Queue movers: the TEC Register, edition by edition

What changed between consecutive editions of NESO's Transmission Entry Capacity (TEC) Register, as printed. Supported by National Energy SO Open Data.

File dated 21 Mar 2025compared withFile dated 22 Jul 2025How the files are matchedThe file dated 21 Mar 2025 is an archived copy (Internet Archive), not a file N84 collected from NESO.

N84 holds no copy between 21 Mar 2025 and 22 Jul 2025; each change below happened at some point in that time, not necessarily this week. Wide comparisons

Changes between the two files

560 changesacross 553 projects. Net change +90.81 GW (new, left the register and capacity changes), plus 819 MW back on the register after being absent from the archived copies dated 27 Sep 2024, 20 Dec 2024 and 21 Mar 2025 (Internet Archive).
Rows matched on Project Number. "Back on the register": absent from the previous file N84 holds, printed again in this one. Net change calculated by N84 from Cumulative Total Capacity as printed. NESO TEC Register, files dated 21 Mar 2025 and 22 Jul 2025. Supported by National Energy SO Open Data.
Table view
Changes by type
TypeChanges
New on the register336
Left the register99
Status, stage or gate changed65
Capacity changed51
Back on the register9

Capacity in and out

TEC file dated 22 Jul 2025 against 21 Mar 2025 (archived copy)

New: +125.7 GW+125.7 GWNewCapacity up: +3.2 GW+3.2 GWCapacity upCapacity down: −8.2 GW−8.2 GWCapacity downRemoved: −30.0 GW−30.0 GWRemovedNet: 90.8 GW90.8 GWNet
New: +125.7 GW+125.7 GWNewCapacity up: +3.2 GW+3.2 GWCapacityupCapacity down: −8.2 GW−8.2 GWCapacitydownRemoved: −30.0 GW−30.0 GWRemovedNet: 90.8 GW90.8 GWNet

Not in the chart: 819 MW across 9 projects back on the register, absent from the archived copies dated 27 Sep 2024, 20 Dec 2024 and 21 Mar 2025 (Internet Archive) and printed again in the file dated 22 Jul 2025. See them

NESO TEC Register, files dated 21 Mar 2025 and 22 Jul 2025. Supported by National Energy SO Open Data. Capacity is Cumulative Total Capacity as printed.
Table view
Capacity in and out
StepMW
New+125,713.4
Capacity up+3,242.8
Capacity down−8,161
Removed−29,986.7
Net90,808.6
Back on the register (not in the net)819.3

Data centres in the pipeline

30 sites

Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.

