Queue movers: the TEC Register, edition by edition

What changed between consecutive editions of NESO's Transmission Entry Capacity (TEC) Register, as printed. Supported by National Energy SO Open Data.

File dated 27 Sep 2024compared withFile dated 20 Dec 2024How the files are matchedThe file dated 27 Sep 2024 is an archived copy (Internet Archive), not a file N84 collected from NESO.

N84 holds no copy between 27 Sep 2024 and 20 Dec 2024; each change below happened at some point in that time, not necessarily this week. Wide comparisons

Changes between the two files

321 changesacross 308 projects. Net change +22.22 GW (new, left the register and capacity changes), plus 1.89 GW back on the register after being absent from the archived copy dated 27 Sep 2024 (Internet Archive).
Rows matched on Project Number. "Back on the register": absent from the previous file N84 holds, printed again in this one. Net change calculated by N84 from Cumulative Total Capacity as printed. NESO TEC Register, files dated 27 Sep 2024 and 20 Dec 2024. Supported by National Energy SO Open Data.
Table view
Changes by type
TypeChanges
New on the register109
Connection date later97
Left the register41
Connection date earlier29
Status, stage or gate changed21
Capacity changed14
Back on the register5
Connection date added or removed5

Capacity in and out

TEC file dated 20 Dec 2024 against 27 Sep 2024 (archived copy)

New: +41.3 GW+41.3 GWNewCapacity up: +2.5 GW+2.5 GWCapacity upCapacity down: −1.4 GW−1.4 GWCapacity downRemoved: −20.2 GW−20.2 GWRemovedNet: 22.2 GW22.2 GWNet
New: +41.3 GW+41.3 GWNewCapacity up: +2.5 GW+2.5 GWCapacityupCapacity down: −1.4 GW−1.4 GWCapacitydownRemoved: −20.2 GW−20.2 GWRemovedNet: 22.2 GW22.2 GWNet

Not in the chart: 1.89 GW across 5 projects back on the register, absent from the archived copy dated 27 Sep 2024 (Internet Archive) and printed again in the file dated 20 Dec 2024. See them

NESO TEC Register, files dated 27 Sep 2024 and 20 Dec 2024. Supported by National Energy SO Open Data. Capacity is Cumulative Total Capacity as printed.
Table view
Capacity in and out
StepMW
New+41,291.1
Capacity up+2,546
Capacity down−1,435.3
Removed−20,183.7
Net22,218.1
Back on the register (not in the net)1,889.5

Biggest date moves

Bellbroughton Energy Park500 MW, energy storage system;pv array (photo voltaic/solar)
30 Oct 202730 Oct 2037
Warwickshire Connection Node A 400kV Substation+3,653 days
Dunclent Battery Storage400 MW, energy storage system
31 Oct 203030 Oct 2037
Warwickshire Connection Node A 400kV Substation+2,556 days

The days are calculated by N84 from the two printed dates. The register does not say why a date moved.

Data centres in the pipeline

30 sites

Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.

