Breakish Windfarm

Developer as published, connection site, reference: ARISE AB. Breakish 132kV Substation (SHET). PRO-002170.

Sign in to watch this project
Capacity99.8 MWOnshore wind, Gate 1
Connection date30 Apr 2034Status as printed: Scoping
First date seen 31 May 2029, difference +1795 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

Only one edition so far

N84 holds one edition of this register for the project, so there is no earlier date to compare. The chart appears when a later edition is collected.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 275Receipt: NESO TEC Register, file dated 11 Sep 2026, row 272
  2. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 274Receipt: NESO TEC Register, file dated 11 Sep 2026, row 271

Supported by National Energy SO Open Data