See every site

Every change, in full

Every change between the two files, grouped by type
ProjectConnection siteWhat the files print
New on the register 336
Glenchamber Wind Farm
PRO-000043-1, GLENCHAMBER WIND ENERGY LIMITED
Glenluce 132/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 25.3 MW in the file dated 22 Jul 2025
Glenchamber Wind Farm
PRO-000043-2, GLENCHAMBER WIND ENERGY LIMITED
Glenluce 132/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 27.5 MW in the file dated 22 Jul 2025
Whitelee
PRO-000067-3, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 660 MW in the file dated 22 Jul 2025
Whitelee
PRO-000067-4, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 818 MW in the file dated 22 Jul 2025
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174-1, SSE Generation Limited
Lochay GSP
Hydro
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 45 MW in the file dated 22 Jul 2025
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174-2, SSE Generation Limited
Lochay GSP
Hydro
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 51.2 MW in the file dated 22 Jul 2025
East Anglia One North
PRO-000269-1, EAST ANGLIA ONE LIMITED
Friston 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 860 MW in the file dated 22 Jul 2025
East Anglia One North
PRO-000269-2, EAST ANGLIA ONE LIMITED
Friston 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 880 MW in the file dated 22 Jul 2025
Sanquhar II Wind Farm
PRO-000352-1, SANQUHAR II COMMUNITY WIND CO LTD
Glenglass 132kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 137 MW in the file dated 22 Jul 2025
Sanquhar II Wind Farm
PRO-000352-2, SANQUHAR II COMMUNITY WIND CO LTD
Glenglass 132kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 250 MW in the file dated 22 Jul 2025
West Burton B
PRO-000369-3, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,881 MW in the file dated 22 Jul 2025
Bramford Tertiary
PRO-000397-1, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Bramford Tertiary
PRO-000397-2, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Cryogenic Battery System (Synchronous)
PRO-000549-1, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 0 MW in the file dated 22 Jul 2025
Cryogenic Battery System (Synchronous)
PRO-000549-2, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
OWPL Windfarm
PRO-000568-3, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,500 MW in the file dated 22 Jul 2025
OWPL Windfarm
PRO-000568-4, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 2,250 MW in the file dated 22 Jul 2025
Ferrybridge D
PRO-001020-4, KEADBY GENERATION LIMITED
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;OCGT (Open Cycle Gas Turbine);Hydrogen
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,420 MW in the file dated 22 Jul 2025
Longfield Solar
PRO-001053-1, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Longfield Solar
PRO-001053-2, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Laleham
PRO-001063-1, Juniper Energy Limited
Laleham 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Laleham
PRO-001063-2, Juniper Energy Limited
Laleham 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 90 MW in the file dated 22 Jul 2025
Sellindge (Tertiary)
PRO-001067-1, PIVOTED POWER LLP
Sellindge 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Sellindge (Tertiary)
PRO-001067-2, PIVOTED POWER LLP
Sellindge 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 76 MW in the file dated 22 Jul 2025
Harestanes West Wind Farm
PRO-001075-1, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Old Forest of Ae 33kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 56 MW in the file dated 22 Jul 2025
Harestanes West Wind Farm
PRO-001075-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Old Forest of Ae 33kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 81 MW in the file dated 22 Jul 2025
Walpole
PRO-001114-1, HOLLYGREEN ENERGYFARM LIMITED
Walpole 400kV substations
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Walpole
PRO-001114-2, HOLLYGREEN ENERGYFARM LIMITED
Walpole 400kV substations
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Landulph
PRO-001131-1, PIVOTED POWER LLP
Landulph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Landulph
PRO-001131-2, PIVOTED POWER LLP
Landulph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Glendye Wind Farm
PRO-001389-1, GLENDYE WIND FARM LIMITED
Glendye Wind Farm Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 124.8 MW in the file dated 22 Jul 2025
Glendye Wind Farm
PRO-001389-2, GLENDYE WIND FARM LIMITED
Glendye Wind Farm Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 166.8 MW in the file dated 22 Jul 2025
Green Volt Offshore Windfarm
PRO-001469-3, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 22 Jul 2025
Green Volt Offshore Windfarm
PRO-001469-4, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 560 MW in the file dated 22 Jul 2025
Mon Solar Farm
PRO-001480-1, LIGHTSOURCE SPV 204 LIMITED
Wylfa South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Mon Solar Farm
PRO-001480-2, LIGHTSOURCE SPV 204 LIMITED
Wylfa South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 360 MW in the file dated 22 Jul 2025
Lamford Hill
PRO-001481-1, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 20 MW in the file dated 22 Jul 2025
Lamford Hill
PRO-001481-2, BENBRACK WIND FARM LIMITED
Benbrack Wind Farm 132/33kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 42 MW in the file dated 22 Jul 2025
Bellrock Offshore Wind Farm
PRO-001496-1
Lyra 320/66kV Offshore Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,200 MW in the file dated 22 Jul 2025
Bellrock Offshore Wind Farm
PRO-001496-2
Lyra 320/66kV Offshore Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,800 MW in the file dated 22 Jul 2025
Mwdwl Eithin Energy Park
PRO-001511-1, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 81.2 MW in the file dated 22 Jul 2025
Mwdwl Eithin Energy Park
PRO-001511-2, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 81.2 MW in the file dated 22 Jul 2025
Salamander Offshore Wind Farm
PRO-001512-1, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead GSP
Energy Storage System;Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Salamander Offshore Wind Farm
PRO-001512-2, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead GSP
Energy Storage System;Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Stromar Offshore Windfarm
PRO-001530-1, Stromar Offshore Wind Farm Limited
New Deer 2 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Stromar Offshore Windfarm
PRO-001530-2, Stromar Offshore Wind Farm Limited
New Deer 2 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,500 MW in the file dated 22 Jul 2025
Gwynt Alwen WF
PRO-001545-1, WIND 2 LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 108 MW in the file dated 22 Jul 2025
Gwynt Alwen WF
PRO-001545-2, WIND 2 LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 108 MW in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551-1, COYLTON ENERGY LIMITED
Coylton 275/33kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551-2, COYLTON ENERGY LIMITED
Coylton 275/33kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551-3, COYLTON ENERGY LIMITED
Coylton 275/33kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 450 MW in the file dated 22 Jul 2025
Morgan Offshore Wind Farm
PRO-001594-1, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,500 MW in the file dated 22 Jul 2025
Morgan Offshore Wind Farm
PRO-001594-2, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,500 MW in the file dated 22 Jul 2025
Morgan Offshore Wind Farm
PRO-001594-3, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,500 MW in the file dated 22 Jul 2025
SSE Ferrybridge BESS
PRO-001614-1, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
SSE Ferrybridge BESS
PRO-001614-2, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
SSE Ferrybridge BESS
PRO-001614-3, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Staythorpe (BESS and PV)
PRO-001615-1, SSE STAYTHORPE POWER LIMITED
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 437 MW in the file dated 22 Jul 2025
Zenobe Blackhillock 300 MW
PRO-001624-3, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 720 MW in the file dated 22 Jul 2025
Ironbridge
PRO-001629-1, IGP SOLAR 16 LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Ironbridge
PRO-001629-2, IGP SOLAR 16 LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Flash Solar Farm
PRO-001634-3, ELEMENTS GREEN TRENT LTD
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 800 MW in the file dated 22 Jul 2025
Flash Solar Farm
PRO-001634-4, ELEMENTS GREEN TRENT LTD
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 800 MW in the file dated 22 Jul 2025
Exeter BESS
PRO-001666-1, Exeter Storage Limited
Exeter 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 290 MW in the file dated 22 Jul 2025
Exeter BESS
PRO-001666-2, Exeter Storage Limited
Exeter 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 680 MW in the file dated 22 Jul 2025
Drakelow Green Energy Centre
PRO-001693-3, DRAKELOW GREEN ENERGY LIMITED
Drakelow 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Penwortham Green Energy Centre
PRO-001694-3, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Penwortham Green Energy Centre
PRO-001694-4, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Harker Green Energy Centre
PRO-001709-1, Blackdyke BESS Limited
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Harker Green Energy Centre
PRO-001709-2, Blackdyke BESS Limited
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Harker Green Energy Centre
PRO-001709-3, Blackdyke BESS Limited
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Harker Green Energy Centre
PRO-001709-4, Blackdyke BESS Limited
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762-1, SSE UTILITY SOLUTIONS LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762-2, SSE UTILITY SOLUTIONS LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Hams Hall Green Energy Centre
PRO-001765-3, HAMS HALL GREEN ENERGY LIMITED
Hams Hall 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Afon Ddaw
PRO-001775-2, LIGHTSOURCE SPV 214 LIMITED
Aberthaw 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249 MW in the file dated 22 Jul 2025
Kearsley North Green Energy Centre
PRO-001793-1
Kearsley 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Kearsley North Green Energy Centre
PRO-001793-2
Kearsley 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Penwortham BESS
PRO-001804-1, PENWORTHAM (BES) LTD
Penwortham 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Penwortham BESS
PRO-001804-2, PENWORTHAM (BES) LTD
Penwortham 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Springwell
PRO-001850-3, SPRINGWELL ENERGYFARM LIMITED
Navenby 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,600 MW in the file dated 22 Jul 2025
Kirkby Green Energy Centre
PRO-001869-1, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Kirkby Green Energy Centre
PRO-001869-2, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Kirkby Green Energy Centre
PRO-001869-3, KIRKBY GREEN NG LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Hirfynydd and Mynydd Drumaur
PRO-001899-1, EDF ENERGY RENEWABLES LIMITED
Swansea North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 229.9 MW in the file dated 22 Jul 2025
Hirfynydd and Mynydd Drumaur
PRO-001899-2, EDF ENERGY RENEWABLES LIMITED
Swansea North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249 MW in the file dated 22 Jul 2025
Daines Green Energy Centre
PRO-001902-1, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 480 MW in the file dated 22 Jul 2025
Daines Green Energy Centre
PRO-001902-2, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 480 MW in the file dated 22 Jul 2025
Daines Green Energy Centre
PRO-001902-3, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 480 MW in the file dated 22 Jul 2025
Cloud Hill Windfarm
PRO-001938-1, Cloud Hill Windfarm Limited
Glenglass 132/33kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
Cloud Hill Windfarm
PRO-001938-2, Cloud Hill Windfarm Limited
Glenglass 132/33kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 60 MW in the file dated 22 Jul 2025
Frodsham Solar Park
PRO-001952-1, Frodsham Solar Limited
Frodsham 132kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Frodsham Solar Park
PRO-001952-2, Frodsham Solar Limited
Frodsham 132kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Bicker Fenn Energy Park
PRO-001984-1, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Bicker Fenn Energy Park
PRO-001984-2, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Bicker Fenn Energy Park
PRO-001984-3, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Tween Bridge Solar Park
PRO-001990-3, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
Trent Valley North Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 590 MW in the file dated 22 Jul 2025
Lapwing Fen II
PRO-001995, Eclipse Power Networks Limited
Walpole 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249.6 MW in the file dated 22 Jul 2025
Daines BESS
PRO-002050-1, SSE DAINES BESS LIMITED
Daines 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Daines BESS
PRO-002050-2, SSE DAINES BESS LIMITED
Daines 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Cowley Energy Storage
PRO-002066-1, BW ESS Development UK Limited
Cowley 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Cowley Energy Storage
PRO-002066-2, BW ESS Development UK Limited
Cowley 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 22 Jul 2025
Capenhurst Tertiary
PRO-002162, ENSO GREEN HOLDINGS Q LIMITED
Capenhurst 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
High Marnham 400
PRO-002194-1, ENSO GREEN HOLDINGS X LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
High Marnham 400
PRO-002194-2, ENSO GREEN HOLDINGS X LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Ocker Hill - Gresham House
PRO-002213-1, Ocker Hill Storage Limited