See every site

Every change, in full

Every change between the two files, grouped by type
ProjectConnection siteWhat the files print
New on the register 109
Finlarig
PRO-000079-1, SSE GENERATION LIMITED
Finlarig GSP
Hydro
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 16.5 MW in the file dated 20 Dec 2024
Finlarig
PRO-000079-2, SSE GENERATION LIMITED
Finlarig GSP
Hydro
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 35 MW in the file dated 20 Dec 2024
Red John PSH
PRO-000570-1, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 450 MW in the file dated 20 Dec 2024
Red John PSH
PRO-000570-2, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 550 MW in the file dated 20 Dec 2024
Dogger Bank South East
PRO-001375-1, RWE RENEWABLES UK LIMITED
RWE North Sea Offshore Substation
Wind Offshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Dogger Bank South East
PRO-001375-2, RWE RENEWABLES UK LIMITED
RWE North Sea Offshore Substation
Wind Offshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,450 MW in the file dated 20 Dec 2024
Dogger Bank South West
PRO-001386-1, RWE RENEWABLES UK LIMITED
Wylfa 400kV Substation
Wind Offshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Dogger Bank South West
PRO-001386-2, RWE RENEWABLES UK LIMITED
Wylfa 400kV Substation
Wind Offshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,450 MW in the file dated 20 Dec 2024
Capenhurst Tertiary
PRO-002162-1, ENSO GREEN HOLDINGS LIMITED
Capenhurst 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Dec 2024
Capenhurst Tertiary
PRO-002162-2, ENSO GREEN HOLDINGS LIMITED
Capenhurst 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 57 MW in the file dated 20 Dec 2024
Biggleswade PV
PRO-002226, CSE38 LIMITED
Biggleswade 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Dec 2024
Elmya Dunbar BESS
PRO-002290, ELMYA ENERGY UK 1 LIMITED
Hunterston 400/132kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Craigend
PRO-002567, Renewable Energy Systems Limited
Arbroath GSP
PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Dec 2024
Philiphaugh Wind Farm
PRO-002708, EDF ENERGY RENEWABLES LIMITED
Philipaugh Substation
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 175 MW in the file dated 20 Dec 2024
AGS Calderside Battery Energy Storage System
PRO-002752-1, Advance Grid Solutions Limited
Calderside 275kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024
AGS Calderside Battery Energy Storage System
PRO-002752-2, Advance Grid Solutions Limited
Calderside 275kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Nether Pitforthie BESS
PRO-003226, OPDE UK LIMITED
Fiddes GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024
AULTCRAGGIE BESS
PRO-003228, OPDE UK LIMITED
Brora GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024
Newton of Park BESS 2
PRO-003562, OPDE UK LIMITED
Nairn GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024
Crathorne Estate BESS and Solar Farm
PRO-003831, Exagen Development Limited
Lackenby 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 600 MW in the file dated 20 Dec 2024
Brechfa Dau Wind Farm
PRO-003847, WELSH GOVERNMENT
Proposed Ferryside GSP
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 110.8 MW in the file dated 20 Dec 2024
Beinn an Tuirc 1
PRO-003918, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Carradale 1 GSP
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 95.2 MW in the file dated 20 Dec 2024
KELL440MW BESS
PRO-003956, SMS ENERGY SERVICES LIMITED
Kellingley IDNO GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 440 MW in the file dated 20 Dec 2024
014 NEP Bransholme
PRO-004043, NEW ENERGY PARTNERSHIP LIMITED
North Humber Connection Node C 132kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 40 MW in the file dated 20 Dec 2024
Beinn Ghlas
PRO-004073, HEADWIND DEVELOPMENT SERVICES LIMITED
Taynuilt GSP
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 57.6 MW in the file dated 20 Dec 2024
Cottam-Ryhall Solar & BESS
PRO-004100, TYLER HILL RENEWABLES LIMITED
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Balrobert Farm BESS
PRO-004118, ELGIN ENERGY ES CO LIMITED
Knocknagael 132kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 150 MW in the file dated 20 Dec 2024
Middleton farm BESS
PRO-004120, Bluestone Energy Ltd
Neilston 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 937 MW in the file dated 20 Dec 2024
Natpower Enderby - Patford Bridge Green Energy Park
PRO-004132, NP SPV33 LIMITED
Patford Bridge 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,799 MW in the file dated 20 Dec 2024
Project Invicta
PRO-004133, The Farm Energy Company Limited
East Kent Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 340 MW in the file dated 20 Dec 2024
Galileo 05
PRO-004173, Galileo Empower UK Limited
Lynemore Windfarm 132kV Substation
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 84 MW in the file dated 20 Dec 2024
Meall Buidhe Wind Farm
PRO-004198, MUIRDEN ENERGY LLP
Shin GSP
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 40 MW in the file dated 20 Dec 2024
Minnygryle Burn Energy Park
PRO-004204, Wind 2 Project 6 Limited
Glenlee 132/11kV
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 84 MW in the file dated 20 Dec 2024
Lagrae Battery Storage
PRO-004214, LAGRAE BATTERY STORAGE LIMITED
Glenmuckloch 132kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Bridgwater Energy Park
PRO-004215, EXAGEN GROUP LIMITED
Bridgwater GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 249.99 MW in the file dated 20 Dec 2024
AGS Nerston BESS
PRO-004216, Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024
AGS Nerston 2 BESS
PRO-004226, Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 55 MW in the file dated 20 Dec 2024
AGS Nerston 3 BESS
PRO-004227, Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 55 MW in the file dated 20 Dec 2024
GF SELLINDGE BESS
PRO-004228, GF Sellindge Energy Ltd
East Kent connection node A 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024
Boreland BESS
PRO-004259, BORELAND ENERGY LTD
Killin GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 43 MW in the file dated 20 Dec 2024
Manor Farm
PRO-004269, QAIR RENEWABLES UK LIMITED
South Anglia Connection Node E 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Sutton Courtenay
PRO-004276, TBC PARTNERS LIMITED
Didcot 132kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 150 MW in the file dated 20 Dec 2024
Barrow
PRO-004297, NEW ENERGY PARTNERSHIP LIMITED
Harker 132kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 30 MW in the file dated 20 Dec 2024
Strathaven BESS
PRO-004298, IGP ENERGY STORAGE 2 LIMITED
Strathaven 400/275kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024
Foel Fach Wind Farm
PRO-004327, FOEL FACH WIND FARM LIMITED
North Wales connection Node A 400kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 79.2 MW in the file dated 20 Dec 2024
Cerulean Winds INTOG 1
PRO-004330, CERULEAN WINDS LIMITED
Peterhead 400kV Substation
Demand;Wind Offshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 600 MW in the file dated 20 Dec 2024
NatPower Kinoulton Green Energy Park
PRO-004333, NP SPV32 LIMITED
Grendon 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,330 MW in the file dated 20 Dec 2024
Lambeeth 240MW
PRO-004361, ECODEV GROUP LTD
Pembroke 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
NatPower Yaxley Green Energy Park
PRO-004371, NP SPV 40 LIMITED
North Anglia Connection Node C 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
NatPower Allington Green Energy Park
PRO-004387, NP SPV35 LIMITED
Cottam 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
Elmya Morningside BESS & PV
PRO-004396, ELMYA RPC UK MORNINGSIDE LIMITED
Elmya Morningside 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Bearsden BESS
PRO-004404-1, BEARSDEN BESS LTD
Windyhill 275/132kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 100 MW in the file dated 20 Dec 2024
Bearsden BESS
PRO-004404-2, BEARSDEN BESS LTD
Windyhill 275/132kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Elmya Bathgate BESS
PRO-004416, RPC ELMYA CARNATION DEVCO LIMITED
Armadale 400kv Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024
NatPower Gwyddelwern Green Energy Park
PRO-004432, NP SPV31 Limited
North Wales connection Node A 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
Butlers Wood PV & BESS Station
PRO-004467, IB VOGT UK LTD
South Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Biggleswade High Impact Green Energy Hub
PRO-004477, TELIS ENERGY UK LIMITED
Biggleswade 400kV Substation
Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
Mybster 2 Battery Storage
PRO-004479, POTENCIA ENERGY LIMITED
Mybster 3 132/33kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Redhall BESS
