N84 Grid

Red Hill Energy Park

Developer as published, connection site, reference: Renewable Energy Systems Limited. Monk Fryston 275kV Substation (NGET). PRO-002482. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWHybrid
Connection date24 Oct 2035Status as printed: Scoping
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20352036File dated 2024-05-31: connection date 2035-10-24Oct 2035File dated 2024-09-27: connection date 2035-10-2431 May202427 Sep2024
20352036File dated 2024-05-31: connection date 2035-10-24Oct 2035File dated 2024-09-27: connection date 2035-10-2431 May202427 Sep2024

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 27 Sep 2024. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.