WEST END (solar, 0.03 MW)

Developer as published, connection site, reference: WEST END. SSEN-50KW-5ab68c937610.

Sign in to watch this project
Capacity0.03 MWSolar
Connection date14 Sep 2027Status as printed: Accepted to Connect
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20272028File dated 2026-05-01: connection date 2027-09-14Sep 2027File dated 2026-10-01: connection date 2027-09-141 May20261 Oct2026
20272028File dated 2026-05-01: connection date 2027-09-14Sep 2027File dated 2026-10-01: connection date 2027-09-141 May20261 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 May 2026 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

N84 holds 39 editions of the SSEN Embedded Capacity Register back to 1 Aug 2023. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Printed in this file and not in the previous one. Between the files dated 1 Sep 2026 and 1 Oct 2026. Correction after an older file was importedblank → SSEN-50KW-5ab68c937610Receipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026, row 1471