PRO-004487, ANESCO LIMITED
Wearside Connection Node D 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024
Devonhill
PRO-004492, CBS ENERGY STORAGE ASSETS UK LIMITED
Strathaven 400/275kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Greta IV (b)
PRO-004499, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Greta IV (c)
PRO-004500, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Greta IV (d)
PRO-004501, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Huntingdon High Impact Energy Hub 1
PRO-004507, TELIS ENERGY UK LIMITED
West Anglia Connection Node H 400kVSubstation
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
EPL Hampshire
PRO-004533, EPL NEWCO7 LIMITED
Nursling 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 480 MW in the file dated 20 Dec 2024
Drinkstone Hybrid
PRO-004534, BUCCLEUCH ESTATES LTD (THE)
Hawick 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 55 MW in the file dated 20 Dec 2024
Oak Holt Solar
PRO-004539, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
Trent Vally North Connection Node C 400kv Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Enderby Solar & BESS
PRO-004540, GREENTECH PROJECTS HOLDING UK LIMITED
Enderby 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Bernicia Energy Park
PRO-004541, BAYWA R.E. UK LIMITED
Stella West 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 350 MW in the file dated 20 Dec 2024
Kinoulton Solar & BESS
PRO-004560, GREENTECH PROJECTS HOLDING UK LIMITED
Stoke Bardolph 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
NatPower Tilbury Green Energy Park
PRO-004562, NATPOWER MARINE UK LIMITED
South Anglia Connection Node C 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
NatPower Immingham Green Energy Park
PRO-004566, NATPOWER MARINE UK LIMITED
Trent Valley North Connection Node F 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
Noventum -New Marton
PRO-004634, NOVENTUM POWER SOLAR 11 LIMITED
Cheshire Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 510 MW in the file dated 20 Dec 2024
Noventum- Bridgwater
PRO-004650, NOVENTUM POWER SOLAR 13 LIMITED
Woolavington 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 380 MW in the file dated 20 Dec 2024
Noventum - Budby
PRO-004652, NOVENTUM POWER SOLAR 15 LIMITED
Trent Valley South Connection Node D 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 380 MW in the file dated 20 Dec 2024
Manquhill Wind Farm
PRO-004662, ENERGYFARM UK MANQUHILL LTD
Manquhill Wind Farm 132/33kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 56 MW in the file dated 20 Dec 2024
Divot Hill Wind Farm
PRO-004664, ENERGYFARM DIVOT HILL LTD
Divot Hill 132/33 kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 63 MW in the file dated 20 Dec 2024
BlackDyke BESS
PRO-004671, ANESCO LIMITED
Leeds North Connection Node D 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 250 MW in the file dated 20 Dec 2024
Calderdale Wind Farm 312MW
PRO-004714, CALDERDALE WIND FARM LTD
Calderdale Wind Farm 275kV Substation
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 312 MW in the file dated 20 Dec 2024
Perry Barr BESS
PRO-004745, Perry Barr Limited
Nechells East GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 249 MW in the file dated 20 Dec 2024
Dounreay BESS
PRO-004749, FIELD DEVCO LTD
New Dounreay 400kV substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024
Netherton Hub Bess
PRO-004753, FIELD DEVCO LTD
Netherton 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024
Field Glenniston BESS
PRO-004754, FIELD DEVCO LTD
Glenniston GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024
Broadford BESS
PRO-004756, FIELD DEVCO LTD
Broadford GSP
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024
New Deer 2 BESS
PRO-004758, FIELD DEVCO LTD
New Deer 2 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024
Clashindarroch windfarm extension
PRO-004769, CLASHINDARROCH WINDFARM EXTENSION LIMITED
Clashindarroch Windfarm Extension 132kV Substation
Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 145.2 MW in the file dated 20 Dec 2024
Balinoe Wind Farm
PRO-004776, RWE RENEWABLES UK ONSHORE WIND LIMITED
A'Chruach Wind Farm 275kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 160.6 MW in the file dated 20 Dec 2024
NatPower Connah Quay Green Energy Park
PRO-004797, NP SPV24 LIMITED
Connah's Quay 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Chesters
PRO-004805, Queequeg Renewables Ltd
Teviot 400/132kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 80 MW in the file dated 20 Dec 2024
NatPower Llanteg Green Energy Park
PRO-004806, NP SPV30 LIMITED
Llanteg 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 47.5 MW in the file dated 20 Dec 2024
Lightsource Patford Bridge
PRO-004807, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Derbyshire Connection Node I 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Lightsource Offerton
PRO-004808, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Wearside Connection Node B 2 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Elmya Towcester BESS
PRO-004809, RPC ELMYA CARNATION DEVCO LIMITED
Derbyshire Connection Node I 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 550 MW in the file dated 20 Dec 2024
Lightsource Middleton
PRO-004817, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Middleton 400KV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
NatPower Hawthorn Pit Green Energy Park
PRO-004820, NP SPV 29 LIMITED
Hawthorn Pit 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024
Lightsource Willington
PRO-004824, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Willington 400kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Lightsource Folly Farm
PRO-004825, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Severn Connection Node A 400kv Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Lightsourcebp Wakeleys Wind and BESS
PRO-004827, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Wakeleys 400kV
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Lightsource Bagots Farm
PRO-004829, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Drakelow 400kV Substation
Energy Storage System;Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
Long Stratton BESS
PRO-004850, FIELD DEVCO LTD
North Anglia Connection Node A 400kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Lightsourcebp Amlwch BESS and Hydrogen
PRO-004856, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Wylfa South 400kV Substation
Demand;Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 600 MW in the file dated 20 Dec 2024
Lightsource Berthlwyd
PRO-004858, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Mid Wales Connection Node A
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024
NatPower Kintore2 Green Energy Park
PRO-004860, NP SPV 41 LIMITED
Kintore 275kV
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024
Long Stratton 400
PRO-004868, ENSO GREEN HOLDINGS X LIMITED
North Anglia Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024
Offerton 200MW BESS
PRO-004910, Decerna Limited
Offerton 275kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024
Elmya Foxdale BESS
PRO-004934, RPC ELMYA CARNATION DEVCO LIMITED
Trent Valley South Connection Node C 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 800 MW in the file dated 20 Dec 2024
Forsa Energy Denny BESS
PRO-004971, FORSA ENERGY GAS HOLDINGS LIMITED
FORSA ENERGY DENNY BESS 132KV GRID SUPPLY POINT SUBSTATION
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 99.9 MW in the file dated 20 Dec 2024
NatPower Navenby Energy Park
PRO-005006, NAVENBY ENERGY LIMITED
Navenby 400kV Substation
Energy Storage System
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,030 MW in the file dated 20 Dec 2024
Waltham Cross PV & BESS Sub
PRO-005801, EPPING ENERGY PARK LIMITED
Waltham Cross B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 249.9 MW in the file dated 20 Dec 2024
Back on the register 5
Elstree (tertiary)
PRO-000400, ELSTREE GREEN LIMITED
Elstree 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 27 Sep 2024 (archived copy); printed again with 57 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024
Rayleigh 2 Tertiary
PRO-000466, ENSO GREEN HOLDINGS LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 27 Sep 2024 (archived copy); printed again with 47.5 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024
Seagreen 1 Offshore Wind Farm
PRO-000527, Seagreen Wind Energy Limited
Tealing 275/33kV Substation
Wind Offshore
Absent from the file dated 27 Sep 2024 (archived copy); printed again with 1,075 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024
West Burton
