniskirk 400kV Substation
Wind Offshore
MW Effective From printed as 31 Dec 2029; blank in the file dated 22 Jul 2025
OWPL Windfarm
PRO-000568-2, OFFSHORE WIND POWER LIMITED
Banniskirk 400kV Substation
Wind Offshore
MW Effective From printed as 31 Dec 2030; blank in the file dated 22 Jul 2025
Loch na Cathrach Pumped Storage Hydro
PRO-000570-1, STATKRAFT HIGHLANDS PSH LIMITED
Knocknagael 275kV
Pump Storage
MW Effective From printed as 30 Apr 2029; blank in the file dated 22 Jul 2025
Loch na Cathrach Pumped Storage Hydro
PRO-000570-2, STATKRAFT HIGHLANDS PSH LIMITED
Knocknagael 275kV
Pump Storage
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Vanguard East
PRO-000580-1, Norfolk Vanguard East Ltd
Vanguard East 275/66kV Offshore Substation
Wind Offshore
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
Vanguard East
PRO-000580-2, Norfolk Vanguard East Ltd
Vanguard East 275/66kV Offshore Substation
Wind Offshore
MW Effective From printed as 31 Dec 2028; blank in the file dated 22 Jul 2025
Seagreen Phase 1A
PRO-000703, SEAGREEN 1A LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From printed as 1 Apr 2028; blank in the file dated 22 Jul 2025
VPI Immingham B OCGT
PRO-000854, VPI IMMINGHAM B LIMITED
Humber Refinery 400kV Substation
OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 16 Jan 2026; blank in the file dated 22 Jul 2025
Teviot Wind Farm
PRO-000855, TEVIOT WF LIMITED
Teviot 400/132kV Substation
Wind Onshore
MW Effective From printed as 30 May 2033; blank in the file dated 22 Jul 2025
Kincardine Battery Storage Facility
PRO-000856, KINCARDINE GRID 1 LTD
Fife Grid Services Facility 275kV Substation
Energy Storage System
MW Effective From printed as 31 Mar 2026; blank in the file dated 22 Jul 2025
Pines Burn Wind Farm
PRO-000897, PINES BURN WIND FARM LLP
Hawick GSP
Wind Onshore
MW Effective From printed as 2 Aug 2023; blank in the file dated 22 Jul 2025
Coupar Angus Battery
PRO-000905, COUPAR LIMITED
Coupar Angus 132/33kV GSP
Energy Storage System
MW Effective From printed as 21 Feb 2022; blank in the file dated 22 Jul 2025
Tarland Battery Storage System
PRO-000922, Tarland Limited
Tarland GSP
Energy Storage System
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Hill of Towie 2 Wind Farm
PRO-000938, GREENHILLS 1 LIMITED
Keith 2 132/33kV GSP Substation
Wind Onshore
MW Effective From printed as 1 Jun 2030; blank in the file dated 22 Jul 2025
Hare Craig Wind Farm
PRO-000940, HARE CRAIG WINDFARM LLP
Hare Craig 33kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Kaimes Energy Park
PRO-000942, HP Trotter t/a Printonan Farm
Kaimes GSP
Demand;Energy Storage System
MW Effective From printed as 30 Apr 2027; blank in the file dated 22 Jul 2025
West Torrisdale
PRO-000944, ESB ASSET DEVELOPMENT UK LIMITED
Carradale 1 GSP
Wind Onshore
MW Effective From printed as 31 May 2028; blank in the file dated 22 Jul 2025
Arbroath Battery Substation
PRO-000950, ARBROATH LIMITED
Arbroath GSP
Energy Storage System
MW Effective From printed as 21 Feb 2022; blank in the file dated 22 Jul 2025
Druim Leathann BEGA
PRO-000966, DRUIM LEATHANN WINDFARM LIMITED
Stornoway GSP
Wind Onshore
MW Effective From printed as 31 Mar 2027; blank in the file dated 22 Jul 2025
Cogle Moss Wind Farm
PRO-000973, COGLE MOSS RENEWABLES LLP
Mybster 2 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Aug 2025; blank in the file dated 22 Jul 2025
Oaklands Farm Solar PV
PRO-001004, OAKLANDS FARM SOLAR LIMITED.
Drakelow 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Jun 2027; blank in the file dated 22 Jul 2025
Greenburn Mixed Technology
PRO-001006, REG GREENBURN LIMITED
Greenburn Mixed Technology 132kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Feckenham Greener Grid Park
PRO-001008-1, Statkraft UK Ltd
Feckenham 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Feckenham Greener Grid Park
PRO-001008-2, Statkraft UK Ltd
Feckenham 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2032; blank in the file dated 22 Jul 2025
Fasque Windfarm
PRO-001009, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Fetteresso 132kV substation
PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Euchanhead Wind Farm
PRO-001011, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Euchanhead 132kV Substation
Wind Onshore
MW Effective From printed as 29 Oct 2030; blank in the file dated 22 Jul 2025
Dell Wind Farm
PRO-001012, DELL WIND FARM LIMITED
Dell 132kV Substation
Wind Onshore
MW Effective From printed as 1 Apr 2030; blank in the file dated 22 Jul 2025
Axminster
PRO-001017, HB825AXM LTD
Axminster 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2024; blank in the file dated 22 Jul 2025
Ferrybridge D
PRO-001020-1, Keadby Generation Limited
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;Hydrogen;OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 4 Oct 2030; blank in the file dated 22 Jul 2025
Ferrybridge D
PRO-001020-2, Keadby Generation Limited
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;Hydrogen;OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 1 Jun 2034; blank in the file dated 22 Jul 2025
Clauchrie Windfarm
PRO-001021, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Clauchrie 132/33KV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 31 May 2033; blank in the file dated 22 Jul 2025
Clash Gour
PRO-001022, EDF ENERGY RENEWABLES LIMITED
Clash Gour Wind Farm 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
Carrington
PRO-001025, PIVOTED POWER LLP
Carrington 275kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Carrick Wind Farm
PRO-001026, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Carrick Wind Farm Substation
Wind Onshore
MW Effective From printed as 1 Apr 2030; blank in the file dated 22 Jul 2025
Capenhurst Tertiary Connection
PRO-001028, HD888CAP LIMITED
Capenhurst 275kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2023; blank in the file dated 22 Jul 2025
Canterbury Tertiary
PRO-001029, ENSO GREEN HOLDINGS L LIMITED
Canterbury North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Bolney
PRO-001031, PIVOTED POWER LLP
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Jan 2031; blank in the file dated 22 Jul 2025
Bicker Fen 1 Solar
PRO-001034-1, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 26 Sep 2025; blank in the file dated 22 Jul 2025
Bicker Fen 1 Solar
PRO-001034-2, AGR SOLAR 2 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Apr 2035; blank in the file dated 22 Jul 2025
Beinn Tharsuinn Repower
PRO-001035, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Beinn Tharsuinn Repower 132/33kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
North Killingholme Power Project
PRO-001038, UNIPER UK LIMITED
Killingholme 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From printed as 30 Sep 2030; blank in the file dated 22 Jul 2025
Braintree
PRO-001042-1, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2024; blank in the file dated 22 Jul 2025
Braintree
PRO-001042-2, PIVOTED POWER LLP
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2026; blank in the file dated 22 Jul 2025
Braintree (Tertiary)
PRO-001043, CSE22 LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2026; blank in the file dated 22 Jul 2025
Rosefield
PRO-001044, Rosefield Energyfarm Limited
East Claydon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Bicker Fen 2 Solar
PRO-001046-1, AGR SOLAR 3 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 27 Jul 2026; blank in the file dated 22 Jul 2025
Bicker Fen 2 Solar
PRO-001046-2, AGR SOLAR 3 LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Apr 2033; blank in the file dated 22 Jul 2025
Exeter (Tertiary)
PRO-001047-1, PIVOTED POWER LLP
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 16 Jun 2028; blank in the file dated 22 Jul 2025
Exeter (Tertiary)
PRO-001047-2, PIVOTED POWER LLP
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 6 Dec 2036; blank in the file dated 22 Jul 2025
Fferm Solar Pentir
PRO-001049, LIGHTSOURCE SPV 191 LIMITED
Pentir 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 May 2027; blank in the file dated 22 Jul 2025
Plas Power Estate North Tertiary
PRO-001050, LIGHTSOURCE SPV 192 LIMITED
Legacy 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 May 2028; blank in the file dated 22 Jul 2025
Worset PV & BESS Park
PRO-001055, Worcestershire Solar 1 Limited
Hartmoor 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 7 Jun 2024; blank in the file dated 22 Jul 2025
Damhead Creek 2
PRO-001056, VPI POWER LIMITED
Kingsnorth 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
MW Effective From printed as 31 Aug 2025; blank in the file dated 22 Jul 2025
Whitson
PRO-001061, PIVOTED POWER LLP
Whitson 275kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Deeside Power Station
PRO-001062, DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From printed as 25 Oct 2026; blank in the file dated 22 Jul 2025
Laleham
PRO-001063-1, Juniper Energy Limited
Laleham 132kV Substation
Demand;Energy Storage System
MW Effective From printed as 30 May 2028; blank in the file dated 22 Jul 2025
Laleham
PRO-001063-2, Juniper Energy Limited
Laleham 132kV Substation
Demand;Energy Storage System
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Kearsley
PRO-001064, PIVOTED POWER LLP
Kearsley 275kV Substation
Demand;Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Pivot Power Harker Hybrid
PRO-001065, PIVOTED POWER LLP
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Sheirdrim Wind Farm
PRO-001066, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Sheirdrim 132kV Substation
Wind Onshore
MW Effective From printed as 1 Apr 2032; blank in the file dated 22 Jul 2025
Sellindge (Tertiary)
PRO-001067-1, PIVOTED POWER LLP
Sellindge 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Sellindge (Tertiary)
PRO-001067-2, PIVOTED POWER LLP
Sellindge 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Seabank (Tertiary)
PRO-001068, PIVOTED POWER LLP
SEABANK 400/33kV SUBSTATION
Energy Storage System
MW Effective From printed as 1 Nov 2023; blank in the file dated 22 Jul 2025
Taunton
PRO-001073-1, PIVOTED POWER LLP
Taunton 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Taunton
PRO-001073-2, PIVOTED POWER LLP
Taunton 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2037; blank in the file dated 22 Jul 2025
