Finlarig (SSE GENERATION LIMITED)

Developer as published, connection site, reference: SSE GENERATION LIMITED. Killin GSP (SHET). PRO-000079.

Sign in to watch this project
Capacity35 MWHydro and pumped storage
Connection date30 Nov 2031Status as printed: Scoping
MW ahead in N84's order at this site92.5 MWcalculated by N84

Connection date, edition by edition

20312032File dated 2024-05-31: connection date 2031-11-30Nov 2031File dated 2024-09-27: connection date 2031-11-3031 May202427 Sep2024
20312032File dated 2024-05-31: connection date 2031-11-30Nov 2031File dated 2024-09-27: connection date 2031-11-3031 May202427 Sep2024

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 27 Sep 2024. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.