Care Brentwood BEGA

Developer as published, connection site, reference: CARE POWER (BRENTWOOD) LIMITED. Warley 275kV Substation (NGET). PRO-006780.

Sign in to watch this project
Capacity49.9 MWBattery storage
Connection datenot statedStatus as printed: Built
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

Only one edition so far

N84 holds one edition of this register for the project, so there is no earlier date to compare. The chart appears when a later edition is collected.

Observed changes

N84 holds 10 editions of the NESO TEC Register back to 31 May 2024. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Printed in this file and not in the previous one. N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → PRO-006780Receipt: NESO TEC Register, file dated 20 Oct 2026, row 357

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.