Ocker Hill 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Ocker Hill - Gresham House
PRO-002213-2, Ocker Hill Storage Limited
Ocker Hill 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Mablethorpe Green Energy Centre
PRO-002255-1, MABLETHORPE GREEN ENERGY CENTRE LIMITED
Mablethorpe 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Mablethorpe Green Energy Centre
PRO-002255-2, MABLETHORPE GREEN ENERGY CENTRE LIMITED
Mablethorpe 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Hawthorn Pit Green Energy Centre
PRO-002282-1, INNOVA RENEWABLES LIMITED
Hawthorn Pit 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Hawthorn Pit Green Energy Centre
PRO-002282-2, INNOVA RENEWABLES LIMITED
Hawthorn Pit 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Pentir Green Energy Centre
PRO-002345-1, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Pentir Green Energy Centre
PRO-002345-2, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
Greystone Knowe Windfarm
PRO-002370, GREYSTONE KNOWE WINDFARM LIMITED
Greystone Knowe 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 67.2 MW in the file dated 22 Jul 2025
East Claydon Green Energy Centre
PRO-002383-1, INNOVA RENEWABLES LIMITED
East Claydon 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,025 MW in the file dated 22 Jul 2025
East Claydon Green Energy Centre
PRO-002383-2, INNOVA RENEWABLES LIMITED
East Claydon 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 2,050 MW in the file dated 22 Jul 2025
Scottish Water Linwood STW 60MW BESS
PRO-002412, Bluestone Energy Ltd
Jonhstone 132/33kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 60 MW in the file dated 22 Jul 2025
Scottish Water Laigh Park STW
PRO-002413, Bluestone Energy Ltd
Braehead Park 132/33kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
Berwick Bank Offshore Wind Farm A
PRO-002627-1, BERWICK BANK A LIMITED
Branxton 400/132KV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,150 MW in the file dated 22 Jul 2025
Berwick Bank Offshore Wind Farm A
PRO-002627-2, BERWICK BANK A LIMITED
Branxton 400/132KV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,380 MW in the file dated 22 Jul 2025
Drax BECCS
PRO-002629, Drax Power Limited
Drax 400kV Substation
Biomass;Demand
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 3,906 MW in the file dated 22 Jul 2025
Lyndhurst Camperdown BESS
PRO-002658, Geocore Ltd
Charleston GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Waltham Cross Farm 2
PRO-002748-1, Waltham Cross 7 Renewables Limited
Waltham Cross B 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 700 MW in the file dated 22 Jul 2025
Waltham Cross Farm 2
PRO-002748-2, Waltham Cross 7 Renewables Limited
Waltham Cross B 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,400 MW in the file dated 22 Jul 2025
Craighead Wind Farm
PRO-002821, GALILEO 02 LIMITED
Westfield 132/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 77 MW in the file dated 22 Jul 2025
Carseview Road BESS
PRO-003169, Vital Energi Solutions Limited
Lunanhead 2 GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Henley Downs Farm BESS
PRO-003171, Ninfield BESS Ltd
East Kent Connection Node A 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Vale of Leven Wind Farm
PRO-003214, Vale of Leven Wind Farm Limited
Vale of Leven 132kV substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 72 MW in the file dated 22 Jul 2025
Airds Hill Wind Farm
PRO-003545, Onpath Energy Limited
Glenmuckloch 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 80 MW in the file dated 22 Jul 2025
Gilbertfield Farm BESS
PRO-003564, GPC 678 LTD
Clydesmill 275/33kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 40 MW in the file dated 22 Jul 2025
Leslie 200MW BESS
PRO-003609, Apatura Battery Ltd
Leslie 200MW BESS 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Coldstream Solar PV Plant
PRO-003635, Conrad Energy (Developments) II Limited
Eccles GSP
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 40.56 MW in the file dated 22 Jul 2025
SPITTAL
PRO-003687, SPITTAL BATTERY STORAGE LIMITED
Mybster 132/33kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Pollie Hill Wind Farm
PRO-003767, POLLIE HILL WIND FARM LIMITED
Brora GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 92.4 MW in the file dated 22 Jul 2025
Auldhouse 200MW BESS
PRO-003825
Auldhouse 400kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
AGS Inverclyde BESS
PRO-003840, Advance Grid Solutions Limited
Spango Valley GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 99 MW in the file dated 22 Jul 2025
Norwich Main BESS
PRO-003894-1, LONG STRATTON ENERGY PARK LIMITED
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249.9 MW in the file dated 22 Jul 2025
Norwich Main BESS
PRO-003894-2, LONG STRATTON ENERGY PARK LIMITED
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 949.9 MW in the file dated 22 Jul 2025
Fiddlers Ferry BESS
PRO-003897-1, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 22 Jul 2025
Fiddlers Ferry BESS
PRO-003897-2, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Fiddlers Ferry BESS
PRO-003897-3, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 900 MW in the file dated 22 Jul 2025
Cottered - PVDP
PRO-003999, SolarNine Ltd
West Anglia Connection Node D 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 520 MW in the file dated 22 Jul 2025
PVDP Woodbridge
PRO-004000, SolarSeven Ltd
South Anglia Connection Node E 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 610 MW in the file dated 22 Jul 2025
Garscadden Park
PRO-004103, GARSCADDEN PARK LIMITED
Windyhill 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Welbeck-Newark Solar Farm - PVDP
PRO-004138, SolarTen Ltd
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 710 MW in the file dated 22 Jul 2025
Ludgershall - Bicester Solar Farm PVDP
PRO-004140, SolarFour Ltd
Chiltern Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Achanalt Battery Storage
PRO-004221, ADTEK LIMITED
Grudie Bridge GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Drakelow Power Station 2 BESS
PRO-004243, Bluestone Energy Ltd
Drakelow GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Kincorth BESS
PRO-004281, KINCORTH ENERGY STORAGE SYSTEM LTD
Redmoss GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 19.8 MW in the file dated 22 Jul 2025
Bicker Fen
PRO-004295, IB VOGT UK LTD
Trent Valley South Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Brunt Hill Wind Farm
PRO-004322, Brunt Hill Limited
Westfield 132/33kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 99 MW in the file dated 22 Jul 2025
Nursling Flexible Generation
PRO-004325, SOUTH ENG FLEXIBLE GENERATION LIMITED
Nursling 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,500 MW in the file dated 22 Jul 2025
West Common Ipers Lane
PRO-004352, INNOVA RENEWABLES LIMITED
Fawley GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Calderdale Wind Farm 240 MW
PRO-004365, CALDERDALE WIND FARM LTD
Rochdale GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 170 MW in the file dated 22 Jul 2025
Banc y Celyn Energy Park
PRO-004395, Wind 2 Project 2 Limited
Rassau GSP
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 165 MW in the file dated 22 Jul 2025
Kirkan Wind Farm
PRO-004401, KIRKAN WIND FARM LIMITED
Corriemoillie 2 400/132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 81.6 MW in the file dated 22 Jul 2025
Greenburn Wind & BESS
PRO-004407, HM GB (WIND) LTD
Coupar Angus 2 GSP
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Shaw Lane BESS
PRO-004439, SHAW LANE BESS LIMITED
Elland 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 230 MW in the file dated 22 Jul 2025
Upper College Farm BESS
PRO-004451, Bluestone Energy Ltd
Hurst GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 480 MW in the file dated 22 Jul 2025
Patmores (Mott Street)
PRO-004452, INNOVA RENEWABLES LIMITED
Brimsdown GSP (EPN)
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Mansfield Road BESS
PRO-004453, BOULTBEE BROOKS ENERGY STORAGE LIMITED
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Forepower Lincoln (250) Ltd
PRO-004455, FOREPOWER LINCOLN (250) LIMITED
Navenby 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Ayr Flexpower
PRO-004489, Scot Stability Limited
Ayr 275/33kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 450 MW in the file dated 22 Jul 2025
North Ray Solar Farm 2
PRO-004502, NORTH RAY SOLAR FARM 2 LTD
Grimsby West GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 180 MW in the file dated 22 Jul 2025
Fauldielaw
PRO-004503, Cairn Duhie Energy Limited
Arbroath GSP
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Brodsworth High Impact Green Energy Hub (Brodsworth HIGEH)
PRO-004506, TELIS ENERGY UK LIMITED
Brodsworth 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Huntingdon High Impact Energy Hub 2
PRO-004508, TELIS ENERGY UK LIMITED
Huntingdon 2 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Melton Mowbray High Impact Energy Hub 1
PRO-004509, TELIS ENERGY UK LIMITED
West Melton GSP
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Melton Mowbray High Impact Energy Hub 2
PRO-004510, TELIS ENERGY UK LIMITED
West Anglia Connection Node I 400kV substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
INTOG 2
PRO-004514, CERULEAN WINDS LIMITED
Thorntonloch 400kV Substation
Wind Offshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,400 MW in the file dated 22 Jul 2025
Middleshaw BESS
PRO-004516, Harmony MS Limited
Hutton 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Stretchford Farm Solar and Storage
PRO-004522, BSR APPLICATIONS LIMITED
Abham 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Necton High Impact Energy Hub
PRO-004524, TELIS ENERGY UK LIMITED
Necton 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Newchurch High Impact Energy Hub
PRO-004525, TELIS ENERGY UK LIMITED
Newchurch 400kV Substation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Stoneyfield
PRO-004531, WIND 2 LIMITED
Rothienorman GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 15 MW in the file dated 22 Jul 2025
FPE Ayr BESS
PRO-004532, FUTURE POWER ENTERPRISES LTD
Ayr 275/33kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Galileo 15
PRO-004537, GALILEO 15 LIMITED
Pyle 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
AGS Coatbridge
PRO-004544, Advance Grid Solutions Limited
Coatbridge GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 60 MW in the file dated 22 Jul 2025
Grayside Wind Farm
PRO-004563, GRAYSIDE WF LTD
Grayside 132/33kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 108 MW in the file dated 22 Jul 2025
Overton Grange BESS
PRO-004580, ANESCO LIMITED
Wearside Connection Node D 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 22 Jul 2025
NatPower Medway Green Energy Park
PRO-004583, NATPOWER MARINE UK LIMITED
North Kent Connection Node A 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,000 MW in the file dated 22 Jul 2025
Afan Wind Farm and BESS
PRO-004588, Welsh Government
SOUTH WALES WEST CONNECTION NODE A 132KV SUBSTATION
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Netherton BESS
PRO-004626, HARMONY ENERGY LIMITED
Netherton 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Mill Hey_Capenhurst BESS
PRO-004669, FIRSTWAY SOLAR LTD
Capenhurst GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 199.6 MW in the file dated 22 Jul 2025
Craigneil Wind Farm
PRO-004670, ESB ASSET DEVELOPMENT UK LIMITED
Fetteresso GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 42 MW in the file dated 22 Jul 2025
ALYTH ENERGY STORAGE AND SOLAR
PRO-004680, PRIVATE ENERGY PARTNERS (UK) LTD
Alyth 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Windburn
PRO-004768, WIND 2 LIMITED
Braco West GSP
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 75 MW in the file dated 22 Jul 2025
D&G 2
PRO-004772, D&G 2 Limited
Glenluce 132/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 60 MW in the file dated 22 Jul 2025
New Little Horsted 200MW Solar and BESS
PRO-004783, PRIVATE ENERGY PARTNERS (UK) LTD
Sussex and Romney Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Saver & Pashley Farm Energy Park
PRO-004789, ELGIN ENERGY ES CO LIMITED
Ninfield GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 129.9 MW in the file dated 22 Jul 2025
Hurlet Battery
PRO-004790, P-FREQUENCY LTD
Neilston 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Astwood Solar Farm GEC
PRO-004799, ASTWOOD GREEN ENERGY LTD
West Anglia Connection Node G 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 520 MW in the file dated 22 Jul 2025
Burdiehouse BESS
PRO-004803, IB VOGT UK LTD
Kaimes 275/33kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
GALILEO 12 LIMITED
PRO-004804, GALILEO 12 LIMITED
Fetteresso 132kV substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150.8 MW in the file dated 22 Jul 2025
NatPower Hartlepool Green Energy Park
PRO-004818, NP SPV34 LIMITED
Hartmoor 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 800 MW in the file dated 22 Jul 2025
Woodbridge - Noventum
PRO-004822, NOVENTUM POWER SOLAR 16 LIMITED
South Anglia Connection Node E 400kV Substation
Demand;Energy Storage System;Reactive Compensation
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Pelham 400
PRO-004867, ENSO GREEN HOLDINGS X LIMITED
Pelham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Long Buckby Solar/BESS
PRO-004873, GREENTECH PROJECTS HOLDING UK LIMITED
Patford Bridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Daviot Windfarm BEGA
PRO-004874, CUBICO UK DEVELOPMENT LIMITED
Inverness GSP
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 45 MW in the file dated 22 Jul 2025
High Brenfield 2
PRO-004876, High Brenfield Wind Farm Limited
Craig Murrail GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 20.4 MW in the file dated 22 Jul 2025
GALILEO 08 LIMITED
PRO-004886, GALILEO 08 LIMITED
Mid Wales Connection Node A
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Calon y Gwynt
PRO-004896, Wind 2 Project 3 Limited
Mid Wales Connection Node A
