Bilbo Farm

Developer as published, connection site, reference: LEL BILBO SOLAR LIMITED. Strichen GSP (SHET). PRO-001301.

Sign in to watch this project
Capacity67.1 MWHybrid, Gate 2
Connection date31 Oct 2033Status as printed: Scoping
First date seen 31 Oct 2024, difference +3287 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20242025File dated 2026-09-11: connection date 2024-10-31Oct 2024File dated 2026-10-20: connection date 2024-06-30Jun 202411 Sep202620 Oct2026
20242025File dated 2026-09-11: connection date 2024-10-31Oct 2024File dated 2026-10-20: connection date 2024-06-30Jun 202411 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Project Status printed as Under Construction/Commissioning (previous file: Scoping). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedScoping → Under Construction/CommissioningReceipt: NESO TEC Register, file dated 20 Oct 2026, row 198Receipt: NESO TEC Register, file dated 11 Sep 2026, row 196
  2. 20 Oct 2026. MW Effective From printed as 30 Jun 2024 (previous file: 31 Oct 2024), 123 days earlier. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. -123 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 198Receipt: NESO TEC Register, file dated 11 Sep 2026, row 196

Supported by National Energy SO Open Data