North-East Offshore Hybrid Asset

Developer as published, connection site, reference: National Grid Interconnector Holdings Limited. Kintore GSP (SHET). PRO-004942.

Sign in to watch this project
Capacity1,800 MWHybrid, Gate 1
Connection date30 Jun 2037Status as printed: Scoping
MW ahead in N84's order at this site593.2 MWcalculated by N84

Connection date, edition by edition

20372038File dated 2026-03-27: connection date 2037-06-30Jun 2037File dated 2026-10-20: connection date 2037-06-3027 Mar202620 Oct2026
20372038File dated 2026-03-27: connection date 2037-06-30Jun 2037File dated 2026-10-20: connection date 2037-06-3027 Mar202620 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 27 Mar 2026 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data