N84 Grid

Elmya Kilworth BESS & PV

Developer as published, connection site, reference: RPC ELMYA CARNATION KILWORTH LIMITED. Derbyshire Connection Node H 400kV Substation (NGET). PRO-004739.

Sign in to watch this project
Capacity850 MWHybrid, Gate 1
Connection date30 Oct 2037Status as printed: Scoping
MW ahead in N84's order at this site500 MWcalculated by N84

Connection date, edition by edition

20372038File dated 2024-09-27: connection date 2037-10-30Oct 2037File dated 2026-10-20: connection date 2037-10-3027 Sep202420 Oct2026
20372038File dated 2024-09-27: connection date 2037-10-30Oct 2037File dated 2026-10-20: connection date 2037-10-3027 Sep202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 27 Sep 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO TEC Register, file dated 20 Oct 2026, row 707Receipt: NESO TEC Register, file dated 17 Apr 2026, row 703
  2. 20 Oct 2026. Printed again after being absent from the previous file. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedleft_register → presentReceipt: NESO TEC Register, file dated 20 Oct 2026, row 707Receipt: NESO TEC Register, file dated 17 Apr 2026, row 703

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.