Berwick Bank Offshore Wind Farm A

Developer as published, connection site, reference: BERWICK BANK A LIMITED. Branxton 400kV Substation (SPT). PRO-002627.

Sign in to watch this project
Capacity1,380 MWOffshore wind
Connection date31 Oct 2029Status as printed: Scoping
First date seen 27 Nov 2027, difference +704 dayscalculated by N84
MW ahead in N84's order at this site1,000 MWcalculated by N84

Connection date, edition by edition

20292030File dated 2024-05-31: connection date 2029-10-31Oct 2029File dated 2025-03-21: connection date 2029-10-3131 May202421 Mar2025
20292030File dated 2024-05-31: connection date 2029-10-31Oct 2029File dated 2025-03-21: connection date 2029-10-3131 May202421 Mar2025

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 21 Mar 2025. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.