File dated 27 Sep 2024compared withFile dated 20 Dec 2024How the files are matchedThe file dated 27 Sep 2024 is an archived copy (Internet Archive), not a file N84 collected from NESO.
N84 holds no copy between 27 Sep 2024 and 20 Dec 2024; each change below happened at some point in that time, not necessarily this week. Wide comparisons
Changes between the two files
321 changesacross 308 projects. Net change +22.22 GW (new, left the register and capacity changes), plus 1.89 GW back on the register after being absent from the archived copy dated 27 Sep 2024 (Internet Archive).- New on the register109
- Connection date later97
- Left the register41
- Connection date earlier29
- Status, stage or gate changed21
- Capacity changed14
- Back on the register5
- Connection date added or removed5
Table view
| Type | Changes |
|---|---|
| New on the register | 109 |
| Connection date later | 97 |
| Left the register | 41 |
| Connection date earlier | 29 |
| Status, stage or gate changed | 21 |
| Capacity changed | 14 |
| Back on the register | 5 |
| Connection date added or removed | 5 |
Capacity in and out
TEC file dated 20 Dec 2024 against 27 Sep 2024 (archived copy)
Not in the chart: 1.89 GW across 5 projects back on the register, absent from the archived copy dated 27 Sep 2024 (Internet Archive) and printed again in the file dated 20 Dec 2024. See them
Table view
| Step | MW |
|---|---|
| New | +41,291.1 |
| Capacity up | +2,546 |
| Capacity down | −1,435.3 |
| Removed | −20,183.7 |
| Net | 22,218.1 |
| Back on the register (not in the net) | 1,889.5 |
Biggest date moves
The days are calculated by N84 from the two printed dates. The register does not say why a date moved.
Data centres in the pipeline
Researched by N84 from planning records and operator statements, each with its sources and a confidence grade (3 at confidence A, 2 at confidence B, 19 at confidence C, 6 at confidence D). The TEC Register has no data-centre category, so these are not counted from it.
Get Queue movers by email
Free. One email when a new NESO TEC Register edition prints a change for a project or connection site you name.
Every change, in full
| Project | Connection site | What the files print |
|---|---|---|
| New on the register 109 | ||
| Finlarig PRO-000079-1, SSE GENERATION LIMITED | Finlarig GSP Hydro | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 16.5 MW in the file dated 20 Dec 2024 |
| Finlarig PRO-000079-2, SSE GENERATION LIMITED | Finlarig GSP Hydro | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 35 MW in the file dated 20 Dec 2024 |
| Red John PSH PRO-000570-1, STATKRAFT HIGHLANDS PSH LIMITED | Red John 275kV Switching Station Pump Storage | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 450 MW in the file dated 20 Dec 2024 |
| Red John PSH PRO-000570-2, STATKRAFT HIGHLANDS PSH LIMITED | Red John 275kV Switching Station Pump Storage | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 550 MW in the file dated 20 Dec 2024 |
| Dogger Bank South East PRO-001375-1, RWE RENEWABLES UK LIMITED | RWE North Sea Offshore Substation Wind Offshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Dogger Bank South East PRO-001375-2, RWE RENEWABLES UK LIMITED | RWE North Sea Offshore Substation Wind Offshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,450 MW in the file dated 20 Dec 2024 |
| Dogger Bank South West PRO-001386-1, RWE RENEWABLES UK LIMITED | Wylfa 400kV Substation Wind Offshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Dogger Bank South West PRO-001386-2, RWE RENEWABLES UK LIMITED | Wylfa 400kV Substation Wind Offshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,450 MW in the file dated 20 Dec 2024 |
| Capenhurst Tertiary PRO-002162-1, ENSO GREEN HOLDINGS LIMITED | Capenhurst 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Dec 2024 |
| Capenhurst Tertiary PRO-002162-2, ENSO GREEN HOLDINGS LIMITED | Capenhurst 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 57 MW in the file dated 20 Dec 2024 |
| Biggleswade PV PRO-002226, CSE38 LIMITED | Biggleswade 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Dec 2024 |
| Elmya Dunbar BESS PRO-002290, ELMYA ENERGY UK 1 LIMITED | Hunterston 400/132kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Craigend PRO-002567, Renewable Energy Systems Limited | Arbroath GSP PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 49.9 MW in the file dated 20 Dec 2024 |
| Philiphaugh Wind Farm PRO-002708, EDF ENERGY RENEWABLES LIMITED | Philipaugh Substation Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 175 MW in the file dated 20 Dec 2024 |
| AGS Calderside Battery Energy Storage System PRO-002752-1, Advance Grid Solutions Limited | Calderside 275kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024 |
| AGS Calderside Battery Energy Storage System PRO-002752-2, Advance Grid Solutions Limited | Calderside 275kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Nether Pitforthie BESS PRO-003226, OPDE UK LIMITED | Fiddes GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024 |
| AULTCRAGGIE BESS PRO-003228, OPDE UK LIMITED | Brora GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024 |
| Newton of Park BESS 2 PRO-003562, OPDE UK LIMITED | Nairn GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024 |
| Crathorne Estate BESS and Solar Farm PRO-003831, Exagen Development Limited | Lackenby 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 600 MW in the file dated 20 Dec 2024 |
| Brechfa Dau Wind Farm PRO-003847, WELSH GOVERNMENT | Proposed Ferryside GSP Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 110.8 MW in the file dated 20 Dec 2024 |
| Beinn an Tuirc 1 PRO-003918, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Carradale 1 GSP Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 95.2 MW in the file dated 20 Dec 2024 |
| KELL440MW BESS PRO-003956, SMS ENERGY SERVICES LIMITED | Kellingley IDNO GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 440 MW in the file dated 20 Dec 2024 |
| 014 NEP Bransholme PRO-004043, NEW ENERGY PARTNERSHIP LIMITED | North Humber Connection Node C 132kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 40 MW in the file dated 20 Dec 2024 |
| Beinn Ghlas PRO-004073, HEADWIND DEVELOPMENT SERVICES LIMITED | Taynuilt GSP Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 57.6 MW in the file dated 20 Dec 2024 |
| Cottam-Ryhall Solar & BESS PRO-004100, TYLER HILL RENEWABLES LIMITED | Trent Valley South Connection Node B 400kV Substation. Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Balrobert Farm BESS PRO-004118, ELGIN ENERGY ES CO LIMITED | Knocknagael 132kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 150 MW in the file dated 20 Dec 2024 |
| Middleton farm BESS PRO-004120, Bluestone Energy Ltd | Neilston 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 937 MW in the file dated 20 Dec 2024 |
| Natpower Enderby - Patford Bridge Green Energy Park PRO-004132, NP SPV33 LIMITED | Patford Bridge 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,799 MW in the file dated 20 Dec 2024 |
| Project Invicta PRO-004133, The Farm Energy Company Limited | East Kent Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 340 MW in the file dated 20 Dec 2024 |
| Galileo 05 PRO-004173, Galileo Empower UK Limited | Lynemore Windfarm 132kV Substation Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 84 MW in the file dated 20 Dec 2024 |
| Meall Buidhe Wind Farm PRO-004198, MUIRDEN ENERGY LLP | Shin GSP Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 40 MW in the file dated 20 Dec 2024 |
| Minnygryle Burn Energy Park PRO-004204, Wind 2 Project 6 Limited | Glenlee 132/11kV Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 84 MW in the file dated 20 Dec 2024 |