PRO-001323, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 27 Sep 2024 (archived copy); printed again with 120 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024
Ratcliffe-on-Soar II
PRO-002158, ENSO GREEN HOLDINGS LIMITED
Ratcliffe-On-Soar 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Absent from the file dated 27 Sep 2024 (archived copy); printed again with 590 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024
Removed from the register 41
Finlarig
PRO-000079, SSE GENERATION LIMITED
Finlarig GSP
Hydro
Printed with 16.5 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Drax (Coal)
PRO-000130, DRAX POWER LIMITED
Drax 400kV Substation
Coal
Printed with 2,001 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Elstree (tertiary)
PRO-000400-1, ELSTREE GREEN LIMITED
Elstree 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Elstree (tertiary)
PRO-000400-2, ELSTREE GREEN LIMITED
Elstree 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Rayleigh 2 Tertiary
PRO-000466-1, ENSO GREEN HOLDINGS LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Rayleigh 2 Tertiary
PRO-000466-2, ENSO GREEN HOLDINGS LIMITED
Rayleigh Main 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 57 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Seagreen 1 Offshore Wind Farm
PRO-000527-1, Seagreen Wind Energy Limited
Tealing 275/33kV Substation
Wind Offshore
Printed with 10 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Seagreen 1 Offshore Wind Farm
PRO-000527-2, Seagreen Wind Energy Limited
Tealing 275/33kV Substation
Wind Offshore
Printed with 600 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Seagreen 1 Offshore Wind Farm
PRO-000527-3, Seagreen Wind Energy Limited
Tealing 275/33kV Substation
Wind Offshore
Printed with 1,075 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Capenhurst
PRO-000540-1, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 449.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Capenhurst
PRO-000540-2, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 457 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
CPG Power
PRO-000542, ESB ASSET DEVELOPMENT UK LIMITED
Carrington 400KV Substation
Gas Reciprocating
Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Red John PSH
PRO-000570, STATKRAFT HIGHLANDS PSH LIMITED
Red John 275kV Switching Station
Pump Storage
Printed with 450 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
West Burton
PRO-001323-1, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
West Burton
PRO-001323-2, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 99.8 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
West Burton
PRO-001323-3, ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 120 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
North Sea
PRO-001375, RWE RENEWABLES UK LIMITED
RWE North Sea Offshore Substation
Wind Offshore
Printed with 1,500 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Dogger Bank South West (was Irish Sea)
PRO-001386, RWE RENEWABLES UK LIMITED
Wylfa 400kV Substation
Wind Offshore
Printed with 1,500 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
One Planet Solar Farm
PRO-001505, ONE PLANET SOLAR FARM LIMITED
Eaton Socon 400kV Substation
PV Array (Photo Voltaic/solar)
Printed with 500 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Celtic Sea Offshore Wind Farm
PRO-001763-1, CELTIC SEA OFFSHORE WIND FARM LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Printed with 400 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Celtic Sea Offshore Wind Farm
PRO-001763-2, CELTIC SEA OFFSHORE WIND FARM LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Printed with 1,400 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Ratcliffe-on-Soar II
PRO-002158-1, ENSO GREEN HOLDINGS LIMITED
Ratcliffe-On-Soar 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 200 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Ratcliffe-on-Soar II
PRO-002158-2, ENSO GREEN HOLDINGS LIMITED
Ratcliffe-On-Soar 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 300 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Ratcliffe-on-Soar II
PRO-002158-3, ENSO GREEN HOLDINGS LIMITED
Ratcliffe-On-Soar 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 400 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
CS4
PRO-002239, FRED OLSEN SEAWIND LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Printed with 1,000 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Paxton Dal Energy Park
PRO-002476, Renewable Energy Systems Limited
Paxton Dal Energy Park 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 600 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Red Hill Energy Park
PRO-002482, Renewable Energy Systems Limited
Monk Fryston 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 800 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Tamar-Richborough
PRO-002560, TI PROJECTCO 2 LIMITED
Richborough 400kV Substation
Reactive Compensation
Printed with 0 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Ridham Battery Storage
PRO-002565, CAMBRIDGE POWER LIMITED
Kemsley 400kV Substation
Energy Storage System
Printed with 350 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Tamar-Hartmoor
PRO-002570, TI PROJECTCO 3 LIMITED
Hartmoor 275kV Substation
Reactive Compensation
Printed with 0 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Tamar-Landulph
PRO-002581, TI PROJECTCO 1 LIMITED
Landulph 400kV Substation
Reactive Compensation
Printed with 0 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Ratcliffe-On-Soar PV & BESS
PRO-002622, O&G Solar (SPV 49) Limited
Kegworth B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 249.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
AGS Calderside Battery Energy Storage System
PRO-002752, Advance Grid Solutions Limited
Calderside 275kV Substation
Energy Storage System
Printed with 300 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Orsted Celtic Sea (OCS01)
PRO-003100, ORSTED POWER (UK) LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Printed with 1,350 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Orsted Celtic Sea 2 (OCS02)
PRO-003101, ORSTED POWER (UK) LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Printed with 1,350 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
CS14
PRO-003548, FRED OLSEN SEAWIND LIMITED
Alverdiscott 400kV Substation
Wind Offshore
Printed with 1,000 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Grain Energy
PRO-003771, SECTION 31 SOLUTIONS LTD
Grain West 400kV Substation
Energy Storage System
Printed with 249 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Lerwick Hydrogen
PRO-003965, STATKRAFT HYDROGEN UK HOLDING LIMITED
Gremista GSP
Energy Storage System
Printed with 2 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
East Quantoxhead PV & BESS Station
PRO-004184, IB VOGT UK LTD
West Country Connection Node D 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 240 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Bearsden BESS
PRO-004404, BEARSDEN BESS LTD
Windyhill 275/132kV
Energy Storage System
Printed with 100 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Glebe Energy Park
PRO-004619, Renewable Energy Systems Limited
Yaxley 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Printed with 800 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024
Connection date later 97
Low Carbon Energy Centre BESS Joyce Green Lane
PRO-003540, NET ZERO MARINE SERVICES LIMITED
Littlebrook 132kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2027 to 31 Oct 2037 (+3,654 days)
Bellbroughton Energy Park
PRO-002826, ELGIN ENERGY ES CO LIMITED
Warwickshire Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2027 to 30 Oct 2037 (+3,653 days)
Dunclent Battery Storage
PRO-002827, Firma Vogt Solar Ltd
Warwickshire Connection Node A 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2030 to 30 Oct 2037 (+2,556 days)
Machair Offshore Wind Farm
PRO-001392, SCOTTISHPOWER RENEWABLES (UK) LIMITED
Machair 275/66kV Offshore Substation
Wind Offshore
MW Effective From moved from 30 Apr 2028 to 16 Sep 2033 (+1,965 days)
Partridge Farm BESS
PRO-003445, Apatura Battery Ltd
Sellindge 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 31 Oct 2037 (+1,461 days)
Rugeley Battery Storage
PRO-002215, RUGELEY POWER GENERATION LIMITED
Rugeley 400kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2033 to 30 Oct 2037 (+1,461 days)
Bushbury
PRO-003409, Bushbury 10 Renewables Limited
Staffordshire Connection Node A 400kV Substation
Demand;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days)
Graeme Road Solar & BESS
PRO-004375, GREENTECH PROJECTS HOLDING UK LIMITED
Ryhall 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 30 Oct 2038 (+1,460 days)
North Killingholme Power Project