Oldbury (Tertiary)
PRO-001074-1, PIVOTED POWER LLP
Oldbury 275kV Substation
Energy Storage System
MW Effective From printed as 30 Jun 2027; blank in the file dated 22 Jul 2025
Oldbury (Tertiary)
PRO-001074-2, PIVOTED POWER LLP
Oldbury 275kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2037; blank in the file dated 22 Jul 2025
Harestanes West Wind Farm
PRO-001075-1, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Harestanes West Wind Farm 132/33kV
Wind Onshore
MW Effective From printed as 1 Sep 2029; blank in the file dated 22 Jul 2025
Harestanes West Wind Farm
PRO-001075-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Harestanes West Wind Farm 132/33kV
Wind Onshore
MW Effective From printed as 1 Jul 2035; blank in the file dated 22 Jul 2025
Norwich Yare
PRO-001076, ASHGREEN ENERGYFARM LIMITED
Norwich GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 18 Dec 2025; blank in the file dated 22 Jul 2025
Norwich
PRO-001077, PIVOTED POWER LLP
Norwich Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 18 Dec 2025; blank in the file dated 22 Jul 2025
Monets Garden
PRO-001082, MONETS GARDEN BATTERY LTD
Osbaldwick 400kV Substation
Energy Storage System
MW Effective From printed as 30 Oct 2024; blank in the file dated 22 Jul 2025
Kirkby (Tertiary)
PRO-001083, PIVOTED POWER LLP
Kirkby GSP (ENW)
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Aug 2027; blank in the file dated 22 Jul 2025
Kirkby
PRO-001084-1, KIRKBY BATTERY STORAGE LTD
Kirkby 275kV Substation
Energy Storage System
MW Effective From printed as 30 Sep 2025; blank in the file dated 22 Jul 2025
Kirkby
PRO-001084-2, KIRKBY BATTERY STORAGE LTD
Kirkby 275kV Substation
Energy Storage System
MW Effective From printed as 30 Oct 2037; blank in the file dated 22 Jul 2025
Fleet (Tertiary)
PRO-001087, CSE23 LIMITED
Fleet 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Lister Battery (formerly Lister Drive)
PRO-001088, LISTER BATTERY LTD
Lister Drive 275kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2023; blank in the file dated 22 Jul 2025
Ayrshire Grid Services Facility
PRO-001090, HUNTERSTON GRID 3 LTD
Hunterston East 400kV substation
Reactive Compensation
MW Effective From printed as 23 Mar 2026; blank in the file dated 22 Jul 2025
Mannington
PRO-001091, PIVOTED POWER LLP
Mannington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Nov 2025; blank in the file dated 22 Jul 2025
Mannington
PRO-001092, BAYWA R.E. UK LIMITED
Mannington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Aug 2030; blank in the file dated 22 Jul 2025
Hollandmey Renewable Energy Development
PRO-001094, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Hollandmey Renewable Energy Development132/33kV Substation
Wind Onshore
MW Effective From printed as 31 May 2030; blank in the file dated 22 Jul 2025
SHBEC
PRO-001096, EP SHB LIMITED
South Humber Bank 400kV Substation
Waste
MW Effective From printed as 1 Jul 2029; blank in the file dated 22 Jul 2025
Cleve Hill Solar Park
PRO-001097, CLEVE HILL SOLAR PARK LIMITED
Cleve Hill 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 2 Jun 2036; blank in the file dated 22 Jul 2025
Bramley BESS
PRO-001104-1, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
MW Effective From printed as 29 Sep 2025; blank in the file dated 22 Jul 2025
Bramley BESS
PRO-001104-2, BRAMLEY BESS LIMITED
Bramley 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2037; blank in the file dated 22 Jul 2025
Wymondley Solar Farm
PRO-001105, AGR SOLAR 4 LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2025; blank in the file dated 22 Jul 2025
Burwell (Tertiary)
PRO-001109, PIVOTED POWER LLP
Burwell Main 400kV Substation
Energy Storage System
MW Effective From printed as 30 Jun 2029; blank in the file dated 22 Jul 2025
Arecleoch Extension Windfarm
PRO-001111, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Arecleoch 132/33kV
Wind Onshore
MW Effective From printed as 31 Aug 2026; blank in the file dated 22 Jul 2025
Warley
PRO-001113, WARLEY BATTERY STORAGE LIMITED
Warley 275kV Substation
Energy Storage System
MW Effective From printed as 31 Aug 2027; blank in the file dated 22 Jul 2025
Walpole
PRO-001114-2, HOLLYGREEN ENERGYFARM LIMITED
Walpole 400kV substations
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2030; blank in the file dated 22 Jul 2025
Troston Wind Farm
PRO-001115, TROSTON WINDFARM LIMITED
Margree 132kV Collector Substation
Wind Onshore
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Swansea North
PRO-001119, EDF ENERGY RENEWABLES LIMITED
Swansea North 400kV Substation
Energy Storage System
MW Effective From printed as 31 Jul 2028; blank in the file dated 22 Jul 2025
Swansea Greener Grid Park - Connection 1
PRO-001120-1, Swansea Grid Solutions Limited
Swansea North 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From printed as 31 Aug 2024; blank in the file dated 22 Jul 2025
Swansea Greener Grid Park - Connection 1
PRO-001120-2, Swansea Grid Solutions Limited
Swansea North 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Llanwern Phase 1
PRO-001124, FUTURE ENERGY LLANWERN LIMITED
Whitson 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Oct 2028; blank in the file dated 22 Jul 2025
Llanwern Phase 2
PRO-001125, FUTURE ENERGY LLANWERN LIMITED
Whitson 275kV Substation
PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 1 Oct 2028; blank in the file dated 22 Jul 2025
Tillbridge Solar
PRO-001126, TILLBRIDGE SOLAR LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 27 Aug 2028; blank in the file dated 22 Jul 2025
Keith 132 Greener Grid Park
PRO-001129-2, KEITH STORAGE SOLUTIONS LIMITED
Keith 1 132/33kV GSP Substation
Energy Storage System;Reactive Compensation
MW Effective From printed as 31 May 2025; blank in the file dated 22 Jul 2025
Landulph
PRO-001131-1, PIVOTED POWER LLP
Landulph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 18 May 2026; blank in the file dated 22 Jul 2025
Landulph
PRO-001131-2, PIVOTED POWER LLP
Landulph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Sundon
PRO-001132, SUNDON BATTERY STORAGE LIMITED
Sundon 400kV Substation
Energy Storage System
MW Effective From printed as 5 Sep 2025; blank in the file dated 22 Jul 2025
St Dennis Hendra
PRO-001133, SAMBAR POWER LIMITED
Indian Queens 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2024; blank in the file dated 22 Jul 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-1, Menter Môn Morlais Limited
Penrhos GSP
Tidal
MW Effective From printed as 31 Mar 2028; blank in the file dated 22 Jul 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-2, Menter Môn Morlais Limited
Penrhos GSP
Tidal
MW Effective From printed as 31 Mar 2029; blank in the file dated 22 Jul 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-3, Menter Môn Morlais Limited
Penrhos GSP
Tidal
MW Effective From printed as 31 Mar 2030; blank in the file dated 22 Jul 2025
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-4, Menter Môn Morlais Limited
Penrhos GSP
Tidal
MW Effective From printed as 31 Mar 2032; blank in the file dated 22 Jul 2025
Alverdiscott
PRO-001136-1, PIVOTED POWER LLP
Alverdiscott 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Alverdiscott
PRO-001136-2, PIVOTED POWER LLP
Alverdiscott 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2036; blank in the file dated 22 Jul 2025
Spennymoor
PRO-001138, PIVOTED POWER LLP
Spennymoor 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Earraghail Renewable Energy Development (formerly Skipness & Corranbuie)
PRO-001139, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Earraghail 275/33KV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 1 Apr 2031; blank in the file dated 22 Jul 2025
Iver
PRO-001141, Juniper Energy Limited
Iver 275kV Substation
Energy Storage System
MW Effective From printed as 29 Oct 2027; blank in the file dated 22 Jul 2025
Axminster
PRO-001143, PIVOTED POWER LLP
Axminster 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
JBM Solar 12 - Shrewsbury Solar
PRO-001146, RWE Renewables UK Solar and Storage Limited
Shrewsbury 400/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Sep 2028; blank in the file dated 22 Jul 2025
Hunterston Battery Storage Facility
PRO-001155, FLEXIBLEGRIDPOWER2 LTD
Ayrshire Grid 400kV Substation
Demand;Energy Storage System
MW Effective From printed as 9 Mar 2026; blank in the file dated 22 Jul 2025
Heathland Wind Farm
PRO-001156, EDF ENERGY RENEWABLES LIMITED
Heathland 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 29 Sep 2028; blank in the file dated 22 Jul 2025
Garn Fach Wind Farm
PRO-001157, EDF ENERGY RENEWABLES LIMITED
MID WALES CONNECTION NODE A 400KV SUBSTATION
Energy Storage System;Wind Onshore
MW Effective From printed as 31 Oct 2037; blank in the file dated 22 Jul 2025
Nant Y Maen Wind Farm
PRO-001158, EDF ENERGY RENEWABLES LIMITED
Nant Y Maen 132KV Substation
Wind Onshore
MW Effective From printed as 1 May 2032; blank in the file dated 22 Jul 2025
Legacy Tertiary Connection
PRO-001171, HD639LEG LIMITED
Legacy 400kV Substation
Energy Storage System
MW Effective From printed as 31 Aug 2024; blank in the file dated 22 Jul 2025
Wymondley
PRO-001245, Priory Generation Limited
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2025; blank in the file dated 22 Jul 2025
Quantans Hill Wind Farm
PRO-001247, VATTENFALL WIND POWER LTD
Quantans Hill 132kV Substation
Wind Onshore
MW Effective From printed as 2 Jul 2029; blank in the file dated 22 Jul 2025
Gleann Eoghainn
PRO-001275, Renantis UK Limited
Dunvegan 132/33kV Grid Supply Point Substation
Wind Onshore
MW Effective From printed as 30 Nov 2029; blank in the file dated 22 Jul 2025
Bilbo Farm
PRO-001301-1, LEL BILBO SOLAR LIMITED
Strichen GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2024; blank in the file dated 22 Jul 2025
Bilbo Farm
PRO-001301-2, LEL BILBO SOLAR LIMITED
Strichen GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Cairnmore Hill Wind Farm
PRO-001304, Cairnmore Hill Energy Limited
Thurso South 132/33kV GSP Substation
Wind Onshore
MW Effective From printed as 31 May 2028; blank in the file dated 22 Jul 2025
West Burton
PRO-001323, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Jun 2027; blank in the file dated 22 Jul 2025
Lister Drive Shaw
PRO-001342, Carnegie (BES) Ltd
Lister Drive 275kV Substation
