N84 Grid

Lovat Estate BESS

Developer as published, connection site, reference: LG-B-50a Limited. Beauly 132/33 kV GSP Substation (SHET). PRO-003062.

Sign in to watch this project
Capacity49.9 MWBattery storage, Gate 2
Connection date31 May 2026Status as printed: Consents Approved
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20262027File dated 2024-09-27: connection date 2026-05-31May 2026File dated 2026-10-20: connection date 2026-05-3127 Sep202420 Oct2026
20262027File dated 2024-09-27: connection date 2026-05-31May 2026File dated 2026-10-20: connection date 2026-05-3127 Sep202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 27 Sep 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Project Status printed as Consents Approved (previous file: Scoping). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedScoping → Consents ApprovedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1342Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1322

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.