PRO-001038, C.GEN KILLINGHOLME LIMITED
Killingholme 400kV Substation
CCGT (Combined Cycle Gas Turbine)
MW Effective From moved from 31 Oct 2026 to 30 Sep 2030 (+1,430 days)
Grangemouth Hybrid BESS & Solar PV
PRO-003254, TAGENERGY DEVELOPMENT UK LIMITED
Grangemouth 275/33kV
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2028 to 30 Jun 2032 (+1,338 days)
Edinbane Windfarm
PRO-000135-2, VATTENFALL WIND POWER LTD
Edinbane 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From moved from 1 Jan 2030 to 30 Apr 2033 (+1,215 days)
Enderby Tertiary
PRO-000430, CLUMP FARM SOLAR LIMITED
Enderby 400kV Substation
PV Array (Photo Voltaic/solar)
MW Effective From moved from 1 May 2024 to 1 Aug 2027 (+1,187 days)
Lochgoin Solar Farm
PRO-001107, TURBINE MARKETING SPV LIMITED
Whitelee Extension 275/33kV
PV Array (Photo Voltaic/solar)
MW Effective From moved from 1 Aug 2024 to 29 Sep 2027 (+1,154 days)
Drakelow
PRO-000428, ENSO Green Holdings V Limited
Drakelow 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2024 to 1 Dec 2027 (+1,126 days)
Cold Norton
PRO-003528, BSR APPLICATIONS LIMITED
South Anglia Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
MW Effective From moved from 31 Oct 2033 to 31 Oct 2036 (+1,096 days)
Coryton
PRO-003407, Coryton 10 Renewables Limited
Coryton South 400kV Substation
Demand;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2031 to 31 Oct 2034 (+1,096 days)
Lightsource Enderby PV+BESS
PRO-003854, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Derbyshire Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2034 to 31 Oct 2037 (+1,096 days)
Sunnica
PRO-000393, SUNNICA LIMITED
Burwell 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2027 to 31 Oct 2030 (+1,096 days)
Wymondley BESS Limited
PRO-003496, AGR RENEWABLES LIMITED
Wymondley 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2031 to 31 Oct 2034 (+1,096 days)
Springfield Solar and Battery
PRO-002664, VOLTALIA UK LTD
Branxton 400/132kV
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2028 to 31 Oct 2031 (+1,095 days)
Walpole 2 (tertiary)
PRO-000505, ENSO GREEN HOLDINGS R LIMITED
Walpole 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2024 to 31 Oct 2027 (+1,095 days)
Loch Fearna Pumped Storage
PRO-002569, FEARNA PSH LIMITED
Loch Fearna Pumped Storage 132/18kV
Pump Storage
MW Effective From moved from 31 Oct 2029 to 28 Oct 2032 (+1,093 days)
Gammidge PV & BESS Park
PRO-001649, CS UK HOLDINGS III LIMITED
Grendon 132kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2024 to 15 Oct 2027 (+1,079 days)
Capenhurst
PRO-000540, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2030 to 30 Sep 2033 (+1,065 days)
Bramley (tertiary)
PRO-000396, BRAMLEY SOLAR LIMITED
Bramley
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2023 to 15 Aug 2026 (+1,019 days)
Valorous Offshore Wind Farm
PRO-001383, BLUE GEM WIND LIMITED
Pembroke 400kV Substation
Wind Offshore
MW Effective From moved from 2 Apr 2029 to 31 Oct 2031 (+942 days)
Quantans Hill Wind Farm
PRO-001247, VATTENFALL WIND POWER LTD
Quantans Hill 132kV Substation
Wind Onshore
MW Effective From moved from 30 Apr 2027 to 2 Jul 2029 (+794 days)
Scoop Hill Wind Farm
PRO-000327, CWP Energy Limited
Scoop Hill Wind Farm 132kV Substation
Wind Onshore
MW Effective From moved from 28 Aug 2025 to 31 Oct 2027 (+794 days)
Whitelaw Brae Windfarm
PRO-000341, WHITELAW BRAE WINDFARM LIMITED
Whitelaw Brae 'A' and 'B' 33kV Substations
Wind Onshore
MW Effective From moved from 28 Jun 2024 to 31 Jul 2026 (+763 days)
Cellarhead 400kV Energy Storage
PRO-001685, C & S ENERGY LIMITED
Cellarhead 400kV Substation
Energy Storage System
MW Effective From moved from 30 May 2024 to 30 Jun 2026 (+761 days)
BOOM Power Llanbabo Generation
PRO-001540, Carrog Storage Facility Limited
Wylfa 400kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2026 to 31 Oct 2028 (+732 days)
Enoch Hill
PRO-000152, RWE RENEWABLES UK ONSHORE WIND LIMITED
Enoch Hill 132/33kV Substation
Wind Onshore
MW Effective From moved from 30 May 2023 to 30 May 2025 (+731 days)
Swansea
PRO-002086, ENSO GREEN HOLDINGS LIMITED
Swansea North 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2030 to 31 Oct 2032 (+731 days)
Little Harrowden
PRO-003416, Little Harrowden 10 Renewables Limited
West Anglia Connection Node F 400kV Substation
Demand;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2032 to 31 Oct 2034 (+730 days)
Park Farm Hybrid Solar and BESS
PRO-003850, VOLTALIA UK LTD
Patford Bridge 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2035 to 30 Oct 2037 (+730 days)
Apley Head Farm
PRO-003968, Queequeg Renewables Ltd
Trent Valley South Connection Node B 400kV Substation.
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
Lynefield BESS
PRO-003555, WINDEL GRID 1 LIMITED
Borders Connection Node A 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
Spennymoor Greener Grid Park
PRO-002041-2, STATKRAFT UK LTD
Spennymoor 400kV Substation
Energy Storage System;Reactive Compensation
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
Spennymoor PV & BESS Sub
PRO-003049, O&G Solar (SPV 20) Limited
Spennymoor 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days)
Exeter Main
PRO-002082, ENSO GREEN HOLDINGS LIMITED
Exeter 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 24 Nov 2031 to 28 Oct 2033 (+704 days)
Windy Standard III Wind Farm
PRO-000359-1, Windy Standard III Ltd
Dun Hill 132/33kV
Wind Onshore
MW Effective From moved from 30 Jun 2024 to 1 Jun 2026 (+701 days)
Windy Standard III Wind Farm
PRO-000359-2, Windy Standard III Ltd
Dun Hill 132/33kV
Wind Onshore
MW Effective From moved from 30 Jun 2024 to 1 Jun 2026 (+701 days)
Kirkby (Tertiary)
PRO-001083, PIVOTED POWER LLP
Kirkby GSP (ENW)
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2025 to 30 Aug 2027 (+668 days)
Mossy Hill Wind Farm
PRO-000461, MOSSY HILL SHETLAND LIMITED
Mossy Hill 132kV Substation
Demand;Wind Onshore
MW Effective From moved from 1 Apr 2027 to 30 Nov 2028 (+609 days)
Hornsea Power Station 4
PRO-000435-1, ORSTED HORNSEA PROJECT FOUR LIMITED
Creyke Beck 400kV Substation
Wind Offshore
MW Effective From moved from 1 Apr 2027 to 30 Oct 2028 (+578 days)
Bowsheil Solar and Battery
PRO-002662, VOLTALIA UK LTD
Bowsheils 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 2 May 2030 to 31 Oct 2031 (+547 days)
Ayrshire Grid Services Facility
PRO-001090, FLEXIBLEGRIDPOWER LTD
Hunterston East 400kV substation
Reactive Compensation
MW Effective From moved from 29 Mar 2024 to 3 Sep 2025 (+523 days)
Elchies Wind Farm
PRO-000151-1, ELCHIES WIND LIMITED
Elchies 132/33kV Substation
Wind Onshore
MW Effective From moved from 30 Jun 2027 to 30 Nov 2028 (+519 days)
Bicker Fen PV & BESS Sub
PRO-002575, O&G Solar (SPV 40) Limited
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 May 2033 to 30 Oct 2034 (+518 days)
Burwell BESS
PRO-003869, O&G Solar (SPV 38) Limited
Burwell Main 400kV Substation
Energy Storage System
MW Effective From moved from 30 Jun 2033 to 30 Oct 2034 (+487 days)
Enderby (Akira)
PRO-000426, ENDERBY BATTERY STORAGE LIMITED
Enderby 400kV Substation
Energy Storage System
MW Effective From moved from 31 Aug 2023 to 9 Dec 2024 (+466 days)
Glenmuckloch Pumped Storage
PRO-000299, GLENMUCKLOCH PUMPED STORAGE HYDRO LIMITED
Glenmuckloch 132/33kV
Pump Storage
MW Effective From moved from 30 Jun 2027 to 1 Oct 2028 (+459 days)
Creachan Wind Farm
PRO-003906, RWE RENEWABLES UK ONSHORE WIND LIMITED
Creachan Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From moved from 30 Jul 2029 to 31 Oct 2030 (+458 days)
Net Zero Teesside Power Project
PRO-001400, NET ZERO TEESSIDE POWER LIMITED
Tod Point 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand
MW Effective From moved from 30 Apr 2026 to 30 Jul 2027 (+456 days)
Inch Cape Offshore Wind Farm Platform 1
PRO-000348, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From moved from 1 Apr 2025 to 21 Jun 2026 (+446 days)
Inch Cape Offshore Wind Farm Platform 2
PRO-000349, INCH CAPE OFFSHORE LIMITED
Cockenzie 400/275kV
Wind Offshore
MW Effective From moved from 1 Apr 2025 to 21 Jun 2026 (+446 days)
South Kyle 2 Wind farm
PRO-001963, VATTENFALL WIND POWER LTD
South Kyle 2 132/33kV Substation
Energy Storage System;Wind Onshore
MW Effective From moved from 25 May 2029 to 31 Jul 2030 (+432 days)
Ouse Energy Storage
PRO-001861, Ouse Energy Limited
Kemsley 400kV Substation
Energy Storage System
MW Effective From moved from 24 Aug 2026 to 27 Oct 2027 (+429 days)
Pembroke BESS
PRO-000337, RWE GENERATION UK PLC
Pembroke 400kV Substation
Energy Storage System
MW Effective From moved from 1 Oct 2026 to 29 Oct 2027 (+393 days)
WindyHill Energy Storage Facility
PRO-001696, ENERGYGRIDPOWER LTD
Windyhill 275/132kV
Energy Storage System
MW Effective From moved from 30 Jul 2024 to 27 Aug 2025 (+393 days)
