Strath Tirry

Developer as published, connection site, reference: Strath Tirry Wind Energy 2021 Ltd. Lairg GSP (SHET). PRO-001363.

Sign in to watch this project
Capacity34.8 MWOnshore wind
Connection date19 Dec 2029Status as printed: Scoping
First date seen 31 Oct 2025, difference +1510 dayscalculated by N84
MW ahead in N84's order at this site50 MWcalculated by N84

Connection date, edition by edition

20292030File dated 2024-05-31: connection date 2029-12-19Dec 2029File dated 2026-10-20: connection date 2029-12-1931 May202420 Oct2026
20292030File dated 2024-05-31: connection date 2029-12-19Dec 2029File dated 2026-10-20: connection date 2029-12-1931 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.