| Lagrae Battery Storage PRO-004214, LAGRAE BATTERY STORAGE LIMITED | Glenmuckloch 132kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Bridgwater Energy Park PRO-004215, EXAGEN GROUP LIMITED | Bridgwater GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 249.99 MW in the file dated 20 Dec 2024 |
| AGS Nerston BESS PRO-004216, Advance Grid Solutions Limited | East Kilbride B 275/33kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 50 MW in the file dated 20 Dec 2024 |
| AGS Nerston 2 BESS PRO-004226, Advance Grid Solutions Limited | East Kilbride B 275/33kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 55 MW in the file dated 20 Dec 2024 |
| AGS Nerston 3 BESS PRO-004227, Advance Grid Solutions Limited | East Kilbride B 275/33kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 55 MW in the file dated 20 Dec 2024 |
| GF SELLINDGE BESS PRO-004228, GF Sellindge Energy Ltd | East Kent connection node A 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024 |
| Boreland BESS PRO-004259, BORELAND ENERGY LTD | Killin GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 43 MW in the file dated 20 Dec 2024 |
| Manor Farm PRO-004269, QAIR RENEWABLES UK LIMITED | South Anglia Connection Node E 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Sutton Courtenay PRO-004276, TBC PARTNERS LIMITED | Didcot 132kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 150 MW in the file dated 20 Dec 2024 |
| Barrow PRO-004297, NEW ENERGY PARTNERSHIP LIMITED | Harker 132kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 30 MW in the file dated 20 Dec 2024 |
| Strathaven BESS PRO-004298, IGP ENERGY STORAGE 2 LIMITED | Strathaven 400/275kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024 |
| Foel Fach Wind Farm PRO-004327, FOEL FACH WIND FARM LIMITED | North Wales connection Node A 400kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 79.2 MW in the file dated 20 Dec 2024 |
| Cerulean Winds INTOG 1 PRO-004330, CERULEAN WINDS LIMITED | Peterhead 400kV Substation Demand;Wind Offshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 600 MW in the file dated 20 Dec 2024 |
| NatPower Kinoulton Green Energy Park PRO-004333, NP SPV32 LIMITED | Grendon 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,330 MW in the file dated 20 Dec 2024 |
| Lambeeth 240MW PRO-004361, ECODEV GROUP LTD | Pembroke 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| NatPower Yaxley Green Energy Park PRO-004371, NP SPV 40 LIMITED | North Anglia Connection Node C 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| NatPower Allington Green Energy Park PRO-004387, NP SPV35 LIMITED | Cottam 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| Elmya Morningside BESS & PV PRO-004396, ELMYA RPC UK MORNINGSIDE LIMITED | Elmya Morningside 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Bearsden BESS PRO-004404-1, BEARSDEN BESS LTD | Windyhill 275/132kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 100 MW in the file dated 20 Dec 2024 |
| Bearsden BESS PRO-004404-2, BEARSDEN BESS LTD | Windyhill 275/132kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Elmya Bathgate BESS PRO-004416, RPC ELMYA CARNATION DEVCO LIMITED | Armadale 400kv Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024 |
| NatPower Gwyddelwern Green Energy Park PRO-004432, NP SPV31 Limited | North Wales connection Node A 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| Butlers Wood PV & BESS Station PRO-004467, IB VOGT UK LTD | South Anglia Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Biggleswade High Impact Green Energy Hub PRO-004477, TELIS ENERGY UK LIMITED | Biggleswade 400kV Substation Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| Mybster 2 Battery Storage PRO-004479, POTENCIA ENERGY LIMITED | Mybster 3 132/33kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Redhall BESS PRO-004487, ANESCO LIMITED | Wearside Connection Node D 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 300 MW in the file dated 20 Dec 2024 |
| Devonhill PRO-004492, CBS ENERGY STORAGE ASSETS UK LIMITED | Strathaven 400/275kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Greta IV (b) PRO-004499, Greta IV Limited | North Anglia Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Greta IV (c) PRO-004500, Greta IV Limited | North Anglia Connection Node B 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Greta IV (d) PRO-004501, Greta IV Limited | North Anglia Connection Node B 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Huntingdon High Impact Energy Hub 1 PRO-004507, TELIS ENERGY UK LIMITED | West Anglia Connection Node H 400kVSubstation Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| EPL Hampshire PRO-004533, EPL NEWCO7 LIMITED | Nursling 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 480 MW in the file dated 20 Dec 2024 |
| Drinkstone Hybrid PRO-004534, BUCCLEUCH ESTATES LTD (THE) | Hawick 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 55 MW in the file dated 20 Dec 2024 |
| Oak Holt Solar PRO-004539, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED | Trent Vally North Connection Node C 400kv Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Enderby Solar & BESS PRO-004540, GREENTECH PROJECTS HOLDING UK LIMITED | Enderby 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Bernicia Energy Park PRO-004541, BAYWA R.E. UK LIMITED | Stella West 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 350 MW in the file dated 20 Dec 2024 |
| Kinoulton Solar & BESS PRO-004560, GREENTECH PROJECTS HOLDING UK LIMITED | Stoke Bardolph 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| NatPower Tilbury Green Energy Park PRO-004562, NATPOWER MARINE UK LIMITED | South Anglia Connection Node C 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| NatPower Immingham Green Energy Park PRO-004566, NATPOWER MARINE UK LIMITED | Trent Valley North Connection Node F 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| Noventum -New Marton PRO-004634, NOVENTUM POWER SOLAR 11 LIMITED | Cheshire Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 510 MW in the file dated 20 Dec 2024 |
| Noventum- Bridgwater PRO-004650, NOVENTUM POWER SOLAR 13 LIMITED | Woolavington 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 380 MW in the file dated 20 Dec 2024 |
| Noventum - Budby PRO-004652, NOVENTUM POWER SOLAR 15 LIMITED | Trent Valley South Connection Node D 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 380 MW in the file dated 20 Dec 2024 |
| Manquhill Wind Farm PRO-004662, ENERGYFARM UK MANQUHILL LTD | Manquhill Wind Farm 132/33kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 56 MW in the file dated 20 Dec 2024 |
| Divot Hill Wind Farm PRO-004664, ENERGYFARM DIVOT HILL LTD | Divot Hill 132/33 kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 63 MW in the file dated 20 Dec 2024 |
| BlackDyke BESS PRO-004671, ANESCO LIMITED | Leeds North Connection Node D 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 250 MW in the file dated 20 Dec 2024 |
| Calderdale Wind Farm 312MW PRO-004714, CALDERDALE WIND FARM LTD | Calderdale Wind Farm 275kV Substation Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 312 MW in the file dated 20 Dec 2024 |
| Perry Barr BESS PRO-004745, Perry Barr Limited | Nechells East GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 249 MW in the file dated 20 Dec 2024 |
| Dounreay BESS PRO-004749, FIELD DEVCO LTD | New Dounreay 400kV substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024 |
| Netherton Hub Bess PRO-004753, FIELD DEVCO LTD | Netherton 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024 |
| Field Glenniston BESS PRO-004754, FIELD DEVCO LTD | Glenniston GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024 |
| Broadford BESS PRO-004756, FIELD DEVCO LTD | Broadford GSP Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024 |