Elmya Hunterston
PRO-003182, ELMYA RPC UK HUNTERSTON LIMITED
Hunterston 400/132kV
Energy Storage System
MW Effective From moved from 9 Oct 2029 to 25 Oct 2030 (+381 days)
Gartclash Farm BESS
PRO-003736, BOOM DEVELOPMENTS LTD
Denny North 275/132kV
Energy Storage System
MW Effective From moved from 29 Oct 2027 to 30 Oct 2028 (+367 days)
Aberarder Wind Farm
PRO-000368, ABERARDER WIND FARM LLP
Aberarder Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From moved from 30 Aug 2025 to 31 Aug 2026 (+366 days)
Cloich Forest Wind Farm
PRO-001387, EDF ENERGY RENEWABLES LIMITED
Cloiche 132kV Substation
Wind Onshore
MW Effective From moved from 30 Jul 2028 to 31 Jul 2029 (+366 days)
Hare Craig Wind Farm
PRO-000940, ENERGYFARM UK HARE CRAIG LLP
Hare Craig 33kV Substation
Wind Onshore
MW Effective From moved from 31 Oct 2027 to 31 Oct 2028 (+366 days)
Heckington Fen Solar Park
PRO-001903, ECOTRICITY GENERATION LIMITED
Bicker Fen 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 1 Oct 2027 to 1 Oct 2028 (+366 days)
Kirkton Wind Farm
PRO-001811, Kirkton Wind Farm Ltd
Connagill 275kV Substation
Wind Onshore
MW Effective From moved from 31 Oct 2027 to 31 Oct 2028 (+366 days)
Lightsource Grendon PV+BESS
PRO-003742, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
West Anglia Connection Node C 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2033 to 31 Oct 2034 (+366 days)
Walsoken Battery
PRO-002690, Walsoken Limited
North Anglia Connection Node D 132kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2033 to 31 Oct 2034 (+366 days)
Craig Watch Wind Farm
PRO-001877, Craig Watch Wind Farm Limited
Craig Watch Substation
Wind Onshore
MW Effective From moved from 30 Jun 2028 to 30 Jun 2029 (+365 days)
Fallago Rig 2
PRO-000526, EDF ENERGY RENEWABLES LIMITED
Fallago 400/33kV
Wind Onshore
MW Effective From moved from 30 Apr 2028 to 30 Apr 2029 (+365 days)
Gresham House Kincardine BESS
PRO-002368, FLAVUSIA LTD
Kincardine 275kV
Energy Storage System
MW Effective From moved from 31 Oct 2028 to 31 Oct 2029 (+365 days)
Hornsea Power Station 4
PRO-000435-2, ORSTED HORNSEA PROJECT FOUR LIMITED
Creyke Beck 400kV Substation
Wind Offshore
MW Effective From moved from 31 Oct 2028 to 31 Oct 2029 (+365 days)
Keith 132 Greener Grid Park
PRO-001129-2, KEITH STORAGE SOLUTIONS LIMITED
Keith 1 132/33kV GSP Substation
Energy Storage System;Reactive Compensation
MW Effective From moved from 31 May 2024 to 31 May 2025 (+365 days)
Knockcronal Wind Farm
PRO-001801, Knockcronal Wind Farm Limited
Knockcronal Wind Farm 33kV Substation
Wind Onshore
MW Effective From moved from 30 Oct 2028 to 30 Oct 2029 (+365 days)
Lightsource Lower Frankton
PRO-003859, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Cheshire Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2036 to 30 Oct 2037 (+365 days)
MALTBY DEV.
PRO-003064, Firma Vogt Solar Ltd
Thurcroft 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days)
Penwortham Green Energy Centre
PRO-001694-2, PENWORTHAM GREEN ENERGY LIMITED
Penwortham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2036 to 31 Oct 2037 (+365 days)
Project Number 4
PRO-002704, Greta IV Limited
North Anglia Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days)
West Weybridge
PRO-003410, West Weybridge 10 Renewables Limited
London West Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 31 Oct 2038 (+365 days)
Zenobe Necton BESS
PRO-003402, ZENOBE ENERGY LIMITED
Necton 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days)
High Marnham BESS
PRO-003452, JG PEARS GRID CONNECTION LIMITED
High Marnham 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2033 to 30 Oct 2034 (+364 days)
WindyHill BESS2 Facility
PRO-002032, ENERGYGRIDPOWER LTD
Windyhill 275/132kV
Energy Storage System
MW Effective From moved from 30 Sep 2024 to 27 Jul 2025 (+300 days)
Norfolk Boreas
PRO-000399-2, NORFOLK BOREAS LIMITED
Necton 400kV Substation
Wind Offshore
MW Effective From moved from 31 Mar 2030 to 31 Dec 2030 (+275 days)
Twyn Hywel Cillfynydd
PRO-001497, Twyn Hywel Energy Park Ltd
Cilfynydd 400kV Substation
Wind Onshore
MW Effective From moved from 30 Jun 2025 to 31 Mar 2026 (+274 days)
Rothienorman Sync Comp
PRO-001445, ROTHIENORMAN GRID SERVICES LIMITED
Rothienorman 400kV Substation
Reactive Compensation
MW Effective From moved from 31 Mar 2024 to 31 Oct 2024 (+214 days)
Lakeside Energy Drax
PRO-001522, LAKESIDE ENERGY STORAGE LIMITED
Drax 132kV Substation
Energy Storage System
MW Effective From moved from 29 Mar 2024 to 29 Sep 2024 (+184 days)
Elchies Wind Farm
PRO-000151-2, ELCHIES WIND LIMITED
Elchies 132/33kV Substation
Wind Onshore
MW Effective From moved from 30 Jun 2028 to 30 Nov 2028 (+153 days)
Feckenham
PRO-002189, ENSO GREEN HOLDINGS LIMITED
Feckenham 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Jul 2036 to 31 Oct 2036 (+92 days)
Glenshimmeroch Windfarm
PRO-000440, ENERGYFARM UK GLENSHIMMEROCH LLP
SPT Margree collector substation
Wind Onshore
MW Effective From moved from 26 Aug 2027 to 31 Oct 2027 (+66 days)
Bulls Lodge Farm
PRO-002676, 548 UK INVESTMENT HOLDINGS LIMITED
Braintree 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Mar 2033 to 30 Apr 2033 (+31 days)
Thurrock Power Station
PRO-000494, THURROCK FLEXIBLE GENERATION LIMITED
Tilbury 275kV Substation
Energy Storage System;Gas Reciprocating
MW Effective From moved from 31 Oct 2024 to 28 Nov 2024 (+28 days)
Tillbridge Solar
PRO-001126, TILLBRIDGE SOLAR LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 1 Aug 2028 to 27 Aug 2028 (+26 days)
Gastard BESS
PRO-003552, SIRIUSECODEV (GASTARD) LTD
Melksham B 132KV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 15 Nov 2037 (+15 days)
Vanguard East
PRO-000580-1, Norfolk Vanguard East Ltd
Necton 400kV Substation
Wind Offshore
MW Effective From moved from 20 Mar 2028 to 1 Apr 2028 (+12 days)
Dove Solar
PRO-004166, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED
North Anglia Connection Node E 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2034 to 31 Oct 2034 (+1 days)
Sizing John (Rainhill)
PRO-001581-1, SIZING JOHN LIMITED
Rainhill GSP
Energy Storage System
MW Effective From moved from 30 Oct 2024 to 31 Oct 2024 (+1 days)
Connection date earlier 29
Corshellach Battery Energy Storage System
PRO-002328, Renewable Energy Systems Limited
Berry Burn GSP
Energy Storage System
MW Effective From moved from 31 Oct 2031 to 31 Oct 2027 (−1,461 days)
Sellindge West
PRO-003412, Sellindge West 10 Renewables Limited
East Kent connection node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 31 Oct 2033 (−1,461 days)
Windy Standard III Wind Farm
PRO-000359-3, Windy Standard III Ltd
Dun Hill 132/33kV
Wind Onshore
MW Effective From moved from 30 Jun 2029 to 1 Jun 2026 (−1,125 days)
Lightsource Yaxley PV
PRO-003837, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
North Anglia Connection Node E 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 31 Oct 2034 (−1,096 days)
Ayr Farm
PRO-003596, NEW ENERGY PARTNERSHIP LIMITED
Ayr 275/33kV
Energy Storage System
MW Effective From moved from 30 Aug 2030 to 26 May 2028 (−826 days)
Tewitt Farm BESS
PRO-003917, Apatura Battery Ltd
Bradford West GSP
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days)
Saltend North BESS & PV
PRO-002236, EEB74 LIMITED
Hedon 275kV Substation
Energy Storage System
MW Effective From moved from 30 Oct 2037 to 30 Oct 2035 (−731 days)
West Haddon
PRO-003417, West Haddon 10 Renewables Limited
Derbyshire Connection Node A 400kV Substation
Demand;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2039 to 30 Oct 2037 (−731 days)
Lightsource Braybrooke
PRO-003989, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
West Anglia Connection Node F 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2036 to 31 Oct 2034 (−730 days)
Lightsource Marston Vale 240MW PV+BESS
PRO-003981, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Marston Vale 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2036 to 31 Oct 2034 (−730 days)
Lightsource Norton East PV
PRO-003741, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Norton East 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2036 to 30 Oct 2035 (−367 days)
Middle Farm Chollerton
PRO-004344, ENRAY POWER LTD
Borders Connection Node A 400kV
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2036 to 30 Oct 2035 (−367 days)
Arkwright
PRO-003248, ARLINGTON (GROUP SERVICES) LIMITED
Chesterfield 400kV Substation (Not yet constructed)
Energy Storage System
MW Effective From moved from 31 Oct 2035 to 30 Oct 2034 (−366 days)
Lightsource Overton
PRO-003958, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
North Humber Connection Node E 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 30 Oct 2036 to 30 Oct 2035 (−366 days)
