Hinkley Point B

Developer as published, connection site, reference: EDF Energy Nuclear Generation Limited. Hinkley Point 400kV Substation (NGET). PRO-000141. Not in the latest file

Sign in to watch this project
Capacity0 MWNuclear
Connection datenot statedStatus as printed: Built
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

No date history to draw

The files N84 holds in your history window print no connection date for this project.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Not printed in this file; printed in the previous one. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedpresent → missingReceipt: NESO TEC Register, file dated 20 Oct 2026Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1011

Supported by National Energy SO Open Data