Energy Storage System
MW Effective From printed as 1 Sep 2026; blank in the file dated 22 Jul 2025
Alverdiscott
PRO-001344, XLINKS 1 LTD
Alverdiscott 400kV Substation
Interconnector
MW Effective From printed as 30 Aug 2030; blank in the file dated 22 Jul 2025
Alverdiscott 2
PRO-001345, XLINKS 1 LTD
Alverdiscott 400kV Substation
Interconnector
MW Effective From printed as 30 Aug 2032; blank in the file dated 22 Jul 2025
Glen Ullinish Extension
PRO-001346, GLEN ULLINISH WF 2 LTD
Glen Ullinish Extension 132/33kV Substation
Wind Onshore
MW Effective From printed as 1 Apr 2027; blank in the file dated 22 Jul 2025
Bridgwater 2 (tertiary) - New Conn
PRO-001347, BRIDGWATER GREEN LIMITED
Bridgewater 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Aug 2029; blank in the file dated 22 Jul 2025
Highview Hunterston East Cryobattery
PRO-001348, HVS SITECO LTD
Hunterston East 400kV
Demand;Energy Storage System;Reactive Compensation
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Drax
PRO-001355, ENSO GREEN HOLDINGS D LIMITED
Drax 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
Axminster - New Connection
PRO-001356, ENSO GREEN HOLDINGS B LIMITED
Axminster 132kV Substation
Energy Storage System
MW Effective From printed as 30 Jun 2029; blank in the file dated 22 Jul 2025
Uskmouth - New Connection
PRO-001357, AW1 ENERGY STORAGE LIMITED
Uskmouth 132kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Kingsnorth
PRO-001360, ENSO GREEN HOLDINGS G LIMITED
Kingsnorth 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Ratcliffe-on-Soar
PRO-001361, ENSO GREEN HOLDINGS C LIMITED
Ratcliffe-On-Soar 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Jul 2029; blank in the file dated 22 Jul 2025
Strath Tirry
PRO-001363, Strath Tirry Wind Energy 2021 Ltd
Lairg GSP
Wind Onshore
MW Effective From printed as 19 Dec 2029; blank in the file dated 22 Jul 2025
Lethans Wind Farm
PRO-001367, Lethans Wind Farm Limited
Lethans Collector Substation
Wind Onshore
MW Effective From printed as 30 Jun 2027; blank in the file dated 22 Jul 2025
Indian Queens Energy Centre
PRO-001371, IQ ENERGY CENTRE LIMITED
Indian Queens 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 May 2025; blank in the file dated 22 Jul 2025
Dogger Bank South East
PRO-001375-1, RWE Renewables UK Dogger Bank South (East) Limited
Birkhill Wood 400kV Substation
Wind Offshore
MW Effective From printed as 30 Oct 2030; blank in the file dated 22 Jul 2025
Dogger Bank South East
PRO-001375-2, RWE Renewables UK Dogger Bank South (East) Limited
Birkhill Wood 400kV Substation
Wind Offshore
MW Effective From printed as 30 Nov 2031; blank in the file dated 22 Jul 2025
Valorous Offshore Wind Farm
PRO-001383, Blue Gem Wind Limited
Pembroke 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Dogger Bank South West
PRO-001386-1, RWE RENEWABLES UK DOGGER BANK SOUTH (WEST) LIMITED
Birkhill Wood 400kV Substation
Wind Offshore
MW Effective From printed as 30 Oct 2030; blank in the file dated 22 Jul 2025
Dogger Bank South West
PRO-001386-2, RWE RENEWABLES UK DOGGER BANK SOUTH (WEST) LIMITED
Birkhill Wood 400kV Substation
Wind Offshore
MW Effective From printed as 30 Nov 2031; blank in the file dated 22 Jul 2025
Cloich Forest Wind Farm
PRO-001387, EDF ENERGY RENEWABLES LIMITED
Cloich 132kV Substation
Wind Onshore
MW Effective From printed as 31 Jul 2029; blank in the file dated 22 Jul 2025
Glendye Wind Farm
PRO-001389-1, GLENDYE WIND FARM LIMITED
Glendye Wind Farm Substation
Wind Onshore
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Glendye Wind Farm
PRO-001389-2, GLENDYE WIND FARM LIMITED
Glendye Wind Farm Substation
Wind Onshore
MW Effective From printed as 30 Apr 2034; blank in the file dated 22 Jul 2025
Mona Offshore Wind Farm
PRO-001391, Mona Offshore Wind Limited
Bodelwyddan 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Machair Offshore Wind Farm
PRO-001392, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Machair 275/66kV Offshore Substation
Wind Offshore
MW Effective From printed as 16 Sep 2033; blank in the file dated 22 Jul 2025
Net Zero Teesside Power Project
PRO-001400, NET ZERO TEESSIDE POWER LIMITED
Tod Point 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand
MW Effective From printed as 30 Jul 2027; blank in the file dated 22 Jul 2025
Cottam Solar PV + BESS
PRO-001401, COTTAM SOLAR PROJECT LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Sep 2029; blank in the file dated 22 Jul 2025
Neilston Synchronous Compensation
PRO-001405, NEILSTON GRID SERVICES LIMITED
Neilston 400kV Substation
Reactive Compensation
MW Effective From printed as 12 Jun 2025; blank in the file dated 22 Jul 2025
Marram Wind Offshore Wind Farm
PRO-001406-1, Marramwind Limited
Longside 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Marram Wind Offshore Wind Farm
PRO-001406-2, Marramwind Limited
Longside 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Tangy IV WF
PRO-001408, SSE Renewables Services (UK) Limited
Tangy IV 132KV Substation
Substation;Wind Onshore
MW Effective From printed as 30 Apr 2029; blank in the file dated 22 Jul 2025
Alcemi Bramford Battery Energy Storage Facility
PRO-001416, ALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Bramford 400kV Substation
Energy Storage System
MW Effective From printed as 30 Oct 2030; blank in the file dated 22 Jul 2025
Neilston 400kV Greener Grid Park
PRO-001419, Statkraft UK Ltd
Neilston 400kV Substation
Energy Storage System
MW Effective From printed as 17 May 2027; blank in the file dated 22 Jul 2025
Lairg II Wind Farm
PRO-001434, LAIRG II LLP
Dalchork 132kV Substation
Wind Onshore
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Norton PV and BESS
PRO-001437, Darlington Solar 1 Limited
Norton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Ackron Wind Farm
PRO-001446, ACKRON WIND FARM LTD
Dounreay GSP
Wind Onshore
MW Effective From printed as 31 Aug 2028; blank in the file dated 22 Jul 2025
Morecambe Offshore Wind Farm
PRO-001450, MORECAMBE OFFSHORE WINDFARM LTD
Penwortham 400kV Substation
Wind Offshore
MW Effective From printed as 30 Jun 2029; blank in the file dated 22 Jul 2025
Alcemi Devilla Battery Energy Storage Facility
PRO-001453, ALCEMI STORAGE DEVELOPMENTS 3 LIMITED
Alcemi Devilla Battery Energy Storage Facility
Energy Storage System
MW Effective From printed as 30 Oct 2027; blank in the file dated 22 Jul 2025
Coalburn Battery Energy Storage Facility
PRO-001459, ALCEMI STORAGE DEVELOPMENTS 4 LIMITED
Coalburn 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2025; blank in the file dated 22 Jul 2025
EMERGE Centre
PRO-001462, UNIPER UK LIMITED
Ratcliffe-On-Soar 132kV Substation
Waste
MW Effective From printed as 29 Jun 2029; blank in the file dated 22 Jul 2025
Didcot Battery
PRO-001468, DIDCOT BATTERY LIMITED
Didcot 400kV Substation
Demand;Energy Storage System
MW Effective From printed as 30 Mar 2027; blank in the file dated 22 Jul 2025
Green Volt Offshore Windfarm
PRO-001469-1, Green Volt Offshore Windfarm Ltd
New Deer 400kV Substation
Demand;Wind Offshore
MW Effective From printed as 31 Mar 2029; blank in the file dated 22 Jul 2025
Green Volt Offshore Windfarm
PRO-001469-2, Green Volt Offshore Windfarm Ltd
New Deer 400kV Substation
Demand;Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Eccles BESS
PRO-001470, Eccles Energy Centre Limited
Eccles 400kV Substation
Energy Storage System
MW Effective From printed as 4 Dec 2026; blank in the file dated 22 Jul 2025
Pentland Floating Offshore Wind Farm
PRO-001472, HIGHLAND WIND LIMITED
Pentland Floating Offshore Wind Farm 132/66kV substation
Wind Offshore
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Mon Solar Farm
PRO-001480-1, LIGHTSOURCE SPV 204 LIMITED
Wylfa South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2029; blank in the file dated 22 Jul 2025
Mon Solar Farm
PRO-001480-2, LIGHTSOURCE SPV 204 LIMITED
Wylfa South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2037; blank in the file dated 22 Jul 2025
Lamford Hill
PRO-001481-1, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 31 Aug 2029; blank in the file dated 22 Jul 2025
Lamford Hill
PRO-001481-2, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From printed as 31 Oct 2036; blank in the file dated 22 Jul 2025
Thornton Facility
PRO-001484-1, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 24 Sep 2025; blank in the file dated 22 Jul 2025
Thornton Facility
PRO-001484-2, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 29 Oct 2027; blank in the file dated 22 Jul 2025
Thornton Facility
PRO-001484-3, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Nov 2028; blank in the file dated 22 Jul 2025
Thornton Facility
PRO-001484-4, BALWEN LIMITED
Thornton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 29 Oct 2032; blank in the file dated 22 Jul 2025
Ossian 1 Offshore Wind Farm
PRO-001488, Ossian Offshore Wind Farm Limited
Western Marsh 400kV
Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Ossian 3 Offshore Wind Farm
PRO-001489, Ossian Offshore Wind Farm Limited
SSE Offshore 3 220/66kV Offshore Substation
Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Ourack Wind Farm
PRO-001490, OURACK WIND FARM LLP
Ourack Wind Farm 132/33 kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 31 Oct 2030; blank in the file dated 22 Jul 2025
Ossian 2 Offshore Wind Farm
PRO-001491, Ossian Offshore Wind Farm Limited
Western Marsh 400kV
Wind Offshore
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Thainstone Energy Park
PRO-001493, AGILE ENERGY RECOVERY (INVERURIE) LIMITED
Kintore 132/33kV GSP Substation
Waste
MW Effective From printed as 31 Jul 2023; blank in the file dated 22 Jul 2025
Bellrock Offshore Wind Farm
PRO-001496-1, Bellrock Offshore Wind Farm Limited
Hurlie 400kV substation
Wind Offshore
MW Effective From printed as 31 Oct 2032; blank in the file dated 22 Jul 2025
Bellrock Offshore Wind Farm
PRO-001496-2, Bellrock Offshore Wind Farm Limited
Hurlie 400kV substation
Wind Offshore
MW Effective From printed as 31 Oct 2035; blank in the file dated 22 Jul 2025
Twyn Hywel Cillfynydd
PRO-001497, Twyn Hywel Energy Park Ltd
Cilfynydd 400kV Substation
Wind Onshore
MW Effective From printed as 1 Apr 2027; blank in the file dated 22 Jul 2025
Moelfre Energy Park
PRO-001500, MOELFRE ENERGY PARK LIMITED
Bodelwyddan 400kV Substation
