Cottered

Developer as published, connection site, reference: LITTLETON PASTURES SOLAR LIMITED. West Anglia Connection Node D 400kV Substation (NGET). PRO-002173.

Sign in to watch this project
Capacity600 MWHybrid
Connection date30 Oct 2030Status as printed: Scoping
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20302031File dated 2024-05-31: connection date 2030-10-30Oct 2030File dated 2026-10-20: connection date 2030-10-3031 May202420 Oct2026
20302031File dated 2024-05-31: connection date 2030-10-30Oct 2030File dated 2026-10-20: connection date 2030-10-3031 May202420 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 31 May 2024 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Customer name printed as LITTLETON PASTURES SOLAR LIMITED (previous file: SSE COTTERED SOLAR LIMITED). N84 holds no copy between 11 Sep 2026 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedSSE COTTERED SOLAR LIMITED → LITTLETON PASTURES SOLAR LIMITEDReceipt: NESO TEC Register, file dated 20 Oct 2026, row 482Receipt: NESO TEC Register, file dated 11 Sep 2026, row 473