Lyndhurst Camperdown BESS

Developer as published, connection site, reference: Geocore Ltd. Charleston GSP (SHET). PRO-002658.

Sign in to watch this project
Capacity49.5 MWBattery storage, Gate 1
Connection date31 Oct 2031Status as printed: Scoping
MW ahead in N84's order at this site134.9 MWcalculated by N84

Connection date, edition by edition

20312032File dated 2025-07-22: connection date 2031-10-31Oct 2031File dated 2026-10-20: connection date 2031-10-3122 Jul202520 Oct2026
20312032File dated 2025-07-22: connection date 2031-10-31Oct 2031File dated 2026-10-20: connection date 2031-10-3122 Jul202520 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 22 Jul 2025 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 1351Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1331
  2. 20 Oct 2026. Export capacity printed as 49.5 MW (previous file: 49.9 MW), −0.4 MW. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was imported49.9 → 49.5Receipt: NESO TEC Register, file dated 20 Oct 2026, row 1351Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1331

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.