Energy Storage System
MW Effective From printed as 1 Oct 2033; blank in the file dated 22 Jul 2025
Tealing Solar & Storage
PRO-001501, SIRIUS ECODEV (TEALING) LTD
Tealing IDNO 132/33kV GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2027; blank in the file dated 22 Jul 2025
Cottam
PRO-001502-1, GATE BURTON ENERGY PARK LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Cottam
PRO-001502-2, GATE BURTON ENERGY PARK LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Jul 2030; blank in the file dated 22 Jul 2025
Rawhills Battery Energy Storage Facility
PRO-001503, ALCEMI STORAGE DEVELOPMENTS 6 LIMITED
Coalburn 400kV GIS Substation
Energy Storage System
MW Effective From printed as 16 Apr 2027; blank in the file dated 22 Jul 2025
Eaton Socon Solar
PRO-001513, BROCKWELL STORAGE & SOLAR LIMITED
Eaton Socon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Morven A Offshore Wind Farm (Prev Phoenix 1A)
PRO-001515, Morven Offshore Wind Limited
Hawthorn Pit 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2031; blank in the file dated 22 Jul 2025
Slickly Wind Farm
PRO-001517, Slickly Wind Farm Limited
Slickly Wind Farm 132kV Substation
Energy Storage System;Wind Onshore
MW Effective From printed as 12 Dec 2029; blank in the file dated 22 Jul 2025
Phoenix 1B Offshore Wind Farm
PRO-001519, Morven Offshore Wind Limited
Near Branxton 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Wether Hill
PRO-001527, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Wether Hill 132/33KV Substation
Wind Onshore
MW Effective From printed as 29 Sep 2031; blank in the file dated 22 Jul 2025
Buchan 01 Offshore Wind Farm
PRO-001528, BUCHAN OFFSHORE WIND LIMITED
Peterhead 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Stromar Offshore Windfarm
PRO-001530-1, Stromar Offshore Wind Farm Limited
Greens 400kV Substation
Wind Offshore
MW Effective From printed as 31 Oct 2033; blank in the file dated 22 Jul 2025
Stromar Offshore Windfarm
PRO-001530-2, Stromar Offshore Wind Farm Limited
Greens 400kV Substation
Wind Offshore
MW Effective From printed as 31 Dec 2035; blank in the file dated 22 Jul 2025
Norton
PRO-001537, BAYWA R.E. UK LIMITED
Norton 275kV Substation
Energy Storage System
MW Effective From printed as 1 Jun 2029; blank in the file dated 22 Jul 2025
BOOM Power Llanbabo Generation
PRO-001540, Carrog Storage Facility Limited
Wylfa 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2028; blank in the file dated 22 Jul 2025
Gwynt Alwen WF
PRO-001545-1, BWLCH GWYN WIND FARM LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
MW Effective From printed as 30 Jun 2030; blank in the file dated 22 Jul 2025
Gwynt Alwen WF
PRO-001545-2, BWLCH GWYN WIND FARM LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
MW Effective From printed as 31 Oct 2032; blank in the file dated 22 Jul 2025
Gaerwen Wind Farm
PRO-001550, RWE Renewables UK Onshore Wind Limited
Gwyddelwern 400kV Substation
Wind Onshore
MW Effective From printed as 1 Jun 2027; blank in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551-1, COYLTON ENERGY LIMITED
Coylton 275/132kV
Energy Storage System
MW Effective From printed as 28 Feb 2026; blank in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551-2, COYLTON ENERGY LIMITED
Coylton 275/132kV
Energy Storage System
MW Effective From printed as 30 Apr 2026; blank in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551-3, COYLTON ENERGY LIMITED
Coylton 275/132kV
Energy Storage System
MW Effective From printed as 30 Oct 2037; blank in the file dated 22 Jul 2025
Achany Extension Wind Farm
PRO-001555, SSE Generation Limited
ACHANY EXTENSION WIND FARM 132/33KV Substation
Wind Onshore
MW Effective From printed as 30 Mar 2028; blank in the file dated 22 Jul 2025
Little Hill
PRO-001556, BRYN GILWERN ENERGY PARK LIMITED
Pont Abraham GSP
Wind Onshore
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Berryburn Extension Wind Farm
PRO-001558, BB2 WIND FARM LIMITED
Berryburn 275/33kV GSP Substation
Wind Onshore
MW Effective From printed as 30 Nov 2025; blank in the file dated 22 Jul 2025
Fron Goch
PRO-001563, NANT MITHIL ENERGY PARK LIMITED
Pont Abraham 132KV
Wind Onshore
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Builth Wells
PRO-001564, ABEREDW ENERGY PARK LIMITED
Pont Abraham GSP
Wind Onshore
MW Effective From printed as 31 Oct 2026; blank in the file dated 22 Jul 2025
Grendon Solar & BESS
PRO-001568, Green Hill Solar Farm Limited
Grendon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From printed as 1 Jul 2029; blank in the file dated 22 Jul 2025
Sulgrave Solar PV
PRO-001572, EDF ENERGY RENEWABLES LIMITED
East Claydon GSP (NGED EM)
PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2026; blank in the file dated 22 Jul 2025
East Claydon Storage
PRO-001573, EAST CLAYDON STORAGE LIMITED
East Claydon 400kV Substation
Energy Storage System
MW Effective From printed as 1 Oct 2026; blank in the file dated 22 Jul 2025
Alcemi Score Battery Energy Storage Facility
PRO-001575, ALCEMI STORAGE DEVELOPMENTS LIMITED
Alcemi Score Battery 400kV Substation
Energy Storage System
MW Effective From printed as 31 Oct 2029; blank in the file dated 22 Jul 2025
Sizing John (Rainhill)
PRO-001581-2, SIZING JOHN LIMITED
Rainhill GSP
Energy Storage System
MW Effective From printed as 25 Sep 2026; blank in the file dated 22 Jul 2025
Llwynygog
PRO-001583, ESGAIR GALED ENERGY PARK LIMITED
Chirk GSP
Wind Onshore
MW Effective From printed as 4 Feb 2027; blank in the file dated 22 Jul 2025
Dolyfardyn
PRO-001584, Llyn Lort Energy Park Limited
Chirk GSP
Wind Onshore
MW Effective From printed as 4 Feb 2027; blank in the file dated 22 Jul 2025
Moel y Llyn
PRO-001585, Waun Hesgog Energy Park Limited
Chirk GSP
Wind Onshore
MW Effective From printed as 4 Feb 2027; blank in the file dated 22 Jul 2025
Bryn Tilti
PRO-001586, RHIWLAS ENERGY PARK LIMITED
Chirk GSP
Wind Onshore
MW Effective From printed as 19 Jul 2028; blank in the file dated 22 Jul 2025
Botley West - Cote Solar Power Station
PRO-001587, SOLARFIVE LTD
Botley West 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From printed as 30 Oct 2026; blank in the file dated 22 Jul 2025
Showing 400 of 1,843.
Capacity up 10
OWPL Windfarm
PRO-000568-2, OFFSHORE WIND POWER LIMITED
Banniskirk 400kV Substation
Wind Offshore
Cumulative Total Capacity changed from 750 MW to 2,250 MW (+1,500 MW)
Ferrybridge D
PRO-001020-1, Keadby Generation Limited
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;Hydrogen;OCGT (Open Cycle Gas Turbine)
Cumulative Total Capacity changed from 310 MW to 1,220 MW (+910 MW)
Legacy Green Energy Centre
PRO-001662-2, LEGACY GREEN ENERGY LIMITED
Legacy 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 400 MW to 1,200 MW (+800 MW)
OWPL Windfarm
PRO-000568-1, OFFSHORE WIND POWER LIMITED
Banniskirk 400kV Substation
Wind Offshore
Cumulative Total Capacity changed from 0 MW to 750 MW (+750 MW)
Green Volt Offshore Windfarm
PRO-001469-1, Green Volt Offshore Windfarm Ltd
New Deer 400kV Substation
Demand;Wind Offshore
Cumulative Total Capacity changed from 0 MW to 300 MW (+300 MW)
Green Volt Offshore Windfarm
PRO-001469-2, Green Volt Offshore Windfarm Ltd
New Deer 400kV Substation
Demand;Wind Offshore
Cumulative Total Capacity changed from 300 MW to 560 MW (+260 MW)
Tween Bridge Solar Park
PRO-001990-3, RWE Renewables UK Solar and Storage Limited
Trent Valley North Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 590 MW to 800 MW (+210 MW)
Ferrybridge D
PRO-001020-2, Keadby Generation Limited
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;Hydrogen;OCGT (Open Cycle Gas Turbine)
Cumulative Total Capacity changed from 1,220 MW to 1,420 MW (+200 MW)
Immingham
PRO-000053, VPI IMMINGHAM LLP
Humber Refinery 400kV Substation
Energy Storage System;Gas Reciprocating
Cumulative Total Capacity changed from 1,218 MW to 1,268 MW (+50 MW)
West Burton B
PRO-000369-2, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
Cumulative Total Capacity changed from 1,833 MW to 1,881 MW (+48 MW)
Capacity down 8
Vicarage Drove BESS
PRO-004943, UK Transition Power Holdings Limited
Trent Valley South Connection Node A 400k
Energy Storage System
Cumulative Total Capacity changed from 2,400 MW to 1,200 MW (−1,200 MW)
Zenobe Blackhillock 300 MW
PRO-001624-2, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 510 MW to 300 MW (−210 MW)
Tollgate 49.5MW BESS
PRO-002372, Tollgate Energy Storage Limited
Hatfield 33kV Substation
Energy Storage System
Cumulative Total Capacity changed from 99 MW to 49.5 MW (−49.5 MW)
NatPower Navenby Energy Park
PRO-005006, NAVENBY ENERGY LIMITED
Trent Valley South Connection Node C 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 1,030 MW to 1,000 MW (−30 MW)
Dersalloch Wind Farm
PRO-000060, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Dersalloch 132/33kV
Wind Onshore
Cumulative Total Capacity changed from 80 MW to 69 MW (−11 MW)
Zenobe Blackhillock 300 MW
PRO-001624-1, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 210 MW to 200 MW (−10 MW)
Viking Wind Farm
PRO-000338, VIKING ENERGY WIND FARM LLP
Kergord GSP
Wind Onshore
Cumulative Total Capacity changed from 443 MW to 434 MW (−9 MW)
Breach Solar Farm
PRO-001019, Burwell 11 Solar Limited
Burwell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 50 MW to 49.9 MW (−0.1 MW)
Project status changed 19
Benbrack Wind Farm
PRO-000032, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Wind Onshore
Project Status changed from Awaiting Consents to Built
Neart Na Gaoithe Offshore Wind Farm
PRO-000273, NEART NA GAOITHE OFFSHORE WIND LIMITED
Neart Na Gaoithe 220/66KV Offshore Substation
Wind Offshore
Project Status changed from Consents Approved to Built
Caple Rig [formerly Faw Side Community Wind Farm]
PRO-000297, Community Windpower Limited
Caple Rig 132kV Substation
Wind Onshore
Project Status changed from Awaiting Consents to Scoping
Hirwaun Power Station
PRO-000309, HIRWAUN POWER LIMITED
Rhigos 400kV Substation
OCGT (Open Cycle Gas Turbine)
Project Status changed from Under Construction/Commissioning to Built
Sundon
PRO-000473, SUNDON GREEN LIMITED
Sundon GSP
Energy Storage System
Project Status changed from Scoping to Built
Hagshaw Hill Phase 1
PRO-000490, HAGSHAW HILL REPOWERING LTD
Hagshaw Hill Wind Farm 33kV Substation
Wind Onshore
