PANGBOURNE (solar, 1.5 MW)

Developer as published, connection site, reference: PANGBOURNE. SSEN-1MW-71580b0e9369.

Sign in to watch this project
Capacity1.5 MWSolar
Connection date31 Aug 2027Status as printed: Accepted to Connect
First date seen 4 Jun 2027, difference +88 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20272028File dated 2026-09-01: connection date 2027-06-04Jun 2027File dated 2026-10-01: connection date 2027-08-31Aug 20271 Sep20261 Oct2026
20272028File dated 2026-09-01: connection date 2027-06-04Jun 2027File dated 2026-10-01: connection date 2027-08-31Aug 20271 Sep20261 Oct2026

Each step is a file that printed the connection date differently from the file before it. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Target energisation date printed as 31 Aug 2027 (previous file: 4 Jun 2027), 88 days later. Between the files dated 1 Sep 2026 and 1 Oct 2026. +88 dayscalculated by N84Receipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026, row 2788Receipt: SSEN Embedded Capacity Register, file dated 1 Sep 2026, row 2793

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.