| New Deer 2 BESS PRO-004758, FIELD DEVCO LTD | New Deer 2 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024 |
| Clashindarroch windfarm extension PRO-004769, CLASHINDARROCH WINDFARM EXTENSION LIMITED | Clashindarroch Windfarm Extension 132kV Substation Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 145.2 MW in the file dated 20 Dec 2024 |
| Balinoe Wind Farm PRO-004776, RWE RENEWABLES UK ONSHORE WIND LIMITED | A'Chruach Wind Farm 275kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 160.6 MW in the file dated 20 Dec 2024 |
| NatPower Connah Quay Green Energy Park PRO-004797, NP SPV24 LIMITED | Connah's Quay 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Chesters PRO-004805, Queequeg Renewables Ltd | Teviot 400/132kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 80 MW in the file dated 20 Dec 2024 |
| NatPower Llanteg Green Energy Park PRO-004806, NP SPV30 LIMITED | Llanteg 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 47.5 MW in the file dated 20 Dec 2024 |
| Lightsource Patford Bridge PRO-004807, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Derbyshire Connection Node I 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Lightsource Offerton PRO-004808, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Wearside Connection Node B 2 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Elmya Towcester BESS PRO-004809, RPC ELMYA CARNATION DEVCO LIMITED | Derbyshire Connection Node I 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 550 MW in the file dated 20 Dec 2024 |
| Lightsource Middleton PRO-004817, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Middleton 400KV Substation Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| NatPower Hawthorn Pit Green Energy Park PRO-004820, NP SPV 29 LIMITED | Hawthorn Pit 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,000 MW in the file dated 20 Dec 2024 |
| Lightsource Willington PRO-004824, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Willington 400kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Lightsource Folly Farm PRO-004825, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Severn Connection Node A 400kv Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Lightsourcebp Wakeleys Wind and BESS PRO-004827, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Wakeleys 400kV Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Lightsource Bagots Farm PRO-004829, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Drakelow 400kV Substation Energy Storage System;Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| Long Stratton BESS PRO-004850, FIELD DEVCO LTD | North Anglia Connection Node A 400kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Lightsourcebp Amlwch BESS and Hydrogen PRO-004856, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Wylfa South 400kV Substation Demand;Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 600 MW in the file dated 20 Dec 2024 |
| Lightsource Berthlwyd PRO-004858, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Mid Wales Connection Node A Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 240 MW in the file dated 20 Dec 2024 |
| NatPower Kintore2 Green Energy Park PRO-004860, NP SPV 41 LIMITED | Kintore 275kV Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 500 MW in the file dated 20 Dec 2024 |
| Long Stratton 400 PRO-004868, ENSO GREEN HOLDINGS X LIMITED | North Anglia Connection Node A 400kV Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 400 MW in the file dated 20 Dec 2024 |
| Offerton 200MW BESS PRO-004910, Decerna Limited | Offerton 275kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 200 MW in the file dated 20 Dec 2024 |
| Elmya Foxdale BESS PRO-004934, RPC ELMYA CARNATION DEVCO LIMITED | Trent Valley South Connection Node C 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 800 MW in the file dated 20 Dec 2024 |
| Forsa Energy Denny BESS PRO-004971, FORSA ENERGY GAS HOLDINGS LIMITED | FORSA ENERGY DENNY BESS 132KV GRID SUPPLY POINT SUBSTATION Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 99.9 MW in the file dated 20 Dec 2024 |
| NatPower Navenby Energy Park PRO-005006, NAVENBY ENERGY LIMITED | Navenby 400kV Substation Energy Storage System | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 1,030 MW in the file dated 20 Dec 2024 |
| Waltham Cross PV & BESS Sub PRO-005801, EPPING ENERGY PARK LIMITED | Waltham Cross B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Not in the file dated 27 Sep 2024 or any earlier file N84 holds; printed with 249.9 MW in the file dated 20 Dec 2024 |
| Back on the register 5 | ||
| Elstree (tertiary) PRO-000400, ELSTREE GREEN LIMITED | Elstree 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 27 Sep 2024 (archived copy); printed again with 57 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024 |
| Rayleigh 2 Tertiary PRO-000466, ENSO GREEN HOLDINGS LIMITED | Rayleigh Main 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 27 Sep 2024 (archived copy); printed again with 47.5 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024 |
| Seagreen 1 Offshore Wind Farm PRO-000527, Seagreen Wind Energy Limited | Tealing 275/33kV Substation Wind Offshore | Absent from the file dated 27 Sep 2024 (archived copy); printed again with 1,075 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024 |
| West Burton PRO-001323, ENSO GREEN HOLDINGS A LIMITED | West Burton 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 27 Sep 2024 (archived copy); printed again with 120 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024 |
| Ratcliffe-on-Soar II PRO-002158, ENSO GREEN HOLDINGS LIMITED | Ratcliffe-On-Soar 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Absent from the file dated 27 Sep 2024 (archived copy); printed again with 590 MW in the file dated 20 Dec 2024. Last printed before that in the file dated 31 May 2024 |
| Removed from the register 41 | ||
| Finlarig PRO-000079, SSE GENERATION LIMITED | Finlarig GSP Hydro | Printed with 16.5 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Drax (Coal) PRO-000130, DRAX POWER LIMITED | Drax 400kV Substation Coal | Printed with 2,001 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Elstree (tertiary) PRO-000400-1, ELSTREE GREEN LIMITED | Elstree 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Elstree (tertiary) PRO-000400-2, ELSTREE GREEN LIMITED | Elstree 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 57 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Rayleigh 2 Tertiary PRO-000466-1, ENSO GREEN HOLDINGS LIMITED | Rayleigh Main 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Rayleigh 2 Tertiary PRO-000466-2, ENSO GREEN HOLDINGS LIMITED | Rayleigh Main 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 57 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Seagreen 1 Offshore Wind Farm PRO-000527-1, Seagreen Wind Energy Limited | Tealing 275/33kV Substation Wind Offshore | Printed with 10 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Seagreen 1 Offshore Wind Farm PRO-000527-2, Seagreen Wind Energy Limited | Tealing 275/33kV Substation Wind Offshore | Printed with 600 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Seagreen 1 Offshore Wind Farm PRO-000527-3, Seagreen Wind Energy Limited | Tealing 275/33kV Substation Wind Offshore | Printed with 1,075 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Capenhurst PRO-000540-1, ENSO GREEN HOLDINGS LIMITED | Capenhurst 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 449.