Kulizumboo Interconnector

Developer as published, connection site, reference: KULIZUMBOO LIMITED. Canterbury 400kV GIS Substation (NGET). PRO-001290.

Sign in to watch this project
Capacity700 MWInterconnector, Gate 1
Connection date1 Apr 2031Status as printed: Scoping
First date seen 31 Oct 2027, difference +1248 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20312032File dated 2022-02-15: connection date 2031-04-01Apr 2031File dated 2026-10-20: connection date 2031-04-0115 Feb202220 Oct2026
20312032File dated 2022-02-15: connection date 2031-04-01Apr 2031File dated 2026-10-20: connection date 2031-04-0115 Feb202220 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 15 Feb 2022 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Connection site printed as Canterbury 400kV GIS Substation (previous file: Canterbury North 400kV Substation). N84 holds no copy between 22 Jul 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedCanterbury North 400kV Substation → Canterbury 400kV GIS SubstationReceipt: NESO Interconnector Register, file dated 20 Oct 2026, row 20Receipt: NESO Interconnector Register, file dated 22 Jul 2025, row 18

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.