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 72 MW in the file dated 22 Jul 2025
Manor Farm_Sidcup
PRO-004899, FIRSTWAY SOLAR LTD
Hurst GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 199.6 MW in the file dated 22 Jul 2025
Shire End Solar Farm
PRO-004902, QAIR SCOTLAND LIMITED
Abernethy GSP
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 20 MW in the file dated 22 Jul 2025
Torness BESS Station
PRO-004904, IB VOGT UK LTD
Branxton 400/132kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Elmya Ryston BESS & PV
PRO-004923, ELMYA ENERGY UK 13 LIMITED
North Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 850 MW in the file dated 22 Jul 2025
Killingholme Energy Park
PRO-004935, EXAGEN GROUP LIMITED
Keadby 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Brigton of Ruthven BESS
PRO-004937, MORRIS LESLIE LIMITED
Alyth 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
50MW BESS Connagill
PRO-004938, Cerulisia Ltd
Connagill 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
Middlewick Wind
PRO-004940, DENGIE MARSHES WIND FARM LIMITED
Rayleigh Main GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 120 MW in the file dated 22 Jul 2025
Altnabreac Windfarm
PRO-004941, ALTNABREAC WIND FARM LIMITED
Connagill 275kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 130 MW in the file dated 22 Jul 2025
Vicarage Drove BESS
PRO-004943, UK Transition Power Holdings Limited
Trent Valley South Connection Node A 400k
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 2,400 MW in the file dated 22 Jul 2025
Chirton Grange
PRO-004948, ELAWAN ENERGY UK LIMITED
Tynemouth GSP (NPG)
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Valley Farm
PRO-004969, STARLIGHT ENERGY UK LIMITED
Bishops Wood GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 99.9 MW in the file dated 22 Jul 2025
Hazel Solar
PRO-004981, HAZEL SOLAR LTD
Hawthorn Pit GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Shrewsbury Energy
PRO-004982, SHREWSBURY ENERGY LTD
Shrewsbury GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 149.6 MW in the file dated 22 Jul 2025
Trafford 2 BESS
PRO-004992, CARLTON POWER DEVELOPMENTS NO. 8 LIMITED
Carrington 400KV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,400 MW in the file dated 22 Jul 2025
Blackbraes PV+BESS
PRO-005005, CHINT SOLAR UK MANAGEMENT LTD
Blackbraes IDNO GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
Lythmore
PRO-005007, QAIR SCOTLAND LIMITED
Thurso South 275kV Substation’
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Drakelow Power Station 4
PRO-005008, Bluestone Energy Ltd
Drakelow GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Lightsource Bargatton Farm
PRO-005009, Lightsource Renewable UK Development Limited
Tongland 132/11kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Craigdarroch Hybrid Wind and BESS
PRO-005012, VOLTALIA UK LTD
Craigdarroch Hybrid Wind & BESS Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 159.2 MW in the file dated 22 Jul 2025
Cott's Farm
PRO-005017, BORALEX LIMITED
Cott's Farm 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Galileo 07 Limited
PRO-005029, GALILEO 07 LIMITED
Cassley GSP
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Lessnessock Energy Park
PRO-005033, RENEWCO POWER LIMITED
Lessnessock
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 114 MW in the file dated 22 Jul 2025
Acheilidh Wind Farm
PRO-005042, ENERGYFARM UK ACHEILIDH LTD
Lairg II Wind Farm 132/33kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 84.2 MW in the file dated 22 Jul 2025
NEL Conway2
PRO-005043, Newton Energi Limited
Ferrybridge B GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Derwydd Bach Energy Park
PRO-005044, CONSTANTINE WIND ENERGY LIMITED
Gwyddelwern 400kV Substation
PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 85 MW in the file dated 22 Jul 2025
The Beacon
PRO-005046, Beacon Solar Limited
Alverdiscott GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 1,200 MW in the file dated 22 Jul 2025
Boreham
PRO-005048, EDF ENERGY RENEWABLES LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Royle Farm BESS
PRO-005050, ALUDRA BESS LTD
Drakelow 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 90 MW in the file dated 22 Jul 2025
Sweet Briar Energy Park
PRO-005055, SWEET BRIAR 2 ENERGY PARK LIMITED
South Humber Connection Node A
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 800 MW in the file dated 22 Jul 2025
Taigh an Uillt Energy Storage Park
PRO-005058, Downing Renewable Developments LLP
ICHRACHAN 132/33KV GRID SUPPLY POINT SUBSTATION
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Patford Bridge BESS
PRO-005065, Kona Energy Limited
Derbyshire Connection Node I 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 228 MW in the file dated 22 Jul 2025
Balnespick Wind Farm
PRO-005066, FRED. OLSEN RENEWABLES LIMITED
Tomatin 275/132 kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 58 MW in the file dated 22 Jul 2025
Ninfield BESS
PRO-005070, Kona Energy Limited
Ninfield 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 225 MW in the file dated 22 Jul 2025
Church Road Farm
PRO-005074, QAIR RENEWABLES UK LIMITED
Burwell GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Strawberry Farm
PRO-005077, QAIR RENEWABLES UK LIMITED
Walpole GSP (EPN)
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 277.9 MW in the file dated 22 Jul 2025
KENLEY HOUSE SOLAR PARK
PRO-005078, BOOM DEVELOPMENTS LTD
Creyke Beck GSP
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
UK057-B Whatton Estate
PRO-005079-1, ENIF BESS LIMITED
Ratcliffe GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 130 MW in the file dated 22 Jul 2025
UK057-B Whatton Estate
PRO-005079-2, ENIF BESS LIMITED
Ratcliffe GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 130 MW in the file dated 22 Jul 2025
Lanehurst Farm BESS
PRO-005083, ELGIN ENERGY ES CO LIMITED
Bolney GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 225 MW in the file dated 22 Jul 2025
Great Oak Solar
PRO-005093, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
South Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 700 MW in the file dated 22 Jul 2025
Hesta Head
PRO-005100, HESTA HEAD WIND FARM LIMITED
Finstown (Orkney) GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 20.4 MW in the file dated 22 Jul 2025
Costa Head
PRO-005102, COSTA HEAD WIND FARM LIMITED
Finstown (Orkney) GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 16.32 MW in the file dated 22 Jul 2025
Stack Hill Solar and Storage
PRO-005105, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 350 MW in the file dated 22 Jul 2025
Prestwold BESS
PRO-005106, GREENTECH PROJECTS HOLDING UK LIMITED
Ratcliffe-On-Soar 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Barns of Wedderburn (ABEI ENERGY GREEN VI)
PRO-005108, ABEI ENERGY LIMITED
Milton of Craigie GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 18 MW in the file dated 22 Jul 2025
Feckenham 100MW BESS
PRO-005111, ENERGYCOG LTD
Feckenham GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Rayleigh GP3
PRO-005113, ENSO GREEN HOLDINGS J LIMITED
Rayleigh Main 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 30 MW in the file dated 22 Jul 2025
KXP Immingham
PRO-005115, KXP IMMINGHAM LIMITED
Grimsby West 400/132 GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 80 MW in the file dated 22 Jul 2025
BTGBBIK01 - BICKER FEN 400MW BESS
PRO-005116, Virmati Energy Ltd
Bicker Fen 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
GALILEO 16
PRO-005117, GALILEO 16 LIMITED
Gala North 400/132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 125 MW in the file dated 22 Jul 2025
Huntington Solar PV
PRO-005118, EDF ENERGY RENEWABLES LIMITED
West Anglia Connection Node D 400kV Substation
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Pitkevy BESS
PRO-005119, HARMONY ENERGY LIMITED
Conland Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
NatPower Harburn Green Energy Park
PRO-005123, YAXLEY ENERGY LIMITED
NatPower Harburn Green Energy Park 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 800 MW in the file dated 22 Jul 2025
Witney BESS
PRO-005136, VOLTWISE POWER HOLDINGS LIMITED
Cowley GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Tarvie Wind Farm
PRO-005149, Koehler Renewable Energy UK Limited
Beauly substation 275KV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 77 MW in the file dated 22 Jul 2025
Martindale Farm
PRO-005153, BSR APPLICATIONS LIMITED
Hartmoor GSP
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 239.9 MW in the file dated 22 Jul 2025
Culachy Wind Farm
PRO-005184, FRED. OLSEN RENEWABLES LIMITED
Fort Augustus 400kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 115 MW in the file dated 22 Jul 2025
Limekiln Extension 2
PRO-005255, BORALEX LIMITED
Limekilns 132/33kV substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 171 MW in the file dated 22 Jul 2025
Leuchland Energy Centre A
PRO-005765, Renewable Connections Developments Limited
Leuchland Farm IDNO
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Leuchland Energy Centre B
PRO-005767, Renewable Connections Developments Limited
Leuchland Farm IDNO
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57 MW in the file dated 22 Jul 2025
Longside BESS
PRO-005789, BAYWA R.E. UK LIMITED
Netherton 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Hylton Bridge - Sunderland
PRO-005802, SSE ENTERPRISE LIMITED
Wearside Connection Node B 2 400kV Substation
Demand;Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Edrom Green Energy Park
PRO-005818, NP SPV 45 Limited
Kelloe Mains 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
CRT Keadby 2
PRO-005846, Bluestone Energy Ltd
Keadby GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Upminster Warley 3
PRO-005848, Bluestone Energy Ltd
Warley GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Seat Hill Wind Farm
PRO-005850, ORSTED ONSHORE UK LIMITED
Seat Hill 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 90 MW in the file dated 22 Jul 2025
Shielburn Energy Park
PRO-005863, SUNLAWS DEVELOPMENT COMPANY LIMITED
Fallago 400/33kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.5 MW in the file dated 22 Jul 2025
Scawd Law Wind Farm
PRO-005865, FRED. OLSEN RENEWABLES LIMITED
Gala North 400/132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 64 MW in the file dated 22 Jul 2025
Wern Tarw Storage
PRO-005874, CENIN RENEWABLES LIMITED
Cilfynydd 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249 MW in the file dated 22 Jul 2025
Mwyndy Storage
PRO-005875, CENIN RENEWABLES LIMITED
Aberthaw 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249 MW in the file dated 22 Jul 2025
Thurcroft Storage
PRO-005889, BSR APPLICATIONS LIMITED
Thurcroft GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Vale of Neath (Rhigos Road)
PRO-005895, ELGIN ENERGY ES CO LIMITED
Hirwaun GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 120 MW in the file dated 22 Jul 2025
Old Stoke Rd BESS
PRO-005896, CUBICO UK DEVELOPMENT LIMITED
North Anglia Connection Node A 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 105 MW in the file dated 22 Jul 2025
Crawcroft Lane Solar and Storage
PRO-005897, BSR APPLICATIONS LIMITED
New Lincolnshire Connection Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Fairgreen Energy Storage
PRO-005899, Renewable Energy Systems Limited
Rayleigh Main GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150 MW in the file dated 22 Jul 2025
Woodheads Energy Park
PRO-005912, ABO ENERGY UNITED KINGDOM LTD
Gala North 400/132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Gladsmuir Wind Farm
PRO-005915, WIND ESTATE (UK) LIMITED
Harburn 132/33kV Grid Supply Point Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 43 MW in the file dated 22 Jul 2025
YAMAL BESS
PRO-005918, OPDE UK LIMITED
Macduff GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
Scotton
PRO-005920, HARMONY ENERGY LIMITED
Knaresborough 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Pigeon House BESS
PRO-005933, VOLTWISE POWER HOLDINGS LIMITED
Solent Connection Node B 132kV Substation.
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 120 MW in the file dated 22 Jul 2025
Beinn Dearg
PRO-005936, GALILEO 19 LIMITED
Beinn Dearg Hybrid Wind Farm
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 290 MW in the file dated 22 Jul 2025
High Marnham 400MW Field BESS
PRO-005938, Virmati Energy Ltd
High Marnham 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 400 MW in the file dated 22 Jul 2025
Kyllachy Wind Farm
PRO-005941, WIND ESTATE (UK) LIMITED
Tomatin 132kV Substation Extension
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 91 MW in the file dated 22 Jul 2025
ESB Harker BESS
PRO-005942, ESB (HARKER) LTD
Harker 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 342 MW in the file dated 22 Jul 2025
Beanacre 2 BESS
PRO-005945, Grenergy Renewables UK Limited
Melksham B 400kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 249 MW in the file dated 22 Jul 2025
NAVAS BESS
PRO-005946, OPDE UK LIMITED
Lairg GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Lees Hill Renewable Energy Park
PRO-005949, FRED. OLSEN RENEWABLES LIMITED
Kelloe Mains 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 54 MW in the file dated 22 Jul 2025
Hagshaw LDES
PRO-005957, MITCHELL ENERGY LTD
Redshaw 132kV Substation.
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Mount Pleasant
PRO-005962, HARMONY ENERGY LIMITED
Bishops Wood 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Breackerie wind farm
PRO-005965, ENERGYFARM UK BREACKERIE LTD
Breackerie 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 90.8 MW in the file dated 22 Jul 2025
Craiglarie Wind Farm
PRO-005971, Invenergy Development UK Ltd
Ladyburn 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 170 MW in the file dated 22 Jul 2025
Tioram Wind Farm
PRO-005973, Invenergy Development UK Ltd
CARRADALE 3 GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 160 MW in the file dated 22 Jul 2025
Ballach
PRO-005977, ENERGYFARM UK BALLACH LTD
