Loch Fearna Pumped Storage (FEARNA PSH LIMITED)

Developer as published, connection site, reference: FEARNA PSH LIMITED. Loch Fearna Pumped Storage 400/18kV Substation (SHET). PRO-002569.

Sign in to watch this project
Capacity300 MWHydro and pumped storage
Connection date28 Oct 2032Status as printed: Awaiting Consents
First date seen 31 Oct 2029, difference +1093 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20322033File dated 2024-05-31: connection date 2032-10-28Oct 2032File dated 2026-10-20: connection date 2032-10-2831 May202420 Oct2026
20322033File dated 2024-05-31: connection date 2032-10-28Oct 2032File dated 2026-10-20: connection date 2032-10-2831 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Project Status printed as Awaiting Consents (previous file: Scoping). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedScoping → Awaiting ConsentsReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1317Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1297