N84 Grid

ROSEBANK STREET (solar)

Developer as published, connection site, reference: ROSEBANK STREET. SSEN-1MW-6987c53ad588. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWSolar
Connection date30 Sep 2026Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20262027File dated 2024-09-01: connection date 2026-09-30Sep 2026File dated 2026-08-01: connection date 2026-09-301 Sep20241 Aug2026
20262027File dated 2024-09-01: connection date 2026-09-30Sep 2026File dated 2026-08-01: connection date 2026-09-301 Sep20241 Aug2026

The connection date is printed the same in every file N84 holds for this project, from 1 Sep 2024 to 1 Aug 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Not printed in two consecutive files. Between the files dated 1 Sep 2026 and 1 Oct 2026.missing → left_registerReceipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026Receipt: SSEN Embedded Capacity Register, file dated 1 Aug 2026, row 2638

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.