Ballach 132kV substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 149 MW in the file dated 22 Jul 2025
Glenvernoch
PRO-005980, ENERGYFARM UK GLENVERNOCH LTD
Glenvernoch 132kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 95.8 MW in the file dated 22 Jul 2025
Meall Dearg
PRO-005981, ENERGYFARM UK MEALL DEARG LTD
New North West 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 150.2 MW in the file dated 22 Jul 2025
Coille Linne
PRO-005983, ENERGYFARM UK COILLE LINNE LTD
Coille Linne 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 113 MW in the file dated 22 Jul 2025
Pitcox BESS
PRO-005985, ABEI ENERGY LIMITED
Dunbar 132/33kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 95.76 MW in the file dated 22 Jul 2025
GIFFORDLAND 200MW FIELD BESS
PRO-005986, Field Devco Ltd
Giffordland 400/132kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Jamesfield 3
PRO-005991, HARMONY ENERGY LIMITED
Abernethy GSP
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 50 MW in the file dated 22 Jul 2025
High Netherfauld Farm BESS
PRO-005992, ESB (SCOTLAND) LTD
Redshaw 400kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 504 MW in the file dated 22 Jul 2025
Hoolan Hills Renewable Energy Park
PRO-006001, RIDGE CLEAN ENERGY LTD
Holm Hill 132kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 66 MW in the file dated 22 Jul 2025
Vicarage Drove BESS Limited
PRO-006002, AGR RENEWABLES LIMITED
Navenby 132kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 160 MW in the file dated 22 Jul 2025
Melvich Wind Energy Hub (BEGA)
PRO-006005, Melvich Wind Energy Hub Limited
Dounreay GSP
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 43.2 MW in the file dated 22 Jul 2025
Killean Wind Farm
PRO-006009, Renewable Energy Systems Limited
CARRADALE 3 GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 60 MW in the file dated 22 Jul 2025
Allt Domhain Wind Farm
PRO-006015, ENERGYFARM ALLT DOMHAIN LTD
Carradale 1 GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 64.8 MW in the file dated 22 Jul 2025
Glasvaar
PRO-006025, E Power Limited
Craig Murrail GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 36 MW in the file dated 22 Jul 2025
Quintfall Forest Hybrid Wind and BESS 1
PRO-006032, VOLTALIA UK LTD
Gills Bay 132kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 98.5 MW in the file dated 22 Jul 2025
Lincolnshire Energy Park
PRO-006033, WIND 2 LIMITED
New Lincolnshire Connection Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Craigdow Hill Wind Farm
PRO-006036, ABEI ENERGY LIMITED
Maybole GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 38.4 MW in the file dated 22 Jul 2025
Achies BESS
PRO-006050, IGP ENERGY STORAGE 5 LIMITED
New Spittal 275kV Substation
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Cliffhope
PRO-006052, Invenergy Development UK Ltd
Hawick 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 205 MW in the file dated 22 Jul 2025
Beinneun 2 Windfarm
PRO-006053, BEINNEUN 2 LIMITED
Beinneun Windfarm 2
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 144 MW in the file dated 22 Jul 2025
Kellhead
PRO-006055, GREENTECH PROJECTS HOLDING UK LIMITED
Gretna 400/132kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 200 MW in the file dated 22 Jul 2025
Rattray BESS and Solar Plant
PRO-006056, GREENTECH PROJECTS HOLDING UK LIMITED
St Fergus
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 22 Jul 2025
Swainsthorpe
PRO-006059, Lightsource Renewable UK Development Limited
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 300 MW in the file dated 22 Jul 2025
Kinder PV & BESS Station
PRO-006063, IB VOGT UK LTD
Coddington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 240 MW in the file dated 22 Jul 2025
Glenfiddich West
PRO-006064, BORALEX LIMITED
Glenfiddich West 220 kV Substation
Demand;Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
The Drum Wind Farm
PRO-006069, WIND ESTATE (UK) LIMITED
The Drum 132KV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 57.6 MW in the file dated 22 Jul 2025
Windy Standard 1 Repower
PRO-006071, FRED. OLSEN RENEWABLES LIMITED
Dun Hill 132/33kV
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 21.9 MW in the file dated 22 Jul 2025
Windburn Wind Farm
PRO-006075, WIND 2 LIMITED
Devonside 132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 75 MW in the file dated 22 Jul 2025
Mynydd Y Gwynt
PRO-006086, EDF ENERGY RENEWABLES LIMITED
Mynydd Y Gwynt 400kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 100 MW in the file dated 22 Jul 2025
Clyde South Energy Park
PRO-006096, RENEWCO POWER LIMITED
Elvanfoot 275/132/33kV
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 120 MW in the file dated 22 Jul 2025
Ditcher Law
PRO-006102, E Power Limited
Dunlaw Extension 132/33kV
Energy Storage System;Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 53 MW in the file dated 22 Jul 2025
Killeal
PRO-006112, ABEI ENERGY LIMITED
Newton Stewart GSP
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 72.6 MW in the file dated 22 Jul 2025
Cambridgeshire Energy Storage Centre
PRO-006115, HYDROSTOR UK LTD
Burwell South 400kV Substation
Energy Storage System;Pump Storage;Thermal
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Crookedstone PV
PRO-006119, Enviromena Project Management UK Limited
Strathaven GSP 33kV
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 49.9 MW in the file dated 22 Jul 2025
Flinton Road
PRO-006121, FLINTON ROAD SOLAR LIMITED
Creyke Beck 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 600 MW in the file dated 22 Jul 2025
Forsinain Wind Farm
PRO-006123, Forsinain Forest Wind Farm Limited
Connagill 132kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 99 MW in the file dated 22 Jul 2025
Stoneygroves PV
PRO-006127, Enviromena Project Management UK Limited
Charleston GSP 132/33kV
PV Array (Photo Voltaic/solar)
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 20 MW in the file dated 22 Jul 2025
Longhaven Energy Storage Centre
PRO-006133, HYDROSTOR UK LTD
Longside 400kV Substation
Energy Storage System;Pump Storage;Thermal
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 500 MW in the file dated 22 Jul 2025
Colmealie Wind - Solar - BESS Farm
PRO-006136, Galileo 21 Limited
Fetteresso 132kV substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 112 MW in the file dated 22 Jul 2025
Ruith Cnoc
PRO-006147, Ruith Cnoc Wind Farm Limited
Dalchork 132kV Substation
Wind Onshore
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 158.4 MW in the file dated 22 Jul 2025
Longriggs Energy Park
PRO-006647, BROCKWELL STORAGE & SOLAR LIMITED
Devonside 132/33kV
Energy Storage System
Not in the file dated 21 Mar 2025 or any earlier file N84 holds; printed with 60 MW in the file dated 22 Jul 2025
Back on the register 9
Windy Standard II (Brockloch Rig) Wind Farm
PRO-000233, BROCKLOCH RIG WINDFARM LIMITED
Dun Hill 132/33kV
Wind Onshore
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 61.5 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Bolney (tertiary)
PRO-000380, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 57 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Lovedean (Tertiary)
PRO-000484, LOVEDEAN GREEN LIMITED
Lovedean 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 57 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Berkswell (Tertiary)
PRO-000516, ENSO Green Holdings P Limited
Berkswell 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 57 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Willington East 2 (Tertiary)
PRO-000548, ENSO Green Holdings SS Limited
Willington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 47.5 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Willington East 1 (Tertiary)
PRO-000551, ENSO GREEN HOLDINGS U LIMITED
Willington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 47.5 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Canterbury Tertiary
PRO-001029, ENSO GREEN HOLDINGS L LIMITED
Canterbury 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 57 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Strath Tirry
PRO-001363, Strath Tirry Wind Energy 2021 Ltd
Lairg GSP
Wind Onshore
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 34.8 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Wymondley
PRO-002187, ENSO GREEN HOLDINGS LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 21 Mar 2025 (archived copy); printed again with 400 MW in the file dated 22 Jul 2025. Last printed before that in the file dated 31 May 2024
Removed from the register 99
Glenchamber Wind Farm
PRO-000043, GLENCHAMBER WIND ENERGY LIMITED
Glenluce 132/33kV
Wind Onshore
Printed with 27.5 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Costa Head Wind Farm
PRO-000104, COSTA HEAD WIND FARM LIMITED
Costa Head 132/33kV Substation
Wind Onshore
Printed with 20.4 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
Printed with 45 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Shoreham
PRO-000192-1, VPI POWER LIMITED
Bolney 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Printed with 460 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Shoreham
PRO-000192-2, VPI POWER LIMITED
Bolney 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Printed with 420 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Shoreham
PRO-000192-3, VPI POWER LIMITED
Bolney 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Printed with 460 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Windy Standard II (Brockloch Rig) Wind Farm
PRO-000233-1, BROCKLOCH RIG WINDFARM LIMITED
Dun Hill 132/33kV
Wind Onshore
Printed with 61.5 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Windy Standard II (Brockloch Rig) Wind Farm
PRO-000233-2, BROCKLOCH RIG WINDFARM LIMITED
Dun Hill 132/33kV
Wind Onshore
Printed with 75 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
East Anglia One North
PRO-000269, EAST ANGLIA ONE LIMITED
EA1N 275/66kV Offshore Platform
Wind Offshore
Printed with 860 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Hesta Head Wind Farm
PRO-000308, HESTA HEAD WIND FARM LIMITED
Hesta Head 132/33kV Substation
Wind Onshore
Printed with 20.4 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Sanquhar II Wind Farm
PRO-000352, SANQUHAR II COMMUNITY WIND CO LTD
Sanquhar 132/33kV
Wind Onshore
Printed with 250 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Bolney (tertiary)
PRO-000380-1, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Bolney (tertiary)
PRO-000380-2, BOLNEY GREEN LIMITED
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Bramford Tertiary
PRO-000397, BRAMFORD GREEN LIMITED
Bramford 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Elstree (tertiary)
PRO-000400, ELSTREE GREEN LIMITED
Elstree 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Sofia Offshore Wind Farm
PRO-000404-2, SOFIA OFFSHORE WIND FARM LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
Printed with 1,320 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Grain South Power Station
PRO-000449, Grain South Power Limited
Grain South 132kV Substation
Gas Reciprocating
Printed with 49.99 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Lovedean (Tertiary)
PRO-000484-1, LOVEDEAN GREEN LIMITED
Lovedean 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Lovedean (Tertiary)
PRO-000484-2, LOVEDEAN GREEN LIMITED
Lovedean 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Iron Acton
PRO-000491-3, IRON ACTON GREEN LIMITED
Iron Acton 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 120 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Berkswell (Tertiary)
PRO-000516-1, ENSO GREEN HOLDINGS LIMITED
Berkswell 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Berkswell (Tertiary)
PRO-000516-2, ENSO GREEN HOLDINGS LIMITED
Berkswell 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Willington East 2 (Tertiary)
PRO-000548-1, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Willington East 2 (Tertiary)
PRO-000548-2, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Cryogenic Battery System (Synchronous)
PRO-000549, CRYOBATTERY ONE LIMITED
Carrington 400KV Substation
Energy Storage System;Reactive Compensation
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Willington East 1 (Tertiary)
PRO-000551-1, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Willington East 1 (Tertiary)
PRO-000551-2, ENSO GREEN HOLDINGS LIMITED
Willington East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Rye House (Tertiary)
PRO-000564, ENSO GREEN HOLDINGS N LIMITED
Rye House 400kV Substation
Energy Storage System
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Braelangwell Wind Farm
PRO-000916, WIND DEVELOPMENT HOLDINGS LIMITED
Shin GSP
Wind Onshore
Printed with 68 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Ferrybridge D
PRO-001020-3, KEADBY GENERATION LIMITED
Ferrybridge C 275kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)
Printed with 1,820 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Canterbury Tertiary
PRO-001029-1, ENSO GREEN HOLDINGS LIMITED
Canterbury 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Canterbury Tertiary
PRO-001029-2, ENSO GREEN HOLDINGS LIMITED
Canterbury 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Longfield Solar
PRO-001053, LONGFIELD SOLAR ENERGY FARM LIMITED
Bulls Lodge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 500 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Laleham
PRO-001063, Juniper Energy Limited
Laleham 275kV Substation
Energy Storage System
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Sellindge (Tertiary)
PRO-001067, PIVOTED POWER LLP
Sellindge 400kV Substation
Energy Storage System
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Old Forest of Ae
PRO-001075, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Old Forest of Ae 33kV Substation
Wind Onshore
Printed with 56 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Walpole
PRO-001114, PIVOTED POWER LLP
Walpole 400kV Substation
Energy Storage System
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Landulph