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Capenhurst PRO-000540-2, ENSO GREEN HOLDINGS LIMITED | Capenhurst 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 457 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| CPG Power PRO-000542, ESB ASSET DEVELOPMENT UK LIMITED | Carrington 400KV Substation Gas Reciprocating | Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Red John PSH PRO-000570, STATKRAFT HIGHLANDS PSH LIMITED | Red John 275kV Switching Station Pump Storage | Printed with 450 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| West Burton PRO-001323-1, ENSO GREEN HOLDINGS A LIMITED | West Burton 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 49.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| West Burton PRO-001323-2, ENSO GREEN HOLDINGS A LIMITED | West Burton 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 99.8 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| West Burton PRO-001323-3, ENSO GREEN HOLDINGS A LIMITED | West Burton 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 120 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| North Sea PRO-001375, RWE RENEWABLES UK LIMITED | RWE North Sea Offshore Substation Wind Offshore | Printed with 1,500 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Dogger Bank South West (was Irish Sea) PRO-001386, RWE RENEWABLES UK LIMITED | Wylfa 400kV Substation Wind Offshore | Printed with 1,500 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| One Planet Solar Farm PRO-001505, ONE PLANET SOLAR FARM LIMITED | Eaton Socon 400kV Substation PV Array (Photo Voltaic/solar) | Printed with 500 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Celtic Sea Offshore Wind Farm PRO-001763-1, CELTIC SEA OFFSHORE WIND FARM LIMITED | Alverdiscott 400kV Substation Wind Offshore | Printed with 400 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Celtic Sea Offshore Wind Farm PRO-001763-2, CELTIC SEA OFFSHORE WIND FARM LIMITED | Alverdiscott 400kV Substation Wind Offshore | Printed with 1,400 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Ratcliffe-on-Soar II PRO-002158-1, ENSO GREEN HOLDINGS LIMITED | Ratcliffe-On-Soar 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 200 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Ratcliffe-on-Soar II PRO-002158-2, ENSO GREEN HOLDINGS LIMITED | Ratcliffe-On-Soar 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 300 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Ratcliffe-on-Soar II PRO-002158-3, ENSO GREEN HOLDINGS LIMITED | Ratcliffe-On-Soar 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 400 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| CS4 PRO-002239, FRED OLSEN SEAWIND LIMITED | Alverdiscott 400kV Substation Wind Offshore | Printed with 1,000 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Paxton Dal Energy Park PRO-002476, Renewable Energy Systems Limited | Paxton Dal Energy Park 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 600 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Red Hill Energy Park PRO-002482, Renewable Energy Systems Limited | Monk Fryston 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 800 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Tamar-Richborough PRO-002560, TI PROJECTCO 2 LIMITED | Richborough 400kV Substation Reactive Compensation | Printed with 0 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Ridham Battery Storage PRO-002565, CAMBRIDGE POWER LIMITED | Kemsley 400kV Substation Energy Storage System | Printed with 350 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Tamar-Hartmoor PRO-002570, TI PROJECTCO 3 LIMITED | Hartmoor 275kV Substation Reactive Compensation | Printed with 0 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Tamar-Landulph PRO-002581, TI PROJECTCO 1 LIMITED | Landulph 400kV Substation Reactive Compensation | Printed with 0 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Ratcliffe-On-Soar PV & BESS PRO-002622, O&G Solar (SPV 49) Limited | Kegworth B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 249.9 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| AGS Calderside Battery Energy Storage System PRO-002752, Advance Grid Solutions Limited | Calderside 275kV Substation Energy Storage System | Printed with 300 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Orsted Celtic Sea (OCS01) PRO-003100, ORSTED POWER (UK) LIMITED | Alverdiscott 400kV Substation Wind Offshore | Printed with 1,350 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Orsted Celtic Sea 2 (OCS02) PRO-003101, ORSTED POWER (UK) LIMITED | Alverdiscott 400kV Substation Wind Offshore | Printed with 1,350 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| CS14 PRO-003548, FRED OLSEN SEAWIND LIMITED | Alverdiscott 400kV Substation Wind Offshore | Printed with 1,000 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Grain Energy PRO-003771, SECTION 31 SOLUTIONS LTD | Grain West 400kV Substation Energy Storage System | Printed with 249 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Lerwick Hydrogen PRO-003965, STATKRAFT HYDROGEN UK HOLDING LIMITED | Gremista GSP Energy Storage System | Printed with 2 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| East Quantoxhead PV & BESS Station PRO-004184, IB VOGT UK LTD | West Country Connection Node D 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 240 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Bearsden BESS PRO-004404, BEARSDEN BESS LTD | Windyhill 275/132kV Energy Storage System | Printed with 100 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Glebe Energy Park PRO-004619, Renewable Energy Systems Limited | Yaxley 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Printed with 800 MW in the file dated 27 Sep 2024; not in the file dated 20 Dec 2024 |
| Connection date later 97 | ||
| Low Carbon Energy Centre BESS Joyce Green Lane PRO-003540, NET ZERO MARINE SERVICES LIMITED | Littlebrook 132kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2027 to 31 Oct 2037 (+3,654 days) |
| Bellbroughton Energy Park PRO-002826, ELGIN ENERGY ES CO LIMITED | Warwickshire Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2027 to 30 Oct 2037 (+3,653 days) |
| Dunclent Battery Storage PRO-002827, Firma Vogt Solar Ltd | Warwickshire Connection Node A 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2030 to 30 Oct 2037 (+2,556 days) |
| Machair Offshore Wind Farm PRO-001392, SCOTTISHPOWER RENEWABLES (UK) LIMITED | Machair 275/66kV Offshore Substation Wind Offshore | MW Effective From moved from 30 Apr 2028 to 16 Sep 2033 (+1,965 days) |
| Partridge Farm BESS PRO-003445, Apatura Battery Ltd | Sellindge 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 31 Oct 2037 (+1,461 days) |
| Rugeley Battery Storage PRO-002215, RUGELEY POWER GENERATION LIMITED | Rugeley 400kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2033 to 30 Oct 2037 (+1,461 days) |
| Bushbury PRO-003409, Bushbury 10 Renewables Limited | Staffordshire Connection Node A 400kV Substation Demand;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 30 Oct 2037 (+1,460 days) |
| Graeme Road Solar & BESS PRO-004375, GREENTECH PROJECTS HOLDING UK LIMITED | Ryhall 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 30 Oct 2038 (+1,460 days) |
| North Killingholme Power Project PRO-001038, C.GEN KILLINGHOLME LIMITED | Killingholme 400kV Substation CCGT (Combined Cycle Gas Turbine) | MW Effective From moved from 31 Oct 2026 to 30 Sep 2030 (+1,430 days) |
| Grangemouth Hybrid BESS & Solar PV PRO-003254, TAGENERGY DEVELOPMENT UK LIMITED | Grangemouth 275/33kV Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2028 to 30 Jun 2032 (+1,338 days) |
| Edinbane Windfarm PRO-000135-2, VATTENFALL WIND POWER LTD | Edinbane 132/33kV Substation Energy Storage System;Wind Onshore | MW Effective From moved from 1 Jan 2030 to 30 Apr 2033 (+1,215 days) |
| Enderby Tertiary PRO-000430, CLUMP FARM SOLAR LIMITED | Enderby 400kV Substation PV Array (Photo Voltaic/solar) | MW Effective From moved from 1 May 2024 to 1 Aug 2027 (+1,187 days) |
