N84 Grid

Thurrock Power Station

Developer as published, connection site, reference: THURROCK FLEXIBLE GENERATION LIMITED. Tilbury 275kV Substation (NGET). PRO-000494.

Sign in to watch this project
Capacity750 MWHybrid, Gate 2
Connection date30 Jun 2026Status as printed: Built
First date seen 31 Oct 2024, difference +607 dayscalculated by N84
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20262027File dated 2024-05-31: connection date 2026-06-30Jun 2026File dated 2024-12-20: connection date 2026-06-3031 May202420 Dec2024
20262027File dated 2024-05-31: connection date 2026-06-30Jun 2026File dated 2024-12-20: connection date 2026-06-3031 May202420 Dec2024

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Dec 2024. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Printed as connected: 750 MW. Status as printed: Built (previous file: Under Construction/Commissioning). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 2024Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1996
  2. 20 Oct 2026. Gate printed as 2 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 2Receipt: NESO TEC Register, file dated 20 Oct 2026, row 2024Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1996

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.