PRO-001131, PIVOTED POWER LLP
Landulph 400kV Substation
Energy Storage System
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Artfield Forest Windfarm
PRO-001310, ARTFIELD FOREST WIND FARM LTD
Newton Stewart GSP
Wind Onshore
Printed with 67.2 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Strath Tirry
PRO-001363-1, Strath Tirry Wind Energy 2021 Ltd
Lairg GSP
Energy Storage System;Wind Onshore
Printed with 20 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Strath Tirry
PRO-001363-2, Strath Tirry Wind Energy 2021 Ltd
Lairg GSP
Energy Storage System;Wind Onshore
Printed with 34.8 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Glendye Wind Farm
PRO-001389, GLENDYE WIND FARM LIMITED
Glendye Wind Farm Substation
Wind Onshore
Printed with 156 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Mon Solar Farm
PRO-001480, LIGHTSOURCE SPV 204 LIMITED
Wylfa South 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 240 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Lamford Hill
PRO-001481, Benbrack Wind Farm Limited
Lamford Hill 132kV/33kV Substation
Wind Onshore
Printed with 20 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Bellrock Offshore Wind Farm
PRO-001496, BLUEFLOAT ENERGY UK HOLDINGS LIMITED
Lyra 320/66kV Offshore Substation
Wind Offshore
Printed with 1,200 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Mwdwl Eithin Energy Park
PRO-001511, MOEL CHWA ENERGY PARK LIMITED
Gwyddelwern 400kV Substation
Wind Onshore
Printed with 81.2 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Salamander Offshore Wind Farm
PRO-001512, SALAMANDER WIND PROJECT COMPANY LIMITED
Peterhead GSP
Wind Offshore
Printed with 200 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Grain North Power Station
PRO-001524, GRAIN NORTH POWER LIMITED
Grain North 132kV Substation
Gas Reciprocating
Printed with 49.99 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Cygnus Offshore Windfarm
PRO-001530, Nadara Limited
Cygnus 220/66kV Offshore Substation
Wind Offshore
Printed with 1,000 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Gwynt Alwen WF
PRO-001545, WIND 2 LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System;Wind Onshore
Printed with 108 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Coylton 275kV Greener Grid Park
PRO-001551, COYLTON ENERGY LIMITED
Coylton 275/33kV Substation
Energy Storage System
Printed with 150 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Loch Kemp Pumped Storage
PRO-001559, LOCH KEMP STORAGE LIMITED
Loch Kemp 275kV substation
Pump Storage
Printed with 300 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Morgan Offshore Wind Farm
PRO-001594, Morgan Offshore Wind Limited
Penwortham 400kV Substation
Wind Offshore
Printed with 1,500 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
SSE Ferrybridge BESS
PRO-001614, SSE UTILITY SOLUTIONS LIMITED
Ferrybridge B 132kV Substation
Energy Storage System
Printed with 150 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Staythorpe (BESS and PV)
PRO-001615, SSE STAYTHORPE POWER LIMITED
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 437 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Ironbridge
PRO-001629, IGP SOLAR 16 LIMITED
Ironbridge 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Exeter Solar PV & BESS
PRO-001666, Exeter Storage Limited
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 290 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Harker Green Energy Centre
PRO-001709, INNOVA RENEWABLES LIMITED
Harker 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
SSE Fiddlers Ferry Battery Energy Storage
PRO-001762, SSE UTILITY SOLUTIONS LIMITED
Fiddlers Ferry 275kV Substation
Energy Storage System
Printed with 150 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Amersham
PRO-001770, ENSO GREEN HOLDINGS Z LIMITED
Amersham Main 132kV Substation
Energy Storage System
Printed with 120 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Kearsley North Green Energy Centre
PRO-001793, INNOVA RENEWABLES LIMITED
Kearsley GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Penwortham BESS
PRO-001804, Penwortham (BES) Ltd
Penwortham 400kV Substation
Energy Storage System
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Warley 2
PRO-001848-1, CSE26 LIMITED
Warley 275kV Substation
Energy Storage System
Printed with 150 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Warley 2
PRO-001848-2, CSE26 LIMITED
Warley 275kV Substation
Energy Storage System
Printed with 200 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Kirkby Green Energy Centre
PRO-001869, INNOVA RENEWABLES LIMITED
Kirkby 275kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Hirfynydd and Mynydd Drumaur
PRO-001899, EDF ENERGY RENEWABLES LIMITED
Swansea North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Printed with 180 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Daines Green Energy Centre
PRO-001902, INNOVA RENEWABLES LIMITED
Daines 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 480 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Cloud Hill Windfarm
PRO-001938, Cloud Hill Windfarm Limited
Cloud Hill Wind Farm 132kV Substation
Wind Onshore
Printed with 50 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Frodsham Solar Park
PRO-001952, Frodsham Solar Limited
Frodsham 132kV
PV Array (Photo Voltaic/solar)
Printed with 100 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Bicker Fenn Energy Park
PRO-001984, BEACON FEN ENERGY PARK LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Stalybridge BESS
PRO-002036, CSE32 LIMITED
Stalybridge 275kV Substation
Energy Storage System
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Sundon BESS
PRO-002039, CSE30 LIMITED
Sundon 400kV Substation
Energy Storage System
Printed with 300 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Daines BESS
PRO-002050, SSE DAINES BESS LIMITED
Daines 400kV Substation
Energy Storage System
Printed with 600 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Cowley Energy Storage
PRO-002066, BW ESS DEVELOPMENT UK LIMITED
Cowley 400kV Substation
Energy Storage System
Printed with 200 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Waltham Cross BESS
PRO-002070, ENSO GREEN HOLDINGS LIMITED
Waltham Cross 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Capenhurst Tertiary
PRO-002162-1, ENSO GREEN HOLDINGS Q LIMITED
Capenhurst 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Capenhurst Tertiary
PRO-002162-2, ENSO GREEN HOLDINGS Q LIMITED
Capenhurst 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Wymondley
PRO-002187-1, ENSO GREEN HOLDINGS LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 200 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Wymondley
PRO-002187-2, ENSO GREEN HOLDINGS LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 300 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Wymondley
PRO-002187-3, ENSO GREEN HOLDINGS LIMITED
Wymondley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
High Marnham 400
PRO-002194, ENSO GREEN HOLDINGS LIMITED
High Marnham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Ocker Hill - Gresham House
PRO-002213, Gresham House Devco Pipeline Limited
Ocker Hill 275kV Substation
Energy Storage System
Printed with 240 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Mablethorpe Green Energy Centre
PRO-002255, MABLETHORPE GREEN ENERGY CENTRE LIMITED
Mablethorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Hawthorn Pit Green Energy Centre
PRO-002282, INNOVA RENEWABLES LIMITED
Hawthorn Pit 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Pentir Green Energy Centre
PRO-002345, INNOVA RENEWABLES LIMITED
Pentir 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
East Claydon Green Energy Centre
PRO-002383, INNOVA RENEWABLES LIMITED
East Claydon 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 1,025 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Berwick Bank Offshore Wind Farm A
PRO-002627, BERWICK BANK A LIMITED
Berwick Bank A 275/66kV Offshore Substation
Wind Offshore
Printed with 1,150 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Oakview Farm BESS
PRO-002702, P3P PARTNERS LLP
Hams Hall 400kV Substation
Energy Storage System
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Waltham Cross Farm 2
PRO-002748, Waltham Cross 7 Renewables Limited
Waltham Cross B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 700 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Gallatown Battery Energy Storage Facility
PRO-002755, CESA (KIRKCALDY) LIMITED
Redhouse 132/33kV
Energy Storage System
Printed with 80 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Norton GSP
PRO-002964, NORTHERN POWERGRID (NORTHEAST) PLC
Norton GSP
Energy Storage System;PV Array (Photo Voltaic/solar);Waste
Printed with 312.3 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Keadby GSP
PRO-002975, NORTHERN POWERGRID (YORKSHIRE) PLC
Keadby GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 20 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Skelton Grange GSP
PRO-002980, NORTHERN POWERGRID (YORKSHIRE) PLC
Skelton Grange GSP
Energy Storage System
Printed with 381.7 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Conexus North BESS Facility
PRO-003460, Pulse Clean Energy Limited
Coalburn 400kV Substation
Energy Storage System
Printed with 200 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Acha Energy Storage
PRO-003669, Renewable Energy Systems Limited
Spittal 400kV
Energy Storage System
Printed with 600 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Hazells Farm
PRO-003834, Northfleet Devco Limited
Northfleet East 400kV Substation
Energy Storage System
Printed with 400 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Norwich Main BESS
PRO-003894, LONG STRATTON ENERGY PARK LIMITED
Norwich Main 400kV Substation
Energy Storage System
Printed with 249.9 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Fiddlers Ferry BESS
PRO-003897, FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
Energy Storage System
Printed with 900 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Daviot Windfarm
PRO-004069, CUBICO UK DEVELOPMENT LIMITED
Daviot 132/33kV Substation
Energy Storage System;Wind Onshore
Printed with 45 MW in the file dated 21 Mar 2025; not in the file dated 22 Jul 2025
Capacity up 26
Berwick Bank Offshore Wind Farm B
PRO-002628-1, Berwick Bank B Limited
Branxton 400/132KV Substation
Wind Offshore
Cumulative Total Capacity changed from 250 MW to 1,150 MW (+900 MW)
Loch Kemp PSH
PRO-002285, LOCH KEMP STORAGE LIMITED
Loch Kemp 275kV Switching Station
Pump Storage
Cumulative Total Capacity changed from 300 MW to 660 MW (+360 MW)
Earba PSH
PRO-004030-2, EARBA LIMITED
Earba PSH Powerhouse Substation
Pump Storage
Cumulative Total Capacity changed from 1,500 MW to 1,800 MW (+300 MW)
Berwick Bank Offshore Wind Farm B
PRO-002628-2, Berwick Bank B Limited
Branxton 400/132KV Substation
Wind Offshore
Cumulative Total Capacity changed from 1,150 MW to 1,380 MW (+230 MW)
Zenobe Blackhillock 300 MW
PRO-001624-2, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 300 MW to 510 MW (+210 MW)
Cleve Hill Solar Park
PRO-001097, CLEVE HILL SOLAR PARK LIMITED
Cleve Hill 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 350 MW to 550 MW (+200 MW)
Legacy Green Energy Centre
PRO-001662-3, LEGACY GREEN ENERGY LIMITED
Legacy 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 1,025 MW to 1,200 MW (+175 MW)
Spiorad Na Mara Offshore Wind Farm
PRO-001642, SPIORAD NA MARA LIMITED
NPI C 220/66KV OFFSHORE SUBSTATION
Wind Offshore
Cumulative Total Capacity changed from 740 MW to 900 MW (+160 MW)
Ryhall PV & BESS
PRO-004379, GREAT CASTERTON ENERGY PARK LIMITED
Ryhall 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 249.9 MW to 400 MW (+150.1 MW)
Dogger Bank D Offshore Wind Farm
PRO-001675, Doggerbank Offshore Wind Farm Project 4 Projco Limited
Gatroben Offshore Substation
Wind Offshore
Cumulative Total Capacity changed from 1,320 MW to 1,450 MW (+130 MW)
Garn Fach Wind Farm
PRO-001157, EDF ENERGY RENEWABLES LIMITED
Garn Fach 132kV Substation
Energy Storage System;Wind Onshore
Cumulative Total Capacity changed from 110 MW to 162 MW (+52 MW)
Coryton
PRO-000103, CORYTON ENERGY COMPANY LTD.
Coryton South 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Cumulative Total Capacity changed from 800 MW to 850 MW (+50 MW)
Iron Acton
PRO-000491-1, IRON ACTON GREEN LIMITED
Iron Acton - (South West) GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 49.9 MW to 99.4 MW (+49.5 MW)
Tollgate 49.5MW BESS
PRO-002372, Tollgate Energy Storage Limited
Hatfield 33kV Substation
Energy Storage System
Cumulative Total Capacity changed from 49.5 MW to 99 MW (+49.5 MW)
Shoreham
PRO-000192, VPI Power Limited
Bolney 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Cumulative Total Capacity changed from 420 MW to 460 MW (+40 MW)
Clune Wind Farm
PRO-004620, Renewable Energy Systems Limited
Clune 132/33 kV Substation
Energy Storage System;Wind Onshore
Cumulative Total Capacity changed from 150 MW to 187.2 MW (+37.2 MW)
South Humber Bank
PRO-000366, EP SHB LIMITED
South Humber Bank 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Cumulative Total Capacity changed from 1,365 MW to 1,400 MW (+35 MW)
Buchan 01 Offshore Wind Farm
PRO-001528, BUCHAN OFFSHORE WIND LIMITED
Buchan 01 275/66kV Substation
Wind Offshore
Cumulative Total Capacity changed from 932 MW to 960 MW (+28 MW)
Iron Acton
PRO-000491-2, IRON ACTON GREEN LIMITED
Iron Acton - (South West) GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 99.4 MW to 120 MW (+20.6 MW)
Fasque Windfarm
PRO-001009, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Fetteresso 132kV substation
PV Array (Photo Voltaic/solar);Wind Onshore
Cumulative Total Capacity changed from 90 MW to 105 MW (+15 MW)
Chirmorie Wind Farm
PRO-000094, CHIRMORIE WIND FARM LIMITED
Chirmorie 132/33kV Substation
Wind Onshore
Cumulative Total Capacity changed from 80 MW to 91 MW (+11 MW)
Project Invicta
PRO-004133, The Farm Energy Company Limited