Project Status changed from Consents Approved to Built
Walpole 2 (tertiary)
PRO-000505, ENSO GREEN HOLDINGS R LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Hagshaw Hill Phase 2
PRO-000514, HAGSHAW HILL REPOWERING LTD
Hagshaw Hill Wind Farm 33kV Substation
Wind Onshore
Project Status changed from Consents Approved to Built
Cryogenic Battery System (Synchronous)
PRO-000549-1, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Consents Approved to Under Construction/Commissioning
Cryogenic Battery System (Synchronous)
PRO-000549-2, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Consents Approved to Under Construction/Commissioning
Little Raith BES
PRO-000887, HEIT LR LIMITED
Glenniston GSP
Energy Storage System
Project Status changed from Consents Approved to Built
Breach Solar Farm
PRO-001019, Burwell 11 Solar Limited
Burwell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Consents Approved to Built
Bredbury
PRO-001041, PIVOTED POWER LLP
Bredbury 275kV Substation
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Swansea Greener Grid Park - Connection 1
PRO-001120-1, Swansea Grid Solutions Limited
Swansea North 400kV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Consents Approved to Under Construction/Commissioning
Gretna Synchronous Compensation
PRO-001444, GRETNA GRID SERVICES LIMITED
Gretna 400/132kV
Reactive Compensation
Project Status changed from Consents Approved to Built
Zenobe Blackhillock 300 MW
PRO-001624-2, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Project Status changed from Built to Consents Approved
Almondell Lodge BESS & Solar Development
PRO-001667, BROXBURN ENERGY STORAGE LIMITED
Broxburn 132/33kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Consents Approved to Built
Hookers Farm BESS
PRO-002308, Ancleggan Limited
Bolney 132kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
NatPower Teesside Green Energy Park
PRO-004207, Old Rides Energy Storage Limited
Teeside Connection Node A 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Stage changed 1
Waltham Cross Farm 2
PRO-002748-1, Waltham Cross 7 Renewables Limited
Waltham Cross B 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Stage changed from 1 to blank
Gate changed 263
Caple Rig [formerly Faw Side Community Wind Farm]
PRO-000297, Community Windpower Limited
Caple Rig 132kV Substation
Wind Onshore
Gate changed from blank to 1
Willington
PRO-000326, PIVOTED POWER LLP
Willington East 400kV Substation
Energy Storage System
Gate changed from blank to 1
Bolney (tertiary)
PRO-000380, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Capenhurst
PRO-000540, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Feckenham Greener Grid Park
PRO-001008-1, Statkraft UK Ltd
Feckenham 400kV Substation
Energy Storage System
Gate changed from blank to 1
Feckenham Greener Grid Park
PRO-001008-2, Statkraft UK Ltd
Feckenham 400kV Substation
Energy Storage System
Gate changed from blank to 1
Fasque Windfarm
PRO-001009, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Fetteresso 132kV substation
PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Carrington
PRO-001025, PIVOTED POWER LLP
Carrington 275kV Substation
Energy Storage System
Gate changed from blank to 1
Whitson
PRO-001061, PIVOTED POWER LLP
Whitson 275kV Substation
Energy Storage System
Gate changed from blank to 1
Seabank (Tertiary)
PRO-001068, PIVOTED POWER LLP
SEABANK 400/33kV SUBSTATION
Energy Storage System
Gate changed from blank to 1
Oldbury (Tertiary)
PRO-001074-1, PIVOTED POWER LLP
Oldbury 275kV Substation
Energy Storage System
Gate changed from blank to 1
Oldbury (Tertiary)
PRO-001074-2, PIVOTED POWER LLP
Oldbury 275kV Substation
Energy Storage System
Gate changed from blank to 1
Swansea North
PRO-001119, EDF ENERGY RENEWABLES LIMITED
Swansea North 400kV Substation
Energy Storage System
Gate changed from blank to 1
Bridgwater 2 (tertiary) - New Conn
PRO-001347, BRIDGWATER GREEN LIMITED
Bridgewater 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Axminster - New Connection
PRO-001356, ENSO GREEN HOLDINGS B LIMITED
Axminster 132kV Substation
Energy Storage System
Gate changed from blank to 1
Kingsnorth
PRO-001360, ENSO GREEN HOLDINGS G LIMITED
Kingsnorth 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Ratcliffe-on-Soar
PRO-001361, ENSO GREEN HOLDINGS C LIMITED
Ratcliffe-On-Soar 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Alcemi Bramford Battery Energy Storage Facility
PRO-001416, ALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Bramford 400kV Substation
Energy Storage System
Gate changed from blank to 1
Lamford Hill
PRO-001481-1, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Lamford Hill
PRO-001481-2, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Moelfre Energy Park
PRO-001500, MOELFRE ENERGY PARK LIMITED
Bodelwyddan 400kV Substation
Energy Storage System
Gate changed from blank to 1
Havbredey
PRO-001628, HAVBREDEY LIMITED
New Dounreay 400kV substation
Wind Offshore
Gate changed from blank to 1
Llywelyn Floating Offshore Wind Farm
PRO-001668, Renantis UK Limited
Pembroke 400kV Substation
Wind Offshore
Gate changed from blank to 1
Melvich Wind Energy Hub
PRO-001688, Melvich Wind Energy Hub Limited
Melvich Community Wind Farm 132/33kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Baillie Greener Grid Park
PRO-001701, Statkraft UK Ltd
Baillie 275KV Substation
Energy Storage System;Reactive Compensation
Gate changed from blank to 1
Ironbridge Green Energy Centre
PRO-001711, IRONBRIDGE GREEN NG LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Icewind Hawthorn Pit
PRO-001718, KARI ENERGY LIMITED
Hawthorn Pit 400kV Substation
Wind Offshore
Gate changed from blank to 1
Icewind Connah's Quay
PRO-001719, KARI ENERGY LIMITED
Connah's Quay 400kV Substation
Wind Offshore
Gate changed from blank to 1
Icewind Hinkley Point
PRO-001720, KARI ENERGY LIMITED
Woolavington 400kV Substation
Energy Storage System
Gate changed from blank to 1
Merlin Offshore Wind Farm
PRO-001728, OFFSHORE WIND LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Gate changed from blank to 1
Celtic Offshore Wind Farm
PRO-001760, RWE Renewables UK Limited
RWE CELTIC OFFSHORE SUBSTATION
Wind Offshore
Gate changed from blank to 1
Hams Hall Green Energy Centre
PRO-001765-1, HAMS HALL NG LIMITED
Hams Hall 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Hams Hall Green Energy Centre
PRO-001765-2, HAMS HALL NG LIMITED
Hams Hall 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lovedean Greener Grid Park
PRO-001855, Statkraft UK Ltd
Lovedean 400kV Substation
Energy Storage System;Reactive Compensation
Gate changed from blank to 1
New Deer Battery Storage
PRO-001987, NEW DEER ENERGY CENTRE LIMITED
New Deer 2 400kV Substation
Energy Storage System
Gate changed from blank to 1
Merlin 2 Offshore Windfarm
PRO-001997, OFFSHORE WIND LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Gate changed from blank to 1
Penwortham BESS
PRO-002037, CSE28 LIMITED
Penwortham 400kV Substation
Energy Storage System
Gate changed from blank to 1
Portwind
PRO-002046, SE PORTWIND LTD
Chickerell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Offshore
Gate changed from blank to 1
Fort Augustus Storage
PRO-002063, GLENDOE STORAGE LIMITED
Loch Nan Eun 275/18kV
Energy Storage System
Gate changed from blank to 1
Exeter Main
PRO-002082, ENSO GREEN HOLDINGS X LIMITED
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Swansea
PRO-002086, ENSO GREEN HOLDINGS LIMITED
Swansea North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Rassau
PRO-002087, ENSO GREEN HOLDINGS Q LIMITED
Rassau 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Cilfynydd
PRO-002088, ENSO GREEN HOLDINGS X LIMITED
Cilfynydd 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Branxton PV & BESS Station
PRO-002122, IGP Solar 26 Limited
Branxton 400/132kV
Energy Storage System
Gate changed from blank to 1
Norton
PRO-002157, ENSO GREEN HOLDINGS X LIMITED
Norton East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Ratcliffe-on-Soar II
PRO-002158, ENSO GREEN HOLDINGS LIMITED
Ratcliffe-On-Soar 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Ninfield Green Energy Centre
PRO-002163, NINFIELD NG LIMITED
Ninfield 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Chickerell
PRO-002186-1, ENSO GREEN HOLDINGS X LIMITED
Chickerell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Chickerell
PRO-002186-2, ENSO GREEN HOLDINGS X LIMITED
Chickerell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Chickerell
PRO-002186-3, ENSO GREEN HOLDINGS X LIMITED
Chickerell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Wymondley
PRO-002187, ENSO GREEN HOLDINGS LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Stoke Bardolph 400
PRO-002191-1, ENSO GREEN HOLDINGS LIMITED
Stoke Bardolph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Stoke Bardolph 400
PRO-002191-2, ENSO GREEN HOLDINGS LIMITED
Stoke Bardolph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Stoke Bardolph 400
PRO-002191-3, ENSO GREEN HOLDINGS LIMITED
Stoke Bardolph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Langage 400
PRO-002192-1, ENSO GREEN HOLDINGS X LIMITED
Langage 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Langage 400
PRO-002192-2, ENSO GREEN HOLDINGS X LIMITED
Langage 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Langage 400
PRO-002192-3, ENSO GREEN HOLDINGS X LIMITED
Langage 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Legacy 400
PRO-002193, ENSO GREEN HOLDINGS LIMITED
Legacy 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Willington
PRO-002257, SSE UTILITY SOLUTIONS LIMITED
Willington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
High Mathernock Battery Storage
PRO-002273, Harmony HM Limited
Devol Moor 132kV Substation
Energy Storage System
Gate changed from blank to 1
Drongan Battery Storage
PRO-002287, Drongan Battery Storage Ltd
Coylton 275/132kV
Energy Storage System
Gate changed from blank to 1
Elmya Dunbar BESS
PRO-002290, ELMYA ENERGY UK 1 LIMITED
Thorntonloch 400kV Substation
Energy Storage System
Gate changed from blank to 1
Tolkien Solar Farm
PRO-002294, Tolkien Solar Farm Limited
Tolkien Farm 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Manor Farm Solar Park
PRO-002337, CSE42 LIMITED
Fawley GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
