Astwood Solar Farm GEC

Developer as published, connection site, reference: ASTWOOD GREEN ENERGY LTD. West Anglia Connection Node G 400kV Substation (NGET). PRO-004799.

Sign in to watch this project
Capacity520 MWHybrid, Gate 1
Connection date31 Oct 2037Status as printed: Scoping
First date seen 31 Oct 2034, difference +1096 dayscalculated by N84
MW ahead in N84's order at this site1,400 MWcalculated by N84

Connection date, edition by edition

20342035203620372038File dated 2026-09-11: connection date 2034-10-31Oct 2034File dated 2026-10-20: connection date 2037-10-31Oct 203711 Sep202620 Oct2026
20342035203620372038File dated 2026-09-11: connection date 2034-10-31Oct 2034File dated 2026-10-20: connection date 2037-10-31Oct 203711 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. MW Effective From printed as 31 Oct 2037 (previous file: 31 Oct 2034), 1,096 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +1096 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 90Receipt: NESO TEC Register, file dated 11 Sep 2026, row 90