| Lochgoin Solar Farm PRO-001107, TURBINE MARKETING SPV LIMITED | Whitelee Extension 275/33kV PV Array (Photo Voltaic/solar) | MW Effective From moved from 1 Aug 2024 to 29 Sep 2027 (+1,154 days) |
| Drakelow PRO-000428, ENSO Green Holdings V Limited | Drakelow 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2024 to 1 Dec 2027 (+1,126 days) |
| Cold Norton PRO-003528, BSR APPLICATIONS LIMITED | South Anglia Connection Node C 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | MW Effective From moved from 31 Oct 2033 to 31 Oct 2036 (+1,096 days) |
| Coryton PRO-003407, Coryton 10 Renewables Limited | Coryton South 400kV Substation Demand;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2031 to 31 Oct 2034 (+1,096 days) |
| Lightsource Enderby PV+BESS PRO-003854, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Derbyshire Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2034 to 31 Oct 2037 (+1,096 days) |
| Sunnica PRO-000393, SUNNICA LIMITED | Burwell 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2027 to 31 Oct 2030 (+1,096 days) |
| Wymondley BESS Limited PRO-003496, AGR RENEWABLES LIMITED | Wymondley 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2031 to 31 Oct 2034 (+1,096 days) |
| Springfield Solar and Battery PRO-002664, VOLTALIA UK LTD | Branxton 400/132kV Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2028 to 31 Oct 2031 (+1,095 days) |
| Walpole 2 (tertiary) PRO-000505, ENSO GREEN HOLDINGS R LIMITED | Walpole 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2024 to 31 Oct 2027 (+1,095 days) |
| Loch Fearna Pumped Storage PRO-002569, FEARNA PSH LIMITED | Loch Fearna Pumped Storage 132/18kV Pump Storage | MW Effective From moved from 31 Oct 2029 to 28 Oct 2032 (+1,093 days) |
| Gammidge PV & BESS Park PRO-001649, CS UK HOLDINGS III LIMITED | Grendon 132kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2024 to 15 Oct 2027 (+1,079 days) |
| Capenhurst PRO-000540, ENSO GREEN HOLDINGS LIMITED | Capenhurst 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2030 to 30 Sep 2033 (+1,065 days) |
| Bramley (tertiary) PRO-000396, BRAMLEY SOLAR LIMITED | Bramley Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2023 to 15 Aug 2026 (+1,019 days) |
| Valorous Offshore Wind Farm PRO-001383, BLUE GEM WIND LIMITED | Pembroke 400kV Substation Wind Offshore | MW Effective From moved from 2 Apr 2029 to 31 Oct 2031 (+942 days) |
| Quantans Hill Wind Farm PRO-001247, VATTENFALL WIND POWER LTD | Quantans Hill 132kV Substation Wind Onshore | MW Effective From moved from 30 Apr 2027 to 2 Jul 2029 (+794 days) |
| Scoop Hill Wind Farm PRO-000327, CWP Energy Limited | Scoop Hill Wind Farm 132kV Substation Wind Onshore | MW Effective From moved from 28 Aug 2025 to 31 Oct 2027 (+794 days) |
| Whitelaw Brae Windfarm PRO-000341, WHITELAW BRAE WINDFARM LIMITED | Whitelaw Brae 'A' and 'B' 33kV Substations Wind Onshore | MW Effective From moved from 28 Jun 2024 to 31 Jul 2026 (+763 days) |
| Cellarhead 400kV Energy Storage PRO-001685, C & S ENERGY LIMITED | Cellarhead 400kV Substation Energy Storage System | MW Effective From moved from 30 May 2024 to 30 Jun 2026 (+761 days) |
| BOOM Power Llanbabo Generation PRO-001540, Carrog Storage Facility Limited | Wylfa 400kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2026 to 31 Oct 2028 (+732 days) |
| Enoch Hill PRO-000152, RWE RENEWABLES UK ONSHORE WIND LIMITED | Enoch Hill 132/33kV Substation Wind Onshore | MW Effective From moved from 30 May 2023 to 30 May 2025 (+731 days) |
| Swansea PRO-002086, ENSO GREEN HOLDINGS LIMITED | Swansea North 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2030 to 31 Oct 2032 (+731 days) |
| Little Harrowden PRO-003416, Little Harrowden 10 Renewables Limited | West Anglia Connection Node F 400kV Substation Demand;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2032 to 31 Oct 2034 (+730 days) |
| Park Farm Hybrid Solar and BESS PRO-003850, VOLTALIA UK LTD | Patford Bridge 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2035 to 30 Oct 2037 (+730 days) |
| Apley Head Farm PRO-003968, Queequeg Renewables Ltd | Trent Valley South Connection Node B 400kV Substation. Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| Lynefield BESS PRO-003555, WINDEL GRID 1 LIMITED | Borders Connection Node A 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| Spennymoor Greener Grid Park PRO-002041-2, STATKRAFT UK LTD | Spennymoor 400kV Substation Energy Storage System;Reactive Compensation | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| Spennymoor PV & BESS Sub PRO-003049, O&G Solar (SPV 20) Limited | Spennymoor 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 30 Oct 2035 (+729 days) |
| Exeter Main PRO-002082, ENSO GREEN HOLDINGS LIMITED | Exeter 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 24 Nov 2031 to 28 Oct 2033 (+704 days) |
| Windy Standard III Wind Farm PRO-000359-1, Windy Standard III Ltd | Dun Hill 132/33kV Wind Onshore | MW Effective From moved from 30 Jun 2024 to 1 Jun 2026 (+701 days) |
| Windy Standard III Wind Farm PRO-000359-2, Windy Standard III Ltd | Dun Hill 132/33kV Wind Onshore | MW Effective From moved from 30 Jun 2024 to 1 Jun 2026 (+701 days) |
| Kirkby (Tertiary) PRO-001083, PIVOTED POWER LLP | Kirkby GSP (ENW) Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2025 to 30 Aug 2027 (+668 days) |
| Mossy Hill Wind Farm PRO-000461, MOSSY HILL SHETLAND LIMITED | Mossy Hill 132kV Substation Demand;Wind Onshore | MW Effective From moved from 1 Apr 2027 to 30 Nov 2028 (+609 days) |
| Hornsea Power Station 4 PRO-000435-1, ORSTED HORNSEA PROJECT FOUR LIMITED | Creyke Beck 400kV Substation Wind Offshore | MW Effective From moved from 1 Apr 2027 to 30 Oct 2028 (+578 days) |
| Bowsheil Solar and Battery PRO-002662, VOLTALIA UK LTD | Bowsheils 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 2 May 2030 to 31 Oct 2031 (+547 days) |
| Ayrshire Grid Services Facility PRO-001090, FLEXIBLEGRIDPOWER LTD | Hunterston East 400kV substation Reactive Compensation | MW Effective From moved from 29 Mar 2024 to 3 Sep 2025 (+523 days) |
| Elchies Wind Farm PRO-000151-1, ELCHIES WIND LIMITED | Elchies 132/33kV Substation Wind Onshore | MW Effective From moved from 30 Jun 2027 to 30 Nov 2028 (+519 days) |
| Bicker Fen PV & BESS Sub PRO-002575, O&G Solar (SPV 40) Limited | Bicker Fen 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 May 2033 to 30 Oct 2034 (+518 days) |
| Burwell BESS PRO-003869, O&G Solar (SPV 38) Limited | Burwell Main 400kV Substation Energy Storage System | MW Effective From moved from 30 Jun 2033 to 30 Oct 2034 (+487 days) |
| Enderby (Akira) PRO-000426, ENDERBY BATTERY STORAGE LIMITED | Enderby 400kV Substation Energy Storage System | MW Effective From moved from 31 Aug 2023 to 9 Dec 2024 (+466 days) |
| Glenmuckloch Pumped Storage PRO-000299, GLENMUCKLOCH PUMPED STORAGE HYDRO LIMITED | Glenmuckloch 132/33kV Pump Storage | MW Effective From moved from 30 Jun 2027 to 1 Oct 2028 (+459 days) |
| Creachan Wind Farm PRO-003906, RWE RENEWABLES UK ONSHORE WIND LIMITED | Creachan Wind Farm 132/33kV Substation Wind Onshore | MW Effective From moved from 30 Jul 2029 to 31 Oct 2030 (+458 days) |
| Net Zero Teesside Power Project PRO-001400, NET ZERO TEESSIDE POWER LIMITED | Tod Point 275kV Substation CCGT (Combined Cycle Gas Turbine);Demand | MW Effective From moved from 30 Apr 2026 to 30 Jul 2027 (+456 days) |
| Inch Cape Offshore Wind Farm Platform 1 PRO-000348, INCH CAPE OFFSHORE LIMITED | Cockenzie 400/275kV Wind Offshore | MW Effective From moved from 1 Apr 2025 to 21 Jun 2026 (+446 days) |
| Inch Cape Offshore Wind Farm Platform 2 PRO-000349, INCH CAPE OFFSHORE LIMITED | Cockenzie 400/275kV Wind Offshore | MW Effective From moved from 1 Apr 2025 to 21 Jun 2026 (+446 days) |