East Kent Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Cumulative Total Capacity changed from 340 MW to 350 MW (+10 MW)
Zenobe Blackhillock 300 MW
PRO-001624-1, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 200 MW to 210 MW (+10 MW)
Rayleigh 1 Tertiary
PRO-000460, RAYLEIGH GREEN LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 47.5 MW to 57 MW (+9.5 MW)
Rayleigh 2 Tertiary
PRO-000466, ENSO GREEN HOLDINGS J LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 47.5 MW to 57 MW (+9.5 MW)
Lakeside Energy Drax
PRO-001522, LAKESIDE ENERGY STORAGE LIMITED
Drax 132kV Substation
Energy Storage System
Cumulative Total Capacity changed from 99 MW to 99.9 MW (+0.9 MW)
Capacity down 25
Ratcliffe on Soar
PRO-000050, Uniper UK Limited
Ratcliffe-On-Soar 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 2,021 MW to 225 MW (−1,796 MW)
Llŷr Floating Wind
PRO-001981, Llŷr Floating Wind Limited
Pembroke 400kV Substation
Wind Offshore
Cumulative Total Capacity changed from 1,800 MW to 200 MW (−1,600 MW)
OWPL Windfarm
PRO-000568-2, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
Cumulative Total Capacity changed from 2,250 MW to 750 MW (−1,500 MW)
OWPL Windfarm
PRO-000568-1, OFFSHORE WIND POWER LIMITED
OWPL Windfarm Platform 220/66kV Offshore Substation
Wind Offshore
Cumulative Total Capacity changed from 750 MW to 0 MW (−750 MW)
Legacy Green Energy Centre
PRO-001662-2, LEGACY GREEN ENERGY LIMITED
Legacy 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 800 MW to 400 MW (−400 MW)
Whitelee
PRO-000067-2, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Whitelee 275/33kV
Wind Onshore
Cumulative Total Capacity changed from 660 MW to 355 MW (−305 MW)
Green Volt Offshore Windfarm
PRO-001469-1, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Cumulative Total Capacity changed from 300 MW to 0 MW (−300 MW)
Green Volt Offshore Windfarm
PRO-001469-2, FLOTATION ENERGY LIMITED
New Deer 400kV Substation
Demand;Wind Offshore
Cumulative Total Capacity changed from 560 MW to 300 MW (−260 MW)
Port of Mostyn
PRO-000421-3, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
Cumulative Total Capacity changed from 420 MW to 210 MW (−210 MW)
Penwortham Green Energy Centre
PRO-001694-2, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 600 MW to 400 MW (−200 MW)
CENOS
PRO-001847, FLOTATION ENERGY LIMITED
Peterhead 400kV Substation
Demand;Wind Offshore
Cumulative Total Capacity changed from 1,500 MW to 1,350 MW (−150 MW)
Sofia Offshore Wind Farm
PRO-000404-1, SOFIA OFFSHORE WIND FARM LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
Cumulative Total Capacity changed from 132 MW to 0 MW (−132 MW)
Bramford BESS
PRO-002071, CSE33 LIMITED
Bramford 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 400 MW to 300 MW (−100 MW)
Gresham House Connagill BESS
PRO-003434, Gresham House Devco Pipeline Limited
Connagill 132kV Substation
Energy Storage System
Cumulative Total Capacity changed from 240 MW to 170 MW (−70 MW)
Port of Mostyn
PRO-000421-2, MOSTYN SEAPOWER LIMITED
Connah's Quay 400kV Substation
Tidal
Cumulative Total Capacity changed from 210 MW to 140 MW (−70 MW)
M74 West Wind Farm
PRO-002398, RENEWCO POWER LIMITED
M74 West Wind Farm 132kV
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Cumulative Total Capacity changed from 249.9 MW to 180 MW (−69.9 MW)
Twyn Hywel Cillfynydd
PRO-001497, Twyn Hywel Energy Park Ltd
Cilfynydd 400kV Substation
Wind Onshore
Cumulative Total Capacity changed from 160 MW to 107.8 MW (−52.2 MW)
Richborough 1
PRO-001165, RICHBOROUGH ENERGY PARK LIMITED
Richborough 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 100 MW to 50 MW (−50 MW)
Richborough 2
PRO-001164, RICHBOROUGH ENERGY PARK LIMITED
Richborough 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 100 MW to 50 MW (−50 MW)
West Burton B
PRO-000369-2, WEST BURTON B LIMITED
West Burton 400kV Substation
CCGT (Combined Cycle Gas Turbine);Energy Storage System
Cumulative Total Capacity changed from 1,881 MW to 1,833 MW (−48 MW)
Barge Way 120MW BESS
PRO-002144, FPC ELECTRIC LAND LIMITED
Kemsley GSP
Energy Storage System
Cumulative Total Capacity changed from 120 MW to 99.9 MW (−20.1 MW)
Hartlepool
PRO-000139, EDF ENERGY NUCLEAR GENERATION LIMITED
Hartlepool 275kV Substation
Nuclear
Cumulative Total Capacity changed from 1,207 MW to 1,197 MW (−10 MW)
Mannington
PRO-001092, BAYWA R.E. UK LIMITED
Mannington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 57 MW to 47.5 MW (−9.5 MW)
Blarghour Wind
PRO-000398, BLARGHOUR WIND FARM LIMITED
Blarghour Substation
Wind Onshore
Cumulative Total Capacity changed from 73.1 MW to 67.2 MW (−5.9 MW)
Bolney
PRO-001031, PIVOTED POWER LLP
Bolney 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 49.9 MW to 47.5 MW (−2.4 MW)
Project status changed 65
Sizewell C
PRO-000145-1, Sizewell C Limited
Sizewell 400kV Substation
Nuclear
Project Status changed from Awaiting Consents to Consents Approved
Sizewell C
PRO-000145-2, Sizewell C Limited
Sizewell 400kV Substation
Nuclear
Project Status changed from Awaiting Consents to Consents Approved
Viking Wind Farm
PRO-000338, VIKING ENERGY WIND FARM LLP
Kergord GSP
Wind Onshore
Project Status changed from Consents Approved to Built
Dogger Bank Project 4 (Dogger Bank B)
PRO-000410, DOGGERBANK OFFSHORE WIND FARM PROJECT 2 PROJCO LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
Project Status changed from Under Construction/Commissioning to Built
Enderby (Akira)
PRO-000426, ENDERBY BATTERY STORAGE LIMITED
Enderby 400kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Energy Isles
PRO-000447, ENERGY ISLES SHETLAND LIMITED
Energy Isles 132kV Substation
Wind Onshore
Project Status changed from Awaiting Consents to Consents Approved
Rayleigh 1 Tertiary
PRO-000460, RAYLEIGH GREEN LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Ocker Hill Tertiary Connection
PRO-000462, HD143OCK LTD
Ocker Hill 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Mannington Tertiary
PRO-000464, MANNINGTON ENERGY CENTRE LIMITED
Mannington 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
North Kyle New Cumnock
PRO-000474-1, NORTH KYLE WIND FARM LIMITED
New Cumnock 275/132kV Substation
Energy Storage System;Wind Onshore
Project Status changed from Awaiting Consents to Built
Monk Fryston Tertiary Connection
PRO-000479, HD777FRY LTD
Monk Fryston 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Pembroke (spare bay)
PRO-000538, Pembroke Green Limited
Pembroke 132kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Greengairs East Wind Farm
PRO-000880, GREENGAIRS EAST WIND FARM LIMITED
Cumbernauld 132/33kV
Wind Onshore
Project Status changed from Awaiting Consents to Built
Bredbury
PRO-001041, PIVOTED POWER LLP
Bredbury 275kV Substation
Energy Storage System
Project Status changed from Scoping to Under Construction/Commissioning
Braintree (Tertiary)
PRO-001043, CSE22 LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Deeside Power Station
PRO-001062, DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
Energy Storage System;Gas Reciprocating
Project Status changed from Scoping to Consents Approved
Mannington
PRO-001091, PIVOTED POWER LLP
Mannington 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Cleve Hill Solar Park
PRO-001097, CLEVE HILL SOLAR PARK LIMITED
Cleve Hill 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Under Construction/Commissioning to Built
Swansea North
PRO-001119, EDF ENERGY RENEWABLES LIMITED
Swansea North 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Scoping
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-1, Menter Môn Morlais Limited
Penrhos GSP
Tidal
Project Status changed from Scoping to Under Construction/Commissioning
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-2, Menter Môn Morlais Limited
Penrhos GSP
Tidal
Project Status changed from Scoping to Under Construction/Commissioning
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-3, Menter Môn Morlais Limited
Penrhos GSP
Tidal
Project Status changed from Scoping to Under Construction/Commissioning
Menter Mon Morlais Anglesey Marine Energy
PRO-001134-4, Menter Môn Morlais Limited
Penrhos GSP
Tidal
Project Status changed from Scoping to Under Construction/Commissioning
Neilston 132kV Greener Grid Park
PRO-001343-1, NEILSTON ENERGY LIMITED
Neilston 400/275/132kV
Energy Storage System
Project Status changed from Scoping to Consents Approved
Neilston 132kV Greener Grid Park
PRO-001343-2, NEILSTON ENERGY LIMITED
Neilston 400/275/132kV
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Thurso South Synchronous Compensation
PRO-001415, THURSO GRID SERVICES LIMITED
Thurso GSP
Reactive Compensation
Project Status changed from Consents Approved to Built
Neilston 400kV Greener Grid Park
PRO-001419, STATKRAFT UK LTD
Neilston 400kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
EMERGE Centre
PRO-001462, Uniper UK Limited
Ratcliffe-On-Soar 132kV Substation
Waste
Project Status changed from Awaiting Consents to Consents Approved
Slickly Wind Farm
PRO-001517, Slickly Wind Farm Limited
Slickly Wind Farm 132kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Native River (Capenhurst)
PRO-001557, NATIVE RIVER LTD
Capenhurst 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Berryburn Extension Wind Farm
PRO-001558, BB2 WIND FARM LIMITED
Berry Burn GSP
Wind Onshore
Project Status changed from Scoping to Consents Approved
Sizing John (Rainhill)
PRO-001581-1, SIZING JOHN LIMITED
Rainhill GSP
Energy Storage System
Project Status changed from Consents Approved to Built
Chickerell Solar PV & BESS
PRO-001598, CHICKERELL SOLAR LIMITED
Chickerell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Zenobe Blackhillock 300 MW
PRO-001624-1, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Zenobe Blackhillock 300 MW
PRO-001624-2, ZENOBE BLACKHILLOCK LIMITED
Blackhillock 275kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Flash Solar Farm
PRO-001634-2, ELEMENTS GREEN TRENT LTD
Staythorpe 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Loch Liath Wind Farm
PRO-001671, LOCH LIATH WIND FARM LIMITED
Loch Liath 132/33kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Ninfield Greener Grid Park
PRO-001756-3, STATKRAFT UK LTD
Ninfield 400kV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Awaiting Consents to Scoping
Beatrice Sync Comp
PRO-001757, TINZ PROGRAMME 1 PROJECTCO 3 LIMITED
Beatrice 400kV Substation
Reactive Compensation
Project Status changed from Scoping to Built
Berkswell Energy Storage
PRO-001788, BW ESS Development UK Limited
Berkswell 275kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Knockcronal Wind Farm
PRO-001801, Knockcronal Wind Farm Limited
Knockcronal Wind Farm 33kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Southfields Farm
PRO-001852, PD688IRO LTD
Minety 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Clay Tye Farm Phase 2
PRO-001854, Harmony CTF 2 Limited
Warley 132kV Substation
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Clay Tye Farm Phase 1
PRO-001857, HARMONY CTF LIMITED
Warley 132kV Substation
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Craig Watch Wind Farm
PRO-001877, Craig Watch Wind Farm Limited
Craig Watch Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Farnham BESS
PRO-001939, Harmony FM Limited
Wrecclesham 33kV
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Keadby South Power Station
PRO-001962, KEADBY GENERATION LIMITED
Keadby 400kV Substation
CCGT (Combined Cycle Gas Turbine)
Project Status changed from Scoping to Built
Broadditch BESS
PRO-002000, Harmony BD Ltd
Northfleet East 132kV
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Drakelow BESS
PRO-002033, HARMONY DL LTD
Drakelow 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Spennymoor Greener Grid Park
PRO-002041-1, STATKRAFT UK LTD
Spennymoor 400kV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Scoping to Awaiting Consents
Swansea Greener Grid Park - Connection 2
PRO-002044, Swansea Grid Solutions Limited
Swansea North 400kV Substation
Reactive Compensation
Project Status changed from Scoping to Consents Approved
Bramford BESS
PRO-002071, CSE33 LIMITED
Bramford 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Bumpers Farm BESS phase 1
PRO-002103, Harmony BF Ltd
Amersham Main 132kV Substation
Energy Storage System
Project Status changed from Scoping to Built
Bumpers Farm BESS phase 2
PRO-002104, Harmony BF Ltd
Amersham Main 132kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Brook Farm BESS
PRO-002201, CARE POWER (BROOK FARM) LIMITED
Bramford 132kV
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Jersey Farm BESS
PRO-002264, CSE39 LIMITED
Jersey Farm 400kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved
Car Duibh Wind Farm
PRO-002342, CAR DUIBH WIND FARM LIMITED
Car Duibh 275kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Tollgate 49.5MW BESS
PRO-002372, Tollgate Energy Storage Limited
Hatfield 33kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Newarthill Energy Park
PRO-002532, Geocore (Newarthill) Ltd
Newarthill Energy Park 275kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
Shipley Road BESS
PRO-002553, CSE43 LIMITED
DRAGON GREEN 400kV SUBSTATION
Energy Storage System
Project Status changed from Scoping to Consents Approved
Necton Greener Grid Park
PRO-002562-1, Necton Grid Solutions Limited
Necton 400kV Substation
Energy Storage System;Reactive Compensation
Project Status changed from Awaiting Consents to Consents Approved
Olivers Forest Wind Farm
PRO-002648, Oliver Forest Wind Farm Limited
Olivers Forest Wind Farm 132kV Substation
Wind Onshore
Project Status changed from Scoping to Awaiting Consents
Artfield Forest Wind Farm
PRO-003578, ARTFIELD FOREST WIND FARM LTD
Artfield Forest Wind Farm 132kV Substation
Wind Onshore
Project Status changed from Scoping to Consents Approved
Earba PSH
PRO-004030-1, EARBA LIMITED
Earba PSH Powerhouse Substation
Pump Storage
Project Status changed from Scoping to Consents Approved
Earba PSH
PRO-004030-2, EARBA LIMITED
Earba PSH Powerhouse Substation
Pump Storage
Project Status changed from Scoping to Consents Approved

