N84 Grid

Ratcliffe-on-Soar (ENSO GREEN HOLDINGS C LIMITED)

Developer as published, connection site, reference: ENSO GREEN HOLDINGS C LIMITED. Ratcliffe-On-Soar 400kV Substation (NGET). PRO-001361. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWHybrid, Gate 1
Connection date30 Jul 2029Status as printed: Scoping
First date seen 31 Oct 2035, difference -2284 dayscalculated by N84
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20292030File dated 2024-05-31: connection date 2029-07-30Jul 2029File dated 2026-04-17: connection date 2029-07-3031 May202417 Apr2026
20292030File dated 2024-05-31: connection date 2029-07-30Jul 2029File dated 2026-04-17: connection date 2029-07-3031 May202417 Apr2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 17 Apr 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.