KXP Alpha One
PRO-002348, KXP ALPHA I LIMITED
Fawley 132kV Substation
Energy Storage System
Gate changed from blank to 1
KXP Alpha Two
PRO-002349, KXP ALPHA II LIMITED
Fawley 132kV Substation
Energy Storage System
Gate changed from blank to 1
KXP Alpha Three
PRO-002351, KXP ALPHA III LIMITED
Fawley 132kV Substation
Energy Storage System
Gate changed from blank to 1
Scotsburn Road
PRO-002376, TBC 002 LIMITED
Fyrish 275kV Substation
Energy Storage System
Gate changed from blank to 1
Whiteleigh Farm
PRO-002385, QAIR RENEWABLES UK LIMITED
Pyworthy 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Norwich 2
PRO-002408, EDF ENERGY RENEWABLES LIMITED
Norwich Main 400kV Substation
PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Arresgill Wind Farm
PRO-002409, ARRESGILL ENERGY LIMITED
Arresgill 132kV Substation
Wind Onshore
Gate changed from blank to 1
Kelloe Mains
PRO-002425, TBC 003 LIMITED
Kelloe Mains 400kV Substation
Energy Storage System
Gate changed from blank to 1
ELMYA REDNAL
PRO-002526, ELMYA RPC UK REDNAL LIMITED
Ironbridge 400kV Substation
Energy Storage System
Gate changed from blank to 1
EcoWymondley
PRO-002529, Econergy International Limited
Wymondley 2 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Letch Beck Energy Park
PRO-002550, Renewable Energy Systems Limited
Norton East 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Walham 700MW BESS
PRO-002551, GPC 1154 Ltd
Walham 400kV Substation
Energy Storage System
Gate changed from blank to 1
Newark BESS
PRO-002556, SSE DE SOLAR HOLDCO LIMITED
Coddington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
West Andershaw Wind Farm
PRO-002584, WEST ANDERSHAW WIND FARM LIMITED
West Andershaw 132kV Substation
Wind Onshore
Gate changed from blank to 1
Aitkenhead Farm BESS
PRO-002585, Aitkenhead Storage Facility Limited
Clydesmill 275/33kV
Demand;Energy Storage System
Gate changed from blank to 1
Daines BESS
PRO-002614, DAINES ENERGY PARK LIMITED
Daines 400kV Substation
Energy Storage System
Gate changed from blank to 1
ER MKH Energy
PRO-002621, ER PROJECT DEVELOPMENT CO LIMITED
Market Harborough 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Gate changed from blank to 1
Assel Valley Extension Wind Farm
PRO-002632-1, Renantis UK Limited
Maybole GSP
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Assel Valley Extension Wind Farm
PRO-002632-2, Renantis UK Limited
Maybole GSP
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Grendon High Impact Green Energy Hub (HIGEH) 1
PRO-002651, TELIS ENERGY UK LIMITED
LAVENDON 400KV SUBSTATION
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
Gate changed from blank to 1
Bulls Lodge Farm
PRO-002676, 548 UK INVESTMENT HOLDINGS LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Enderby Farm
PRO-002682, 548 UK INVESTMENT HOLDINGS LIMITED
Earl Shilton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Ryhall Farm
PRO-002684, 548 UK INVESTMENT HOLDINGS LIMITED
Casewick 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Sundon Farm
PRO-002685, 548 UK INVESTMENT HOLDINGS LIMITED
Dunstable 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Waltham Cross Farm
PRO-002687, Waltham Cross 2 Renewables Limited
Waltham Cross 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Yaxley Farm
PRO-002688, 548 UK INVESTMENT HOLDINGS LIMITED
Yaxley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Keith Solar Farm
PRO-002699, KEITH SOLAR PV LIMITED
Keith Solar Farm 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Philiphaugh Wind Farm
PRO-002708, EDF ENERGY RENEWABLES LIMITED
Philipaugh Substation
Wind Onshore
Gate changed from blank to 1
East Pit
PRO-002736, CS UK HOLDINGS III LIMITED
Rhigos 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Bulls Lodge Farm 2
PRO-002737, 548 UK INVESTMENT HOLDINGS LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Marston Farm 2
PRO-002740, 548 UK INVESTMENT HOLDINGS LIMITED
Marston Vale 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Patford Bridge Farm 2
PRO-002741, 548 UK INVESTMENT HOLDINGS LIMITED
New Patford Bridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Enderby Farm 2
PRO-002743, 548 UK INVESTMENT HOLDINGS LIMITED
Earl Shilton 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Sundon Farm 2
PRO-002746, 548 UK INVESTMENT HOLDINGS LIMITED
Dunstable 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Cilfynydd BESS
PRO-002756, Cilfynydd BESS Limited
Cilfynydd 400kV Substation
Energy Storage System
Gate changed from blank to 1
Alderton PV & BESS Station
PRO-002764, BNRG ALBION LIMITED
East Claydon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Blyth BESS
PRO-002817, SSE RENEWABLES SOLAR & BATTERY HOLDINGS LIMITED
Blyth 275kV Substation
Energy Storage System
Gate changed from blank to 1
Protos Power Station
PRO-002823, Keadby Generation Limited
MERSEYSIDE CONNECTION NODE A 400KV SUBSTATION
CCGT (Combined Cycle Gas Turbine)
Gate changed from blank to 1
Dunclent Battery Storage
PRO-002827, Firma Vogt Solar Ltd
Warwickshire Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Penninghame Wind Farm
PRO-002830, EDF ENERGY RENEWABLES LIMITED
Penninghame Substation
Wind Onshore
Gate changed from blank to 1
Woburn Solar Farm
PRO-003033, SolarThree Ltd
Dunstable 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Hipsey BESS
PRO-003051, KONA ASSET 2 LIMITED
Dunstable 400kV Substation
Energy Storage System
Gate changed from blank to 1
Carberry BESS (was Smeaton BESS)
PRO-003053, HARMONY CBR LTD
Dalkeith 400kV Substation
Energy Storage System
Gate changed from blank to 1
Tealing Energy Park
PRO-003084, ONPATH ENERGY LIMITED
Tealing 400kV Substation
Energy Storage System
Gate changed from blank to 1
Alcemi Ridham Docks BESF
PRO-003211, Alcemi Storage Developments 23 Ltd
North Kent Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Feckenham PV & BESS Station
PRO-003233, IB VOGT UK LTD
Feckenham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Arresgill Energy Storage 1
PRO-003246, Arresgill Energy Storage 1 Limited
Arresgill 132kV Substation
Energy Storage System
Gate changed from blank to 1
Ceislein Wind Farm
PRO-003256, RWE Renewables UK Onshore Wind Limited
Ceislien Wind Farm
Wind Onshore
Gate changed from blank to 1
Whitecraig BESS
PRO-003265, Apatura Battery Ltd
Dalkeith 400kV Substation
Energy Storage System
Gate changed from blank to 1
Dunstable
PRO-003418, Connectid 9 Limited
West Anglia Connection Node A 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Gate changed from blank to 1
TH Bridge Farm
PRO-003425, FRV Powertek Limited
Imperial Park B 400kV Substation
Energy Storage System
Gate changed from blank to 1
TH Didcot
PRO-003426, FRV Powertek Limited
Chiltern Connection Node D 400kV
Energy Storage System
Gate changed from blank to 1
Braybrooke
PRO-003429, SSE DE SOLAR HOLDCO LIMITED
Market Harborough 400kV Substation
Energy Storage System
Gate changed from blank to 1
Partridge Farm BESS
PRO-003445, Apatura Battery Ltd
Sellindge 400kV Substation
Energy Storage System
Gate changed from blank to 1
EcoMossmorran
PRO-003469, Econergy International Limited
Mossmorran Storage BESS 132KV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lochore BESS
PRO-003483, LOCHORE BESS LTD
Westfield 132/33kV
Energy Storage System
Gate changed from blank to 1
New Cumnock BESS
PRO-003485, NEW CUMNOCK BESS LTD
New Cumnock 275/132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Craig Moss Farm
PRO-003498, QAIR RENEWABLES UK LIMITED
Craig Moss Farm 132kV Substation
Energy Storage System
Gate changed from blank to 1
Kirklands Farm BESS
PRO-003499, Apatura Battery Ltd
Westfield 132/33kV
Energy Storage System
Gate changed from blank to 1
ER BBR Energy
PRO-003508, ER PROJECT DEVELOPMENT CO LIMITED
Er Bbr Energy 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
West Saval Battery Storage
PRO-003510, West Saval Battery Storage Ltd
West Saval Substation 132 kV
Energy Storage System
Gate changed from blank to 1
Cold Norton
PRO-003528, BSR APPLICATIONS LIMITED
South Anglia Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
TH West Weybridge
PRO-003531, FRV Powertek Limited
London West Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
Lackenby PV & BESS Station
PRO-003551, IB VOGT UK LTD
Teeside Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Denny BESS
PRO-003571, IGP ENERGY STORAGE 3 LIMITED
Denny North
Energy Storage System
Gate changed from blank to 1
Coldstream BESS
PRO-003572, IGP ENERGY STORAGE 4 LIMITED
Eccles 400/132kV
Energy Storage System
Gate changed from blank to 1
Lower Pool Energy Park
PRO-003586, Renewable Energy Systems Limited
Derbyshire Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Hawkhill BESS
PRO-003595, GPC Project 12 Ltd
Kincardine North 400kV Substation
Energy Storage System
Gate changed from blank to 1
Spittal BESS Station
PRO-003618, IGP ENERGY STORAGE 5 LIMITED
Spittal 2 400kV Substation
Energy Storage System
Gate changed from blank to 1
Tulliallan BESS
PRO-003619, IGP ENERGY STORAGE 6 LIMITED
Kincardine North 400kV Substation
Energy Storage System
Gate changed from blank to 1
Rugby High Impact Green Energy Hub (HIGEH) 1
PRO-003626, TELIS ENERGY UK LIMITED
Enderby 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
KX Alpha 2 Iron Acton
PRO-003648, KXP ALPHA II LIMITED
Severn Connection Node A 400kv Substation
Energy Storage System
Gate changed from blank to 1
KX Alpha 3 Iron Acton
PRO-003649, KXP ALPHA III LIMITED
Severn Connection Node A 400kv Substation
Energy Storage System
Gate changed from blank to 1
Green Hydrogen Solar Farm
PRO-003652, GREEN HYDROGEN SOLAR FARM LIMITED
Sealand 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Spennymoor BESS Station
PRO-003681, IGP INTERNATIONAL PROSPECTING LIMITED
Wearside Connection Node D 400kV Substation
Energy Storage System
Gate changed from blank to 1
Zenobe Spennymoor BESS
PRO-003692, Zenobe Energy Limited
Wearside Connection Node D 400kV Substation
Energy Storage System
Gate changed from blank to 1
Didcot Farm 2
PRO-003709, Appleford 7 Renewables Limited
APPLEFORD 400kV SUBSTATION
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
ER TWD Energy
PRO-003719, ER PROJECT DEVELOPMENT CO LIMITED
Llanteg 400kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
ER BR Energy
PRO-003724, ER PROJECT DEVELOPMENT CO LIMITED
Tween Bridge 400kV