| South Kyle 2 Wind farm PRO-001963, VATTENFALL WIND POWER LTD | South Kyle 2 132/33kV Substation Energy Storage System;Wind Onshore | MW Effective From moved from 25 May 2029 to 31 Jul 2030 (+432 days) |
| Ouse Energy Storage PRO-001861, Ouse Energy Limited | Kemsley 400kV Substation Energy Storage System | MW Effective From moved from 24 Aug 2026 to 27 Oct 2027 (+429 days) |
| Pembroke BESS PRO-000337, RWE GENERATION UK PLC | Pembroke 400kV Substation Energy Storage System | MW Effective From moved from 1 Oct 2026 to 29 Oct 2027 (+393 days) |
| WindyHill Energy Storage Facility PRO-001696, ENERGYGRIDPOWER LTD | Windyhill 275/132kV Energy Storage System | MW Effective From moved from 30 Jul 2024 to 27 Aug 2025 (+393 days) |
| Elmya Hunterston PRO-003182, ELMYA RPC UK HUNTERSTON LIMITED | Hunterston 400/132kV Energy Storage System | MW Effective From moved from 9 Oct 2029 to 25 Oct 2030 (+381 days) |
| Gartclash Farm BESS PRO-003736, BOOM DEVELOPMENTS LTD | Denny North 275/132kV Energy Storage System | MW Effective From moved from 29 Oct 2027 to 30 Oct 2028 (+367 days) |
| Aberarder Wind Farm PRO-000368, ABERARDER WIND FARM LLP | Aberarder Wind Farm 132/33kV Substation Wind Onshore | MW Effective From moved from 30 Aug 2025 to 31 Aug 2026 (+366 days) |
| Cloich Forest Wind Farm PRO-001387, EDF ENERGY RENEWABLES LIMITED | Cloiche 132kV Substation Wind Onshore | MW Effective From moved from 30 Jul 2028 to 31 Jul 2029 (+366 days) |
| Hare Craig Wind Farm PRO-000940, ENERGYFARM UK HARE CRAIG LLP | Hare Craig 33kV Substation Wind Onshore | MW Effective From moved from 31 Oct 2027 to 31 Oct 2028 (+366 days) |
| Heckington Fen Solar Park PRO-001903, ECOTRICITY GENERATION LIMITED | Bicker Fen 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 1 Oct 2027 to 1 Oct 2028 (+366 days) |
| Kirkton Wind Farm PRO-001811, Kirkton Wind Farm Ltd | Connagill 275kV Substation Wind Onshore | MW Effective From moved from 31 Oct 2027 to 31 Oct 2028 (+366 days) |
| Lightsource Grendon PV+BESS PRO-003742, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | West Anglia Connection Node C 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2033 to 31 Oct 2034 (+366 days) |
| Walsoken Battery PRO-002690, Walsoken Limited | North Anglia Connection Node D 132kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2033 to 31 Oct 2034 (+366 days) |
| Craig Watch Wind Farm PRO-001877, Craig Watch Wind Farm Limited | Craig Watch Substation Wind Onshore | MW Effective From moved from 30 Jun 2028 to 30 Jun 2029 (+365 days) |
| Fallago Rig 2 PRO-000526, EDF ENERGY RENEWABLES LIMITED | Fallago 400/33kV Wind Onshore | MW Effective From moved from 30 Apr 2028 to 30 Apr 2029 (+365 days) |
| Gresham House Kincardine BESS PRO-002368, FLAVUSIA LTD | Kincardine 275kV Energy Storage System | MW Effective From moved from 31 Oct 2028 to 31 Oct 2029 (+365 days) |
| Hornsea Power Station 4 PRO-000435-2, ORSTED HORNSEA PROJECT FOUR LIMITED | Creyke Beck 400kV Substation Wind Offshore | MW Effective From moved from 31 Oct 2028 to 31 Oct 2029 (+365 days) |
| Keith 132 Greener Grid Park PRO-001129-2, KEITH STORAGE SOLUTIONS LIMITED | Keith 1 132/33kV GSP Substation Energy Storage System;Reactive Compensation | MW Effective From moved from 31 May 2024 to 31 May 2025 (+365 days) |
| Knockcronal Wind Farm PRO-001801, Knockcronal Wind Farm Limited | Knockcronal Wind Farm 33kV Substation Wind Onshore | MW Effective From moved from 30 Oct 2028 to 30 Oct 2029 (+365 days) |
| Lightsource Lower Frankton PRO-003859, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Cheshire Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2036 to 30 Oct 2037 (+365 days) |
| MALTBY DEV. PRO-003064, Firma Vogt Solar Ltd | Thurcroft 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days) |
| Penwortham Green Energy Centre PRO-001694-2, PENWORTHAM GREEN ENERGY LIMITED | Penwortham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2036 to 31 Oct 2037 (+365 days) |
| Project Number 4 PRO-002704, Greta IV Limited | North Anglia Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days) |
| West Weybridge PRO-003410, West Weybridge 10 Renewables Limited | London West Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 31 Oct 2038 (+365 days) |
| Zenobe Necton BESS PRO-003402, ZENOBE ENERGY LIMITED | Necton 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 31 Oct 2034 (+365 days) |
| High Marnham BESS PRO-003452, JG PEARS GRID CONNECTION LIMITED | High Marnham 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2033 to 30 Oct 2034 (+364 days) |
| WindyHill BESS2 Facility PRO-002032, ENERGYGRIDPOWER LTD | Windyhill 275/132kV Energy Storage System | MW Effective From moved from 30 Sep 2024 to 27 Jul 2025 (+300 days) |
| Norfolk Boreas PRO-000399-2, NORFOLK BOREAS LIMITED | Necton 400kV Substation Wind Offshore | MW Effective From moved from 31 Mar 2030 to 31 Dec 2030 (+275 days) |
| Twyn Hywel Cillfynydd PRO-001497, Twyn Hywel Energy Park Ltd | Cilfynydd 400kV Substation Wind Onshore | MW Effective From moved from 30 Jun 2025 to 31 Mar 2026 (+274 days) |
| Rothienorman Sync Comp PRO-001445, ROTHIENORMAN GRID SERVICES LIMITED | Rothienorman 400kV Substation Reactive Compensation | MW Effective From moved from 31 Mar 2024 to 31 Oct 2024 (+214 days) |
| Lakeside Energy Drax PRO-001522, LAKESIDE ENERGY STORAGE LIMITED | Drax 132kV Substation Energy Storage System | MW Effective From moved from 29 Mar 2024 to 29 Sep 2024 (+184 days) |
| Elchies Wind Farm PRO-000151-2, ELCHIES WIND LIMITED | Elchies 132/33kV Substation Wind Onshore | MW Effective From moved from 30 Jun 2028 to 30 Nov 2028 (+153 days) |
| Feckenham PRO-002189, ENSO GREEN HOLDINGS LIMITED | Feckenham 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Jul 2036 to 31 Oct 2036 (+92 days) |
| Glenshimmeroch Windfarm PRO-000440, ENERGYFARM UK GLENSHIMMEROCH LLP | SPT Margree collector substation Wind Onshore | MW Effective From moved from 26 Aug 2027 to 31 Oct 2027 (+66 days) |
| Bulls Lodge Farm PRO-002676, 548 UK INVESTMENT HOLDINGS LIMITED | Braintree 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Mar 2033 to 30 Apr 2033 (+31 days) |
| Thurrock Power Station PRO-000494, THURROCK FLEXIBLE GENERATION LIMITED | Tilbury 275kV Substation Energy Storage System;Gas Reciprocating | MW Effective From moved from 31 Oct 2024 to 28 Nov 2024 (+28 days) |
| Tillbridge Solar PRO-001126, TILLBRIDGE SOLAR LIMITED | Cottam 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 1 Aug 2028 to 27 Aug 2028 (+26 days) |
| Gastard BESS PRO-003552, SIRIUSECODEV (GASTARD) LTD | Melksham B 132KV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 15 Nov 2037 (+15 days) |
| Vanguard East PRO-000580-1, Norfolk Vanguard East Ltd | Necton 400kV Substation Wind Offshore | MW Effective From moved from 20 Mar 2028 to 1 Apr 2028 (+12 days) |
| Dove Solar PRO-004166, RWE RENEWABLES UK SOLAR AND STORAGE LIMITED | North Anglia Connection Node E 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2034 to 31 Oct 2034 (+1 days) |
| Sizing John (Rainhill) PRO-001581-1, SIZING JOHN LIMITED | Rainhill GSP Energy Storage System | MW Effective From moved from 30 Oct 2024 to 31 Oct 2024 (+1 days) |
| Connection date earlier 29 | ||
| Corshellach Battery Energy Storage System PRO-002328, Renewable Energy Systems Limited | Berry Burn GSP Energy Storage System | MW Effective From moved from 31 Oct 2031 to 31 Oct 2027 (−1,461 days) |
| Sellindge West PRO-003412, Sellindge West 10 Renewables Limited | East Kent connection node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 31 Oct 2033 (−1,461 days) |
| Windy Standard III Wind Farm PRO-000359-3, Windy Standard III Ltd | Dun Hill 132/33kV Wind Onshore | MW Effective From moved from 30 Jun 2029 to 1 Jun 2026 (−1,125 days) |