Amersham Main
PRO-003404, Amersham 10 Renewables Limited
London North West Connection Node A 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2038 to 31 Oct 2037 (−365 days)
Butlers Energy Project
PRO-003946, IG RENEWABLES SPV 1 LTD
Butlers Wood 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2035 to 31 Oct 2034 (−365 days)
Fell Wind Farm
PRO-001755, ENERGYFARM UK FELL LLP
Fell Wind Farm 132/33kV Substation
Wind Onshore
MW Effective From moved from 30 Oct 2028 to 31 Oct 2027 (−365 days)
Nethercourt Solar & BESS Farm
PRO-003437, GREENTECH PROJECTS HOLDING UK LIMITED
Nethercourt Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2035 to 31 Oct 2034 (−365 days)
Zenobe Yaxley BESS
PRO-004088, ZENOBE ENERGY LIMITED
North Anglia Connection Node E 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2035 to 31 Oct 2034 (−365 days)
Eredine Wind Farm
PRO-002005, RWE RENEWABLES UK ONSHORE WIND LIMITED
An Suidhe 275/33kV
Wind Onshore
MW Effective From moved from 31 Oct 2030 to 1 Nov 2029 (−364 days)
Recell at Penrhos (BEGA)
PRO-000330-2, Recell Energy Bloom Developments Limited
Penrhos GSP
Biomass
MW Effective From moved from 31 Oct 2027 to 8 Mar 2027 (−237 days)
JBM Solar 13 - Melksham
PRO-000495, JBM SOLAR PROJECTS 13 LIMITED
Melksham 400kV Substation
Thermal
MW Effective From moved from 30 Jun 2026 to 14 Nov 2025 (−228 days)
Carrington Lane BESS
PRO-003215, Apatura Battery Ltd
Daines 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Cellarhead PV & BESS Station
PRO-003240, IB VOGT UK LTD
Manchester South Connection Node B 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Coddington
PRO-003750, STARLIGHT ENERGY UK LIMITED
Eaton Socon 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days)
Lightsource Bodelwyddan
PRO-003877, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED
Bodelwyddan 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Rhigos BESS
PRO-003613, KONA ASSET 4 LIMITED
South Wales West Connection Node A 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Spennymoor BESS Station
PRO-003681, IGP INTERNATIONAL PROSPECTING LIMITED
Spennymoor 400kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days)
Whitson BESS
PRO-003862, FIELD DEVCO LTD
Whitson 275kV Substation
Energy Storage System
MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days)
Connection date added 1
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
MW Effective From printed as 1 Jan 2027; blank in the file dated 27 Sep 2024
Connection date removed 4
Broken Cross Windfarm
PRO-000395, BROKEN CROSS WIND FARM LIMITED
Broken Cross 132/33kV
Wind Onshore
MW Effective From was 30 Sep 2023; blank in the file dated 20 Dec 2024
Dogger Bank Project A
PRO-000411, DOGGERBANK OFFSHORE WIND FARM PROJECT 1 PROJCO LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
MW Effective From was 1 Apr 2023; blank in the file dated 20 Dec 2024
Walpole
PRO-001114, PIVOTED POWER LLP
Walpole 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2022; blank in the file dated 20 Dec 2024
Sundon Pivoted Power
PRO-001123, PIVOTED POWER LLP
Sundon 400kV Substation
Energy Storage System
MW Effective From was 31 Oct 2023; blank in the file dated 20 Dec 2024
Capacity up 10
Drax Power Station
PRO-000129, DRAX POWER LIMITED
Drax 400kV Substation
Biomass
Cumulative Total Capacity changed from 1,905 MW to 3,906 MW (+2,001 MW)
Ayr Farm
PRO-003596, NEW ENERGY PARTNERSHIP LIMITED
Ayr 275/33kV
Energy Storage System
Cumulative Total Capacity changed from 300 MW to 500 MW (+200 MW)
Saltend North BESS & PV
PRO-002236, EEB74 LIMITED
Hedon 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 100 MW to 200 MW (+100 MW)
Drakelow
PRO-000428, ENSO Green Holdings V Limited
Drakelow 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Cumulative Total Capacity changed from 57 MW to 120 MW (+63 MW)
Newarthill Energy Park
PRO-002532, Geocore (Newarthill) Ltd
Newarthill Energy Park 275kV Substation
Energy Storage System
Cumulative Total Capacity changed from 250 MW to 300 MW (+50 MW)
Richborough 1
PRO-001165, RICHBOROUGH ENERGY PARK LIMITED
Richborough 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 50 MW to 100 MW (+50 MW)
Richborough 2
PRO-001164, RICHBOROUGH ENERGY PARK LIMITED
Richborough 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 50 MW to 100 MW (+50 MW)
South Kyle 2 Wind farm
PRO-001963, VATTENFALL WIND POWER LTD
South Kyle 2 132/33kV Substation
Energy Storage System;Wind Onshore
Cumulative Total Capacity changed from 67 MW to 92.4 MW (+25.4 MW)
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
Cumulative Total Capacity changed from 47 MW to 51.2 MW (+4.2 MW)
Mannington
PRO-001091, PIVOTED POWER LLP
Mannington 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 47.5 MW to 49.9 MW (+2.4 MW)
Capacity down 4
Ratcliffe on Soar
PRO-000050, UNIPER UK LIMITED
Ratcliffe-On-Soar 400kV Substation
Demand;OCGT (Open Cycle Gas Turbine);PV Array (Photo Voltaic/solar);Waste
Cumulative Total Capacity changed from 2,021 MW to 1,224.7 MW (−796.3 MW)
Scarning
PRO-003275, CONNECTID 3 LIMITED
North Anglia Connection Node C 400kV Substation
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation
Cumulative Total Capacity changed from 1,400 MW to 800 MW (−600 MW)
NatPower Teesside Green Energy Park
PRO-004207, NATPOWER MARINE LIMITED
Teeside Connection Node A 400kV Substation
Energy Storage System
Cumulative Total Capacity changed from 1,034 MW to 1,000 MW (−34 MW)
Glenshimmeroch Windfarm
PRO-000440, ENERGYFARM UK GLENSHIMMEROCH LLP
SPT Margree collector substation
Wind Onshore
Cumulative Total Capacity changed from 50 MW to 45 MW (−5 MW)
Project status changed 21
Lochay (Part of Killin Cascade Hydro Scheme)
PRO-000174, SSE GENERATION LIMITED
Lochay GSP
Hydro
Project Status changed from Built to Under Construction/Commissioning
Dogger Bank Project A
PRO-000411, DOGGERBANK OFFSHORE WIND FARM PROJECT 1 PROJCO LIMITED
Dogger Bank 220kV Offshores
Wind Offshore
Project Status changed from Under Construction/Commissioning to Built
Capenhurst
PRO-000540, ENSO GREEN HOLDINGS LIMITED
Capenhurst 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Scoping
Walpole
PRO-001114, PIVOTED POWER LLP
Walpole 400kV Substation
Energy Storage System
Project Status changed from Under Construction/Commissioning to Built
Sundon Pivoted Power
PRO-001123, PIVOTED POWER LLP
Sundon 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Built
Highview Hunterston East Cryobattery
PRO-001348, HVS GRIDCO LTD
Hunterston East 400kV
Demand;Energy Storage System;Reactive Compensation
Project Status changed from Scoping to Consents Approved
Net Zero Teesside Power Project
PRO-001400, NET ZERO TEESSIDE POWER LIMITED
Tod Point 275kV Substation
CCGT (Combined Cycle Gas Turbine);Demand
Project Status changed from Awaiting Consents to Consents Approved
Cottam
PRO-001502-1, GATE BURTON ENERGY PARK LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Cottam
PRO-001502-2, GATE BURTON ENERGY PARK LIMITED
Cottam 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Lakeside Energy Drax
PRO-001522, LAKESIDE ENERGY STORAGE LIMITED
Drax 132kV Substation
Energy Storage System
Project Status changed from Consents Approved to Built
Dog Trap Lane
PRO-001626, HD381GRE Limited
Minety 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Somerford
PRO-001631, PD813ETY LTD
Minety 400kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Awaiting Consents to Consents Approved
Pond Hill Farm 2 BESS
PRO-001635, PD688IRO LTD
Minety 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Pond Hill Farm 1
PRO-001637, PD688IRO LTD
Minety 400kV Substation
Energy Storage System
Project Status changed from Awaiting Consents to Consents Approved
Essendine
PRO-001643, MALLARD PASS SOLAR FARM LIMITED
Ryhall 400kV Substation
PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Kinmuck PV and BESS Station
PRO-001700, IGP SOLAR 24 LIMITED
Peterhead GSP
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Awaiting Consents
Meetlaw BESS
PRO-001966, CARRAVINDOON LIMITED
Fiddes GSP
Energy Storage System
Project Status changed from Scoping to Consents Approved
Ferrybridge B BESS & Solar Substation
PRO-002521, O&G Solar (SPV 19) Limited
Ferrybridge B 132kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Barking BESS
PRO-003518, O&G Solar (SPV 52) Limited
Barking 275kV Substation
Energy Storage System;PV Array (Photo Voltaic/solar)
Project Status changed from Scoping to Consents Approved
Knocknagael BESS
PRO-003712, VIRMATI ENERGY LTD
Knocknagael 132kV Substation
Energy Storage System
Project Status changed from Scoping to Awaiting Consents
West Weybridge
PRO-004324, EL (WEST WEYBRIDGE) LIMITED
West Weybridge 275kV Substation
Energy Storage System
Project Status changed from Scoping to Consents Approved

