N84 Grid

Drakelow (ENSO GREEN HOLDINGS V LIMITED)

Developer as published, connection site, reference: ENSO GREEN HOLDINGS V LIMITED. Drakelow 400kV Substation (NGET). PRO-000428.

Sign in to watch this project
Capacity120 MWBattery storage, Gate 1
Connection date1 Dec 2027Status as printed: Scoping
First date seen 31 Oct 2024, difference +1126 dayscalculated by N84
MW ahead in N84's order at this site632.3 MWcalculated by N84

Connection date, edition by edition

20272028File dated 2024-05-31: connection date 2027-12-01Dec 2027File dated 2026-10-20: connection date 2027-12-0131 May202420 Oct2026
20272028File dated 2024-05-31: connection date 2027-12-01Dec 2027File dated 2026-10-20: connection date 2027-12-0131 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.