Developer as published, connection site, reference: GALILEO 14 LIMITED. Staffordshire Connection Node C 400Kv Substation (NGET). PRO-006019.

Sign in to watch this project
Capacity200 MWBattery storage, Gate 1
Connection date31 Oct 2037Status as printed: Scoping
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20372038File dated 2026-03-27: connection date 2037-10-31Oct 2037File dated 2026-10-20: connection date 2037-10-3127 Mar202620 Oct2026
20372038File dated 2026-03-27: connection date 2037-10-31Oct 2037File dated 2026-10-20: connection date 2037-10-3127 Mar202620 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 27 Mar 2026 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 847Receipt: NESO TEC Register, file dated 11 Sep 2026, row 826

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.