| Lightsource Yaxley PV PRO-003837, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | North Anglia Connection Node E 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 31 Oct 2034 (−1,096 days) |
| Ayr Farm PRO-003596, NEW ENERGY PARTNERSHIP LIMITED | Ayr 275/33kV Energy Storage System | MW Effective From moved from 30 Aug 2030 to 26 May 2028 (−826 days) |
| Tewitt Farm BESS PRO-003917, Apatura Battery Ltd | Bradford West GSP Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2035 (−732 days) |
| Saltend North BESS & PV PRO-002236, EEB74 LIMITED | Hedon 275kV Substation Energy Storage System | MW Effective From moved from 30 Oct 2037 to 30 Oct 2035 (−731 days) |
| West Haddon PRO-003417, West Haddon 10 Renewables Limited | Derbyshire Connection Node A 400kV Substation Demand;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2039 to 30 Oct 2037 (−731 days) |
| Lightsource Braybrooke PRO-003989, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | West Anglia Connection Node F 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2036 to 31 Oct 2034 (−730 days) |
| Lightsource Marston Vale 240MW PV+BESS PRO-003981, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Marston Vale 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2036 to 31 Oct 2034 (−730 days) |
| Lightsource Norton East PV PRO-003741, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Norton East 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2036 to 30 Oct 2035 (−367 days) |
| Middle Farm Chollerton PRO-004344, ENRAY POWER LTD | Borders Connection Node A 400kV Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2036 to 30 Oct 2035 (−367 days) |
| Arkwright PRO-003248, ARLINGTON (GROUP SERVICES) LIMITED | Chesterfield 400kV Substation (Not yet constructed) Energy Storage System | MW Effective From moved from 31 Oct 2035 to 30 Oct 2034 (−366 days) |
| Lightsource Overton PRO-003958, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | North Humber Connection Node E 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 30 Oct 2036 to 30 Oct 2035 (−366 days) |
| Amersham Main PRO-003404, Amersham 10 Renewables Limited | London North West Connection Node A 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2038 to 31 Oct 2037 (−365 days) |
| Butlers Energy Project PRO-003946, IG RENEWABLES SPV 1 LTD | Butlers Wood 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2035 to 31 Oct 2034 (−365 days) |
| Fell Wind Farm PRO-001755, ENERGYFARM UK FELL LLP | Fell Wind Farm 132/33kV Substation Wind Onshore | MW Effective From moved from 30 Oct 2028 to 31 Oct 2027 (−365 days) |
| Nethercourt Solar & BESS Farm PRO-003437, GREENTECH PROJECTS HOLDING UK LIMITED | Nethercourt Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2035 to 31 Oct 2034 (−365 days) |
| Zenobe Yaxley BESS PRO-004088, ZENOBE ENERGY LIMITED | North Anglia Connection Node E 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2035 to 31 Oct 2034 (−365 days) |
| Eredine Wind Farm PRO-002005, RWE RENEWABLES UK ONSHORE WIND LIMITED | An Suidhe 275/33kV Wind Onshore | MW Effective From moved from 31 Oct 2030 to 1 Nov 2029 (−364 days) |
| Recell at Penrhos (BEGA) PRO-000330-2, Recell Energy Bloom Developments Limited | Penrhos GSP Biomass | MW Effective From moved from 31 Oct 2027 to 8 Mar 2027 (−237 days) |
| JBM Solar 13 - Melksham PRO-000495, JBM SOLAR PROJECTS 13 LIMITED | Melksham 400kV Substation Thermal | MW Effective From moved from 30 Jun 2026 to 14 Nov 2025 (−228 days) |
| Carrington Lane BESS PRO-003215, Apatura Battery Ltd | Daines 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Cellarhead PV & BESS Station PRO-003240, IB VOGT UK LTD | Manchester South Connection Node B 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Coddington PRO-003750, STARLIGHT ENERGY UK LIMITED | Eaton Socon 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2034 to 30 Oct 2034 (−1 days) |
| Lightsource Bodelwyddan PRO-003877, LIGHTSOURCE RENEWABLE UK DEVELOPMENT LIMITED | Bodelwyddan 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Rhigos BESS PRO-003613, KONA ASSET 4 LIMITED | South Wales West Connection Node A 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Spennymoor BESS Station PRO-003681, IGP INTERNATIONAL PROSPECTING LIMITED | Spennymoor 400kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2035 to 30 Oct 2035 (−1 days) |
| Whitson BESS PRO-003862, FIELD DEVCO LTD | Whitson 275kV Substation Energy Storage System | MW Effective From moved from 31 Oct 2037 to 30 Oct 2037 (−1 days) |
| Connection date added 1 | ||
| Lochay (Part of Killin Cascade Hydro Scheme) PRO-000174, SSE GENERATION LIMITED | Lochay GSP Hydro | MW Effective From printed as 1 Jan 2027; blank in the file dated 27 Sep 2024 |
| Connection date removed 4 | ||
| Broken Cross Windfarm PRO-000395, BROKEN CROSS WIND FARM LIMITED | Broken Cross 132/33kV Wind Onshore | MW Effective From was 30 Sep 2023; blank in the file dated 20 Dec 2024 |
| Dogger Bank Project A PRO-000411, DOGGERBANK OFFSHORE WIND FARM PROJECT 1 PROJCO LIMITED | Dogger Bank 220kV Offshores Wind Offshore | MW Effective From was 1 Apr 2023; blank in the file dated 20 Dec 2024 |
| Walpole PRO-001114, PIVOTED POWER LLP | Walpole 400kV Substation Energy Storage System | MW Effective From was 31 Oct 2022; blank in the file dated 20 Dec 2024 |
| Sundon Pivoted Power PRO-001123, PIVOTED POWER LLP | Sundon 400kV Substation Energy Storage System | MW Effective From was 31 Oct 2023; blank in the file dated 20 Dec 2024 |
| Capacity up 10 | ||
| Drax Power Station PRO-000129, DRAX POWER LIMITED | Drax 400kV Substation Biomass | Cumulative Total Capacity changed from 1,905 MW to 3,906 MW (+2,001 MW) |
| Ayr Farm PRO-003596, NEW ENERGY PARTNERSHIP LIMITED | Ayr 275/33kV Energy Storage System | Cumulative Total Capacity changed from 300 MW to 500 MW (+200 MW) |
| Saltend North BESS & PV PRO-002236, EEB74 LIMITED | Hedon 275kV Substation Energy Storage System | Cumulative Total Capacity changed from 100 MW to 200 MW (+100 MW) |
| Drakelow PRO-000428, ENSO Green Holdings V Limited | Drakelow 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Cumulative Total Capacity changed from 57 MW to 120 MW (+63 MW) |
| Newarthill Energy Park PRO-002532, Geocore (Newarthill) Ltd | Newarthill Energy Park 275kV Substation Energy Storage System | Cumulative Total Capacity changed from 250 MW to 300 MW (+50 MW) |
| Richborough 1 PRO-001165, RICHBOROUGH ENERGY PARK LIMITED | Richborough 400kV Substation Energy Storage System | Cumulative Total Capacity changed from 50 MW to 100 MW (+50 MW) |
| Richborough 2 PRO-001164, RICHBOROUGH ENERGY PARK LIMITED | Richborough 400kV Substation Energy Storage System | Cumulative Total Capacity changed from 50 MW to 100 MW (+50 MW) |
| South Kyle 2 Wind farm PRO-001963, VATTENFALL WIND POWER LTD | South Kyle 2 132/33kV Substation Energy Storage System;Wind Onshore | Cumulative Total Capacity changed from 67 MW to 92.4 MW (+25.4 MW) |
| Lochay (Part of Killin Cascade Hydro Scheme) PRO-000174, SSE GENERATION LIMITED | Lochay GSP Hydro | Cumulative Total Capacity changed from 47 MW to 51.2 MW (+4.2 MW) |
| Mannington PRO-001091, PIVOTED POWER LLP | Mannington 400kV Substation Energy Storage System | Cumulative Total Capacity changed from 47.5 MW to 49.9 MW (+2.4 MW) |
| Capacity down 4 | ||
| Ratcliffe on Soar PRO-000050, UNIPER UK LIMITED | Ratcliffe-On-Soar 400kV Substation Demand;OCGT (Open Cycle Gas Turbine);PV Array (Photo Voltaic/solar);Waste | Cumulative Total Capacity changed from 2,021 MW to 1,224.7 MW (−796.3 MW) |
| Scarning PRO-003275, CONNECTID 3 LIMITED | North Anglia Connection Node C 400kV Substation Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | Cumulative Total Capacity changed from 1,400 MW to 800 MW (−600 MW) |
