N84 Grid

Norwich Main BESS

Developer as published, connection site, reference: LONG STRATTON ENERGY PARK LIMITED. North Anglia Connection Node A 400kV (NGET). PRO-003894.

Sign in to watch this project
Capacity949.9 MWHybrid, Gate 1
Connection date31 Oct 2034Status as printed: Scoping
First date seen 31 Oct 2032, difference +730 dayscalculated by N84
MW ahead in N84's order at this site400 MWcalculated by N84

Connection date, edition by edition

20342035File dated 2024-05-31: connection date 2034-10-31Oct 2034File dated 2025-03-21: connection date 2034-10-3131 May202421 Mar2025
20342035File dated 2024-05-31: connection date 2034-10-31Oct 2034File dated 2025-03-21: connection date 2034-10-3131 May202421 Mar2025

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 21 Mar 2025. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.