Daer Wind Farm (RWE Renewables UK Onshore Wind Limited)

Developer as published, connection site, reference: RWE Renewables UK Onshore Wind Limited. Daer Wind Farm 132/33kV (SPT). PRO-000565.

Sign in to watch this project
Capacity96 MWOnshore wind
Connection date1 Aug 2028Status as printed: Awaiting Consents
First date seen 14 Jul 2027, difference +384 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20282029File dated 2024-05-31: connection date 2028-08-01Aug 2028File dated 2026-10-20: connection date 2028-08-0131 May202420 Oct2026
20282029File dated 2024-05-31: connection date 2028-08-01Aug 2028File dated 2026-10-20: connection date 2028-08-0131 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Project Status printed as Awaiting Consents (previous file: Scoping). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedScoping → Awaiting ConsentsReceipt: NESO TEC Register, file dated 20 Oct 2026, row 547Receipt: NESO TEC Register, file dated 11 Sep 2026, row 538