| NatPower Teesside Green Energy Park PRO-004207, NATPOWER MARINE LIMITED | Teeside Connection Node A 400kV Substation Energy Storage System | Cumulative Total Capacity changed from 1,034 MW to 1,000 MW (−34 MW) |
| Glenshimmeroch Windfarm PRO-000440, ENERGYFARM UK GLENSHIMMEROCH LLP | SPT Margree collector substation Wind Onshore | Cumulative Total Capacity changed from 50 MW to 45 MW (−5 MW) |
| Project status changed 21 | ||
| Lochay (Part of Killin Cascade Hydro Scheme) PRO-000174, SSE GENERATION LIMITED | Lochay GSP Hydro | Project Status changed from Built to Under Construction/Commissioning |
| Dogger Bank Project A PRO-000411, DOGGERBANK OFFSHORE WIND FARM PROJECT 1 PROJCO LIMITED | Dogger Bank 220kV Offshores Wind Offshore | Project Status changed from Under Construction/Commissioning to Built |
| Capenhurst PRO-000540, ENSO GREEN HOLDINGS LIMITED | Capenhurst 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Awaiting Consents to Scoping |
| Walpole PRO-001114, PIVOTED POWER LLP | Walpole 400kV Substation Energy Storage System | Project Status changed from Under Construction/Commissioning to Built |
| Sundon Pivoted Power PRO-001123, PIVOTED POWER LLP | Sundon 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Built |
| Highview Hunterston East Cryobattery PRO-001348, HVS GRIDCO LTD | Hunterston East 400kV Demand;Energy Storage System;Reactive Compensation | Project Status changed from Scoping to Consents Approved |
| Net Zero Teesside Power Project PRO-001400, NET ZERO TEESSIDE POWER LIMITED | Tod Point 275kV Substation CCGT (Combined Cycle Gas Turbine);Demand | Project Status changed from Awaiting Consents to Consents Approved |
| Cottam PRO-001502-1, GATE BURTON ENERGY PARK LIMITED | Cottam 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Cottam PRO-001502-2, GATE BURTON ENERGY PARK LIMITED | Cottam 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Lakeside Energy Drax PRO-001522, LAKESIDE ENERGY STORAGE LIMITED | Drax 132kV Substation Energy Storage System | Project Status changed from Consents Approved to Built |
| Dog Trap Lane PRO-001626, HD381GRE Limited | Minety 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Somerford PRO-001631, PD813ETY LTD | Minety 400kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Awaiting Consents to Consents Approved |
| Pond Hill Farm 2 BESS PRO-001635, PD688IRO LTD | Minety 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Pond Hill Farm 1 PRO-001637, PD688IRO LTD | Minety 400kV Substation Energy Storage System | Project Status changed from Awaiting Consents to Consents Approved |
| Essendine PRO-001643, MALLARD PASS SOLAR FARM LIMITED | Ryhall 400kV Substation PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Kinmuck PV and BESS Station PRO-001700, IGP SOLAR 24 LIMITED | Peterhead GSP Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Awaiting Consents |
| Meetlaw BESS PRO-001966, CARRAVINDOON LIMITED | Fiddes GSP Energy Storage System | Project Status changed from Scoping to Consents Approved |
| Ferrybridge B BESS & Solar Substation PRO-002521, O&G Solar (SPV 19) Limited | Ferrybridge B 132kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Barking BESS PRO-003518, O&G Solar (SPV 52) Limited | Barking 275kV Substation Energy Storage System;PV Array (Photo Voltaic/solar) | Project Status changed from Scoping to Consents Approved |
| Knocknagael BESS PRO-003712, VIRMATI ENERGY LTD | Knocknagael 132kV Substation Energy Storage System | Project Status changed from Scoping to Awaiting Consents |
| West Weybridge PRO-004324, EL (WEST WEYBRIDGE) LIMITED | West Weybridge 275kV Substation Energy Storage System | Project Status changed from Scoping to Consents Approved |
By plant type
| Plant type | Projects with a change | New | Back on the register | Removed | Net capacity change |
|---|---|---|---|---|---|
| Energy Storage System | 109 | 55 | 0 | 5 | +22,782.8 MW |
| Energy Storage System;PV Array (Photo Voltaic/solar) | 85 | 20 | 4 | 16 | +2,769.4 MW |
| Wind Onshore | 29 | 7 | 0 | 0 | +904 MW |
| Wind Offshore | 25 | 4 | 1 | 11 | −7,485 MW |
| Energy Storage System;Wind Onshore | 13 | 11 | 0 | 0 | +1,619 MW |
| Pump Storage | 5 | 2 | 0 | 1 | +550 MW |
| PV Array (Photo Voltaic/solar) | 5 | 1 | 0 | 1 | −450.1 MW |
| Reactive Compensation | 5 | 0 | 0 | 3 | 0 MW |
| Demand;PV Array (Photo Voltaic/solar) | 4 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore | 4 | 3 | 0 | 0 | +535 MW |
| Hydro | 4 | 2 | 0 | 1 | +39.2 MW |
| Biomass | 2 | 0 | 0 | 0 | +2,001 MW |
| Demand;Energy Storage System;PV Array (Photo Voltaic/solar) | 2 | 0 | 0 | 1 | −800 MW |
| Energy Storage System;Reactive Compensation | 2 | 0 | 0 | 0 | 0 MW |
| CCGT (Combined Cycle Gas Turbine) | 1 | 0 | 0 | 0 | 0 MW |
| CCGT (Combined Cycle Gas Turbine);Demand | 1 | 0 | 0 | 0 | 0 MW |
| Coal | 1 | 0 | 0 | 1 | −2,001 MW |
| Demand;Energy Storage System | 1 | 1 | 0 | 0 | +600 MW |
| Demand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | 1 | 1 | 0 | 0 | +1,000 MW |
| Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Reactive Compensation | 1 | 0 | 0 | 0 | −600 MW |
| Demand;Energy Storage System;Reactive Compensation | 1 | 0 | 0 | 0 | 0 MW |
| Demand;OCGT (Open Cycle Gas Turbine);PV Array (Photo Voltaic/solar);Waste | 1 | 0 | 0 | 0 | −796.3 MW |
| Demand;Wind Offshore | 1 | 1 | 0 | 0 | +600 MW |
| Demand;Wind Onshore | 1 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;Gas Reciprocating | 1 | 0 | 0 | 0 | 0 MW |
| Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore | 1 | 1 | 0 | 0 | +1,000 MW |
| Gas Reciprocating | 1 | 0 | 0 | 1 | −49.9 MW |
| Thermal | 1 | 0 | 0 | 0 | 0 MW |
Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own.
By connection site
| Connection site | Projects with a change | New | Back on the register | Removed | Net capacity change |
|---|---|---|---|---|---|
| Alverdiscott 400kV Substation | 6 | 0 | 0 | 6 | −6,500 MW |
| Ratcliffe-On-Soar 400kV Substation | 5 | 0 | 1 | 3 | −1,696.3 MW |
| Windyhill 275/132kV | 5 | 2 | 0 | 1 | +240 MW |
| Cottam 400kV Substation | 4 | 1 | 0 | 0 | +1,000 MW |
| Minety 400kV Substation | 4 | 0 | 0 | 0 | 0 MW |
| North Anglia Connection Node B 400kV Substation | 4 | 3 | 0 | 0 | +1,500 MW |
| Tealing 275/33kV Substation | 4 | 0 | 1 | 3 | −1,685 MW |
| West Burton 132kV Substation | 4 | 0 | 1 | 3 | −269.7 MW |
| Wylfa 400kV Substation | 4 | 2 | 0 | 1 | +350 MW |
| Calderside 275kV Substation | 3 | 2 | 0 | 1 | +500 MW |
| Capenhurst 275kV Substation | 3 | 0 | 0 | 2 | −906.9 MW |
| Dun Hill 132/33kV | 3 | 0 | 0 | 0 | 0 MW |
| East Kilbride B 275/33kV Substation | 3 | 3 | 0 | 0 | +160 MW |
| Elstree 275kV Substation | 3 | 0 | 1 | 2 | −106.9 MW |
| Enderby 400kV Substation | 3 | 1 | 0 | 0 | +500 MW |
| Finlarig GSP | 3 | 2 | 0 | 1 | +35 MW |
| Necton 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| North Anglia Connection Node E 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| Pembroke 400kV Substation | 3 | 1 | 0 | 0 | +240 MW |
| Rayleigh Main 400kV Substation | 3 | 0 | 1 | 2 | −106.9 MW |
| Red John 275kV Switching Station | 3 | 2 | 0 | 1 | +550 MW |
| Richborough 400kV Substation | 3 | 0 | 0 | 1 | +100 MW |
| RWE North Sea Offshore Substation | 3 | 2 | 0 | 1 | +350 MW |
| Spennymoor 400kV Substation | 3 | 0 | 0 | 0 | 0 MW |
| Bicker Fen 400kV Substation | 2 | 0 | 0 | 0 | 0 MW |
Net capacity change counts new rows, removed rows and capacity changes. Rows back on the register are counted on their own. Top 25 of 220.
Earlier comparisons
Data as published by NESO on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails. Source: NESO TEC Register, NESO Open Data Licence (Supported by National Energy SO Open Data). How this page is made: Method. Spotted an error? corrections@n84.dev.