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Gartclash Farm BESS
PRO-003736, South Plean Storage Facility Limited
Denny North 275/132kV
Energy Storage System
Gate changed from blank to 1
Kirkcaldy BESS
PRO-003743, Apatura Battery Ltd
Kirkcaldy BESS 132kV Substation
Energy Storage System
Gate changed from blank to 1
Project Number 6
PRO-003748, Trent BESS II Limited
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System
Gate changed from blank to 1
Lightsource Ferryside PV
PRO-003761, Lightsource Renewable UK Development Limited
South Wales West Connection Node C 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
KXP Alpha 3 Little Horsted
PRO-003778, KXP ALPHA III LIMITED
Sussex and Romney Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Harlaston
PRO-003814, SSE DE SOLAR HOLDCO LIMITED
Harlaston 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Leadenham High Impact Green Energy Hub
PRO-003815, TELIS ENERGY UK LIMITED
Trent Valley South Connection Node A 400kV
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Oakley
PRO-003818, SSE DE SOLAR HOLDCO LIMITED
Oakley 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Penrhiwdarren Farm
PRO-003828, QAIR RENEWABLES UK LIMITED
Cilfynydd 400kV Substation
Energy Storage System
Gate changed from blank to 1
Crathorne Estate BESS and Solar Farm
PRO-003831, Exagen Development Limited
Lackenby 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lightsource Yaxley PV
PRO-003837, Lightsource Renewable UK Development Limited
North Anglia Connection Node E 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lightsource Hawthorne Pit
PRO-003844, Lightsource Renewable UK Development Limited
Wearside Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Highland BESS
PRO-003845, Apatura Battery Ltd
Highland BESS 132kV Substation
Energy Storage System
Gate changed from blank to 1
Larks Green Farm BESS
PRO-003849, VOLTALIA UK LTD
Iron Acton 132kV Substation
Energy Storage System
Gate changed from blank to 1
Enderby BESS
PRO-003872, EARL SHILTON ENERGY PARK LIMITED
Earl Shilton 400kV Substation
Energy Storage System
Gate changed from blank to 1
Lightsource Bodelwyddan
PRO-003877, Lightsource Renewable UK Development Limited
Cheshire Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
Cruach Bhreac Wind Farm
PRO-003879, Statkraft UK Ltd
Craig Murrail 275kV Substation
Wind Onshore
Gate changed from blank to 1
EPL Somerset
PRO-003905, EPL NEWCO8 LIMITED
West Country Connection Node E 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Creachan Wind Farm
PRO-003906, RWE Renewables UK Onshore Wind Limited
Creachan Wind Farm 132/33kV Substation
Wind Onshore
Gate changed from blank to 1
Burwell GEC (Ethos Green)
PRO-003937, BURWELL GREEN ENERGY CENTRE LTD
Burwell 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Gate changed from blank to 1
Boom Power Seaton Hill Generation HUB
PRO-003951, Seatonhill Storage Facility Limited
Cockenzie 400/275kV
Energy Storage System
Gate changed from blank to 1
Lightsource Marston Vale 240MW PV+BESS
PRO-003981, Lightsource Renewable UK Development Limited
Marston Vale 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Kilbraur North Wind Farm
PRO-003987, EDF ENERGY RENEWABLES LIMITED
Kilbraur Wind Farm Substation
Wind Onshore
Gate changed from blank to 1
Lightsource Braybrooke
PRO-003989, Lightsource Renewable UK Development Limited
West Anglia Connection Node F 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Stoke Bardolph
PRO-004009, Source Galileo Limited
Trent Valley South Connection Node D 400kV Substation
Energy Storage System
Gate changed from blank to 1
Sleat Hybrid
PRO-004014, GALILEO 13 LIMITED
Broadford GSP
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Zenobe Little Horsted BESS
PRO-004032, Zenobe Energy Limited
Sussex and Romney Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Project Number 8
PRO-004072, Trent BESS I Limited
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System
Gate changed from blank to 1
Oxfordshire Energy Park
PRO-004076, Low Carbon Solar Park 40 Limited
Chiltern Connection Node D 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Brown Rig Wind Farm
PRO-004083, SSE Renewables Services (UK) Limited
Hawick 132kV Substation
Wind Onshore
Gate changed from blank to 1
Zenobe Butler's Wood BESS
PRO-004085, Zenobe Energy Limited
Butlers Wood 400kV Substation
Energy Storage System
Gate changed from blank to 1
Zenobe Hawthorn Pit BESS
PRO-004086, Zenobe Energy Limited
Wearside Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
Lightsource Pyworthy
PRO-004089, Lightsource Renewable UK Development Limited
West Country Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Noventum Cottered
PRO-004092, NOVENTUM POWER SOLAR 5 LIMITED
West Anglia Connection Node D 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Swansea North-Rhigos Solar& BESS & Wind
PRO-004099, TYLER HILL CONSULTING LIMITED
South Wales West Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
TH Ninfield
PRO-004111, FRV Powertek Limited
Sussex and Romney Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Bute Hydrogen Project 2
PRO-004125, HALDANE ENERGY PROJECT 2 LIMITED
Creyke Beck 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Gate changed from blank to 1
Bute Hydrogen Project 3
PRO-004126, HALDANE ENERGY PROJECT 3 LIMITED
Grimsby West 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Gate changed from blank to 1
Bute Hydrogen Project 4
PRO-004127, HALDANE ENERGY PROJECT 4 LIMITED
Teeside Connection Node 2 C 132/400kV Substation
CCGT (Combined Cycle Gas Turbine)
Gate changed from blank to 1
Bute Hydrogen Project 5
PRO-004128, HALDANE ENERGY PROJECT 5 LIMITED
Teeside Connection Node B
CCGT (Combined Cycle Gas Turbine)
Gate changed from blank to 1
NatPower Enderby - Patford Bridge Green Energy Park
PRO-004132, ENDERBY ENERGY LIMITED
Derbyshire Connection Node G 400kV
Energy Storage System
Gate changed from blank to 1
Tyler Hill Iver
PRO-004134, FRV Powertek Limited
London West Connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
New Marton Solar Farm - PVDP
PRO-004139, SolarFour Ltd
Cheshire Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Ludgershall - Bicester Solar Farm PVDP
PRO-004140, SolarFour Ltd
Chiltern Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
TH Renfrewshire
PRO-004188, FRV Powertek Limited
TH Renfrwshire 275kV Substation
Energy Storage System
Gate changed from blank to 1
Lagrae Battery Storage
PRO-004214, LAGRAE BATTERY STORAGE LIMITED
Glenmuckloch 132kV Substation
Energy Storage System
Gate changed from blank to 1
Manor Farm
PRO-004269, QAIR RENEWABLES UK LIMITED
East Anglia Connection Node E 400kV Substation
Energy Storage System
Gate changed from blank to 1
Fairmead and Yewtree Farm
PRO-004291, QAIR RENEWABLES UK LIMITED
East Kent connection node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Brae House Farm
PRO-004292, QAIR RENEWABLES UK LIMITED
DOUNREAY 2 275 kV SUBSTATION
Energy Storage System
Gate changed from blank to 1
Strathaven BESS
PRO-004298, IGP ENERGY STORAGE 2 LIMITED
Strathaven 400/275kV
Energy Storage System
Gate changed from blank to 1
Noventum - Biggleswade
PRO-004337, NOVENTUM POWER SOLAR 7 LIMITED
Biggleswade 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Middle Farm Chollerton
PRO-004344, ENRAY POWER LTD
Borders Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
South Powrie Farm
PRO-004353, QAIR RENEWABLES UK LIMITED
Tealing 132kV Substation
Energy Storage System
Gate changed from blank to 1
Elmya Morningside BESS & PV
PRO-004396, ELMYA RPC UK MORNINGSIDE LIMITED
Elmya Morningside 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Bearsden BESS
PRO-004404-1, BEARSDEN BESS LTD
Windyhill 275kV Substation
Energy Storage System
Gate changed from blank to 1
Bearsden BESS
PRO-004404-2, BEARSDEN BESS LTD
Windyhill 275kV Substation
Energy Storage System
Gate changed from blank to 1
NatPower Gwyddelwern Green Energy Park
PRO-004432, GWYDDELWERN ENERGY LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System
Gate changed from blank to 1
Stirling BESS
PRO-004466, ANESCO LIMITED
Peterhead 400kV Substation
Energy Storage System
Gate changed from blank to 1
Butlers Wood PV & BESS Station
PRO-004467, IB VOGT UK LTD
South Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Redhall BESS
PRO-004487, ANESCO LIMITED
Wearside Connection Node D 400kV Substation
Energy Storage System
Gate changed from blank to 1
Greta IV (b)
PRO-004499, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Greta IV (c)
PRO-004500, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
Greta IV (d)
PRO-004501, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
Brodsworth High Impact Green Energy Hub (Brodsworth HIGEH)
PRO-004506, TELIS ENERGY UK LIMITED
Leeds North Connection Node C 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Huntingdon High Impact Energy Hub 2
PRO-004508, TELIS ENERGY UK LIMITED
West Anglia Connection Node H 400kVSubstation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Melton Mowbray High Impact Energy Hub 2
PRO-004510, TELIS ENERGY UK LIMITED
West Anglia Connection Node I 400kV substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Necton High Impact Energy Hub
PRO-004524, TELIS ENERGY UK LIMITED
North Anglia Connection Node B 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Newchurch High Impact Energy Hub
PRO-004525, TELIS ENERGY UK LIMITED
East Kent connection node A 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
EPL Hampshire
PRO-004533, EPL NEWCO7 LIMITED
Nursling 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Enderby Solar & BESS
PRO-004540, GREENTECH PROJECTS HOLDING UK LIMITED
Derbyshire Connection Node H 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Bernicia Energy Park
PRO-004541, BAYWA R.E. UK LIMITED
Stella West 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Bexley GEC - Hurst Grid Park 2
PRO-004546, BEXLEY GREEN ENERGY CENTRE LTD
Hurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Kinoulton Solar & BESS
PRO-004560, GREENTECH INVEST UK (16) LIMITED
Trent Valley North Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
NatPower Tilbury Green Energy Park
PRO-004562, NATPOWER MARINE UK LIMITED
South Anglia Connection Node C 400kV Substation
Energy Storage System
