Keithick 16 Solar & BESS

Developer as published, connection site, reference: SIRIUS ECODEV (KEITHICK) LTD. Coupar Angus 132/33kV GSP (SHET). PRO-001890.

Sign in to watch this project
Capacity16 MWHybrid, Gate 2
Connection date31 Dec 2026Status as printed: Consents Approved
First date seen 30 Jun 2024, difference +914 dayscalculated by N84
MW ahead in N84's order at this site49.99 MWcalculated by N84

Connection date, edition by edition

20262027File dated 2026-09-11: connection date 2026-06-30Jun 2026File dated 2026-10-20: connection date 2026-12-31Dec 202611 Sep202620 Oct2026
20262027File dated 2026-09-11: connection date 2026-06-30Jun 2026File dated 2026-10-20: connection date 2026-12-31Dec 202611 Sep202620 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Gate printed as 2 (previous file: blank). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 2Receipt: NESO TEC Register, file dated 20 Oct 2026, row 1134Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1114
  2. 20 Oct 2026. MW Effective From printed as 31 Dec 2026 (previous file: 30 Jun 2026), 184 days later. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. +184 dayscalculated by N84 Wide comparison Correction after an older file was importedReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1134Receipt: NESO TEC Register, file dated 11 Sep 2026, row 1114