CAIRNFORD (hybrid)

Developer as published, connection site, reference: CAIRNFORD. SSEN-1MW-8b9456ea0a1a. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWHybrid
Connection date31 Oct 2031Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20312032File dated 2025-04-01: connection date 2031-10-31Oct 2031File dated 2026-06-01: connection date 2031-10-311 Apr20251 Jun2026
20312032File dated 2025-04-01: connection date 2031-10-31Oct 2031File dated 2026-06-01: connection date 2031-10-311 Apr20251 Jun2026

The connection date is printed the same in every file N84 holds for this project, from 1 Apr 2025 to 1 Jun 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.