NAIRN CENTRAL (solar)

Developer as published, connection site, reference: NAIRN CENTRAL. SSEN-1MW-0db459364ea9. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWSolar
Connection date7 Feb 2026Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20262027File dated 2025-03-01: connection date 2026-02-07Feb 2026File dated 2026-08-01: connection date 2026-02-071 Mar20251 Aug2026
20262027File dated 2025-03-01: connection date 2026-02-07Feb 2026File dated 2026-08-01: connection date 2026-02-071 Mar20251 Aug2026

The connection date is printed the same in every file N84 holds for this project, from 1 Mar 2025 to 1 Aug 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Not printed in two consecutive files. Between the files dated 1 Sep 2026 and 1 Oct 2026. Correction after an older file was importedmissing → left_registerReceipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026Receipt: SSEN Embedded Capacity Register, file dated 1 Aug 2026, row 2688