N84 Grid

Patford Bridge Farm

Developer as published, connection site, reference: 548 UK INVESTMENT HOLDINGS LIMITED. Patford Bridge 400kV Substation (NGET). PRO-002680.

Sign in to watch this project
Capacity200 MWHybrid, Gate 1
Connection date31 Oct 2033Status as printed: Scoping
MW ahead in N84's order at this site249.9 MWcalculated by N84

Connection date, edition by edition

20332034File dated 2024-05-31: connection date 2033-10-31Oct 2033File dated 2026-10-20: connection date 2033-10-3131 May202420 Oct2026
20332034File dated 2024-05-31: connection date 2033-10-31Oct 2033File dated 2026-10-20: connection date 2033-10-3131 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Printed again after being absent from the previous file. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedleft_register → presentReceipt: NESO TEC Register, file dated 20 Oct 2026, row 1632Receipt: NESO TEC Register, file dated 17 Apr 2026, row 1636

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.