By plant type

Plant typeProjects with a changeNewBack on the registerRemovedNet capacity change
Energy Storage System165103025+19,048 MW
Energy Storage System;PV Array (Photo Voltaic/solar)12570737+17,960.9 MW
Wind Onshore6737213+3,038.7 MW
Energy Storage System;Wind Onshore393204+3,022 MW
Wind Offshore311407+9,656 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)252201+17,615 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore191601+2,128.7 MW
CCGT (Combined Cycle Gas Turbine)8103+285 MW
Demand;Energy Storage System8800+2,650 MW
PV Array (Photo Voltaic/solar)8701+470.4 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore6600+6,000 MW
Energy Storage System;Reactive Compensation62010 MW
Tidal6000−280 MW
Demand;Wind Offshore5200+150 MW
Pump Storage4001+360 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation;Wind Onshore3300+716 MW
Hydro3201+51.2 MW
Nuclear3000−10 MW
Reactive Compensation30000 MW
CCGT (Combined Cycle Gas Turbine);Energy Storage System2100+1,833 MW
Energy Storage System;Pump Storage;Thermal2200+1,000 MW
Energy Storage System;Wind Offshore2200+400 MW
Gas Reciprocating2002−100 MW
PV Array (Photo Voltaic/solar);Wind Onshore2100+100 MW
Biomass;Demand1100+3,906 MW
CCGT (Combined Cycle Gas Turbine);Demand;Energy Storage System;OCGT (Open Cycle Gas Turbine);Hydrogen1100+1,420 MW
CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)1001−1,820 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation1100+520 MW
Demand;Energy Storage System;Reactive Compensation1100+400 MW
Demand;Energy Storage System;Wind Onshore1100+600 MW
Energy Storage System;Gas Reciprocating10000 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Waste1001−312.3 MW
Waste10000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.

By connection site

Connection siteProjects with a changeNewBack on the registerRemovedNet capacity change
Penwortham 400kV Substation10702+4,057 MW
Bolney 400kV Substation8015−1,409.3 MW
Daines 400kV Substation7502+1,560 MW
Fiddlers Ferry 275kV Substation7502+1,050 MW
Harker 400kV Substation6501+3,417 MW
Bicker Fen 400kV Substation5401+1,600 MW
High Marnham 400kV Substation5401+2,110 MW
Staythorpe 400kV Substation5301+1,600 MW
Swansea North 400kV Substation5201+298.9 MW
Berkswell 275kV Substation4012−106.9 MW
Bramford 400kV Substation4201−50.1 MW
Branxton 400/132KV Substation4200+3,660 MW
Bulls Lodge 400kV Substation4301+1,000 MW
Carrington 400KV Substation4301+1,400 MW
Coylton 275/33kV Substation4301+500 MW
Dun Hill 132/33kV4112−114.6 MW
Ferrybridge B 132kV Substation4301+300 MW
Glenluce 132/33kV4301+85.3 MW
Gwyddelwern 400kV Substation4301+166.2 MW
Kirkby 275kV Substation4301+800 MW
Lairg GSP4112−4.9 MW
New Deer 400kV Substation4200+300 MW
Ocker Hill 275kV Substation4201+240 MW
OWPL Windfarm Platform 220/66kV Offshore Substation4200+1,500 MW
Penrhos GSP40000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 336.

Earlier comparisons

Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.