AGS Coatbridge

Developer as published, connection site, reference: Advance Grid Solutions Limited. Coatbridge GSP (SPT). PRO-004544.

Sign in to watch this project
Capacity60 MWBattery storage, Gate 1
Connection date30 Apr 2033Status as printed: Scoping
MW ahead in N84's order at this site59.9 MWcalculated by N84

Connection date, edition by edition

20332034File dated 2025-07-22: connection date 2033-04-30Apr 2033File dated 2026-10-20: connection date 2033-04-3022 Jul202520 Oct2026
20332034File dated 2025-07-22: connection date 2033-04-30Apr 2033File dated 2026-10-20: connection date 2033-04-3022 Jul202520 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 22 Jul 2025 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 28Receipt: NESO TEC Register, file dated 11 Sep 2026, row 28

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.