By plant type

Plant typeProjects with a changeNewBack on the registerRemovedNet capacity change
Energy Storage System1095505+22,782.8 MW
Energy Storage System;PV Array (Photo Voltaic/solar)8520416+2,769.4 MW
Wind Onshore29700+904 MW
Wind Offshore254111−7,485 MW
Energy Storage System;Wind Onshore131100+1,619 MW
Pump Storage5201+550 MW
PV Array (Photo Voltaic/solar)5101−450.1 MW
Reactive Compensation50030 MW
Demand;PV Array (Photo Voltaic/solar)40000 MW
Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore4300+535 MW
Hydro4201+39.2 MW
Biomass2000+2,001 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar)2001−800 MW
Energy Storage System;Reactive Compensation20000 MW
CCGT (Combined Cycle Gas Turbine)10000 MW
CCGT (Combined Cycle Gas Turbine);Demand10000 MW
Coal1001−2,001 MW
Demand;Energy Storage System1100+600 MW
Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore1100+1,000 MW
Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation1000−600 MW
Demand;Energy Storage System;Reactive Compensation10000 MW
Demand;OCGT (Open Cycle Gas Turbine);PV Array (Photo Voltaic/solar);Waste1000−796.3 MW
Demand;Wind Offshore1100+600 MW
Demand;Wind Onshore10000 MW
Energy Storage System;Gas Reciprocating10000 MW
Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore1100+1,000 MW
Gas Reciprocating1001−49.9 MW
Thermal10000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.

By connection site

Connection siteProjects with a changeNewBack on the registerRemovedNet capacity change
Alverdiscott 400kV Substation6006−6,500 MW
Ratcliffe-On-Soar 400kV Substation5013−1,696.3 MW
Windyhill 275/132kV5201+240 MW
Cottam 400kV Substation4100+1,000 MW
Minety 400kV Substation40000 MW
North Anglia Connection Node B 400kV Substation4300+1,500 MW
Tealing 275/33kV Substation4013−1,685 MW
West Burton 132kV Substation4013−269.7 MW
Wylfa 400kV Substation4201+350 MW
Calderside 275kV Substation3201+500 MW
Capenhurst 275kV Substation3002−906.9 MW
Dun Hill 132/33kV30000 MW
East Kilbride B 275/33kV Substation3300+160 MW
Elstree 275kV Substation3012−106.9 MW
Enderby 400kV Substation3100+500 MW
Finlarig GSP3201+35 MW
Necton 400kV Substation30000 MW
North Anglia Connection Node E 400kV Substation30000 MW
Pembroke 400kV Substation3100+240 MW
Rayleigh Main 400kV Substation3012−106.9 MW
Red John 275kV Switching Station3201+550 MW
Richborough 400kV Substation3001+100 MW
RWE North Sea Offshore Substation3201+350 MW
Spennymoor 400kV Substation30000 MW
Bicker Fen 400kV Substation20000 MW

Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 220.

Earlier comparisons

Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.