Gate changed from blank to 1
Netherton BESS
PRO-004626, HARMONY ENERGY LIMITED
Longside 400kV Substation
Energy Storage System
Gate changed from blank to 1
Noventum - Astwood
PRO-004635, NOVENTUM POWER SOLAR 12 LIMITED
West Anglia Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Noventum - Stocksbridge
PRO-004661, NOVENTUM POWER SOLAR 14 LIMITED
Leeds South Connection Node C 400kV Substation
Energy Storage System
Gate changed from blank to 1
Crossgatehall BESS
PRO-004668, DE 001 LIMITED
Smeaton 400/275kV
Energy Storage System
Gate changed from blank to 1
BlackDyke BESS
PRO-004671, ANESCO LIMITED
Leeds North Connection Node D 400kV Substation
Energy Storage System
Gate changed from blank to 1
Braegrundie Farm
PRO-004674, AEUK BATTERY PROJECT III LTD
Braegrundie Farm 132kV Substation
Energy Storage System
Gate changed from blank to 1
East Lincolnshire Solar
PRO-004737, Statkraft UK Ltd
Lincolnshire Coastal Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Dounreay BESS
PRO-004749, FIELD DEVCO LTD
New Dounreay 400kV substation
Energy Storage System
Gate changed from blank to 1
Hurlet Battery
PRO-004790, P-FREQUENCY LTD
Neilston 400kV Substation
Energy Storage System
Gate changed from blank to 1
New Marton GEC
PRO-004796, NEW MARTON GREEN ENERGY CENTRE LIMITED
Cheshire Connection Node A2 400kV
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Gate changed from blank to 1
NatPower Llanteg Green Energy Park
PRO-004806, NP SPV 30 LIMITED
South Wales West Connection Node C 400kV
Energy Storage System
Gate changed from blank to 1
Lightsource Patford Bridge
PRO-004807, Lightsource Renewable UK Development Limited
Derbyshire Connection Node I 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lightsource Offerton
PRO-004808, Lightsource Renewable UK Development Limited
Wearside Connection Node B 2 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Lightsource Jubilee Farm
PRO-004815, Lightsource Renewable UK Development Limited
Jubilee Farm 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Baglan BESS IPC
PRO-004816, IPC GRID CONNECTION TWO LIMITED
South Wales West Connection Node B 400kV Substation
Energy Storage System
Gate changed from blank to 1
NatPower Hartlepool Green Energy Park
PRO-004818, NP SPV 34 LIMITED
Wearside Connection Node A 275kV Substation
Energy Storage System
Gate changed from blank to 1
Woodbridge - Noventum
PRO-004822, NOVENTUM POWER SOLAR 16 LIMITED
South Anglia Connection Node E 400kV Substation
Demand;Energy Storage System;Reactive Compensation
Gate changed from blank to 1
Lightsource Willington
PRO-004824, Lightsource Renewable UK Development Limited
Derbyshire Connection Node D 400kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Lightsource Folly Farm
PRO-004825, Lightsource Renewable UK Development Limited
Severn Connection Node A 400kv Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Statkraft SEWF
PRO-004828, Statkraft UK Ltd
Orrin GSP
Wind Onshore
Gate changed from blank to 1
Lightsource Bagots Farm
PRO-004829, Lightsource Renewable UK Development Limited
Derbyshire Connection Node E 400kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Lightsourcebp Amlwch BESS and Hydrogen
PRO-004856, Lightsource Renewable UK Development Limited
Wylfa South 400kV Substation
Demand;Energy Storage System
Gate changed from blank to 1
Lightsource Berthlwyd
PRO-004858, Lightsource Renewable UK Development Limited
MID WALES CONNECTION NODE A 400KV SUBSTATION
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Long Stratton 400
PRO-004868, ENSO GREEN HOLDINGS X LIMITED
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Long Buckby Solar/BESS
PRO-004873, Greentech Invest UK (17) Limited
Derbyshire Connection Node I 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Elmya Foxdale BESS
PRO-004934, RPC ELMYA CARNATION FOXDALE LIMITED
Trent Valley South Connection Node C 400kV Substation
Energy Storage System
Gate changed from blank to 1
Melton Mowbray Solar
PRO-005004, CUBICO UK DEVELOPMENT LIMITED
West Anglia Connection Node I 400kV substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
NatPower Navenby Energy Park
PRO-005006, NAVENBY ENERGY LIMITED
Trent Valley South Connection Node C 400kV Substation
Energy Storage System
Gate changed from blank to 1
Bargatton Farm BESS
PRO-005009, Lightsource Renewable UK Development Limited
Bargatton Farm BESS 132kV Substation
Energy Storage System
Gate changed from blank to 1
NatPower CoalBurn Green Energy Park
PRO-005041, COALBURN ENERGY LIMITED
NatPower Green Energy Park 400kV Substation
Energy Storage System
Gate changed from blank to 1
Derwydd Bach Energy Park
PRO-005044, CONSTANTINE WIND ENERGY LIMITED
Gwyddelwern 400kV Substation
PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
Pollington Hybrid
PRO-005049, EDF ENERGY RENEWABLES LIMITED
Leeds North Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Gate changed from blank to 1
NatPower Oswestry Green Energy Park
PRO-005057, NP SPV 43 LIMITED
Cheshire Connection Node A2 400kV
Energy Storage System
Gate changed from blank to 1
Great Oak Solar
PRO-005093, RWE Renewables UK Solar and Storage Limited
South Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Huntington Solar PV
PRO-005118, EDF ENERGY RENEWABLES LIMITED
West Anglia Connection Node D 400kV Substation
PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Pitkevy BESS
PRO-005119, HARMONY ENERGY LIMITED
Conland Substation
Energy Storage System
Gate changed from blank to 1
NatPower Harburn Green Energy Park
PRO-005123, YAXLEY ENERGY LIMITED
NatPower Harburn Green Energy Park 400kV Substation
Energy Storage System
Gate changed from blank to 1
Edrom Green Energy Park
PRO-005818, NP SPV 45 LIMITED
Kelloe Mains 400kV Substation
Energy Storage System
Gate changed from blank to 1
Jamesfield 3
PRO-005991, HARMONY ENERGY LIMITED
New Abernethy 132kV
Energy Storage System
Gate changed from blank to 1
Hoolan Hills Renewable Energy Park
PRO-006001, RIDGE CLEAN ENERGY LTD
Holm Hill 132kV Substation
Wind Onshore
Gate changed from blank to 1
Quintfall Forest Hybrid Wind and BESS 1
PRO-006032, VOLTALIA UK LTD
Gills Bay 132kV
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Achies BESS
PRO-006050, IGP ENERGY STORAGE 5 LIMITED
New Spittal 275kV Substation
Energy Storage System
Gate changed from blank to 1
Cliffhope
PRO-006052, Invenergy Development UK Ltd
Teviot 400/132kV Substation
Energy Storage System;Wind Onshore
Gate changed from blank to 1
Kellhead
PRO-006055, GREENTECH PROJECTS HOLDING UK LIMITED
Dumfries North 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Rattray BESS and Solar Plant
PRO-006056, GREENTECH PROJECTS HOLDING UK LIMITED
New North East Substation 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Gate changed from blank to 1
Longhaven Energy Storage Centre
PRO-006133, Hydrostor UK Ltd
New North East Substation 400kV Substation
Energy Storage System;Pump Storage;Thermal
Gate changed from blank to 1

By plant type

Plant typeProjects with a changeNewBack on the registerRemovedNet capacity change
Energy Storage System7118724−5,586.3 MW
Energy Storage System;PV Array (Photo Voltaic/solar)4551416−8,756.1 MW
Wind Onshore231026−422.8 MW
Wind Offshore110228−8,400 MW
Energy Storage System;Wind Onshore106413+11.2 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)581721−14,996.8 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore51100+224 MW
PV Array (Photo Voltaic/solar)36202+441.9 MW
Demand;Energy Storage System31013−450 MW
CCGT (Combined Cycle Gas Turbine)21212−1,570 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation190000 MW
Energy Storage System;Reactive Compensation190000 MW
Pump Storage140000 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore110000 MW
Reactive Compensation110000 MW
Energy Storage System;OCGT (Open Cycle Gas Turbine)7006−5,565 MW
Tidal70000 MW
CCGT (Combined Cycle Gas Turbine);Energy Storage System6001−1,833 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore60000 MW
Demand;PV Array (Photo Voltaic/solar)60000 MW
Demand;Wind Offshore6002−300 MW
Energy Storage System;Gas Reciprocating6002−2,536 MW
Nuclear60000 MW
Energy Storage System;Tidal50000 MW
Energy Storage System;Wind Offshore5012−400 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore40000 MW
OCGT (Open Cycle Gas Turbine)40000 MW
PV Array (Photo Voltaic/solar);Wind Onshore40000 MW
Waste4100+55 MW
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)30000 MW
Demand;Energy Storage System;Reactive Compensation30000 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore30000 MW
Biomass20000 MW
CCGT (Combined Cycle Gas Turbine);Demand20000 MW
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;Hydrogen;OCGT (Open Cycle Gas Turbine)2000+1,110 MW
CHP (Combined Heat and Power);Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore20000 MW
Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore20000 MW
Demand;Energy Storage System;Wind Onshore20000 MW
Demand;Wind Onshore20000 MW
Energy Storage System;Pump Storage;Thermal20000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 40 of 57.

By connection site

Connection siteProjects with a changeNewBack on the registerRemovedNet capacity change
Alverdiscott 400kV Substation230000 MW
Penwortham 400kV Substation15039−6,614 MW
Cilfynydd 400kV Substation110000 MW
Thornton 400kV Substation11201+252 MW
Daines 400kV Substation10025−2,640 MW
Harker 400kV Substation10002−2,050 MW
Navenby 400kV Substation100000 MW
Sussex and Romney Connection Node A 400kV Substation100000 MW
Bicker Fen 400kV Substation9013−1,800 MW
Drakelow 400kV Substation9001−1,025 MW
High Marnham 400kV Substation90000 MW
Minety 400kV Substation90000 MW
Swansea North 400kV Substation90000 MW
Trent Valley South Connection Node B 400kV Substation.90000 MW
Trent Valley South Connection Node C 400kV Substation9000−30 MW
Bolney 400kV Substation80000 MW
Feckenham 400kV Substation80000 MW
Hawthorn Pit 400kV Substation8012−2,050 MW
Norwich Main 400kV Substation80000 MW
Pont Abraham GSP80000 MW
Biggleswade 400kV Substation70000 MW
Bramford 400kV Substation70000 MW
Chickerell 400kV Substation7100+43.2 MW
Creyke Beck 400kV Substation70000 MW
East Claydon 400kV Substation70000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 1009.

Earlier comparisons

Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.